Jump to content
Saylin

NVC Filers - April 2014

 Share

5,795 posts in this topic

Recommended Posts

So I got my NVC case number today, I know it was today because I called as soon as they opened and nothing, and then called right now and I got it :)
I knew it would be today, hence double call, because of the database. so yey!

Anyway they gave me IIN & BIN but said they couldn't take email yet because it had just been entered, when should I call to provide it? Should I try monday or give it 2-3 days?

I am all for calling often, but only if I legitimately think something can change because a) one time I asked and that person had a record of my previous calls which was a little bit intimidating. Probably explains why they are not as nice to people who call often.

By the way, the spreadsheet currently says someone got their case number on Saturday, April 19.... NVC is closed saturdays as far as I know and I think for sakes of avoiding issues dates should be kept in relation to location of NVC as in Eastern Time Zone. I mean otherwise it may create innacurate results for what day is covered.

Always double check your documents and forms. Not only do you get delayed by RFEs and Checklists, but the time it takes for them to review the new items you send could be used to approve more applications. Save yourself and others valuable time!

Current Status: NVC:
-Assigned and Received NVC Case Number, IIN, and BIN April 18, 2014. (100% sure case # was assigned today because I called twice and it wasn't assigned in the morning when they opened but in the afternoon it was)
*Could not provide email then as case was still being updated in their system
-On April 21, 2014 I was able to provide my email and beneficiary's.
-On April 28 I was able to fill out DS-261
-On April 29 I received and paid AOS Fee (at 1pm)
-On May 1 I received and paid IV Fee (at 1pm [became available]), also AOS Fee shows as PAID
-On May 5 IV Fee shows as PAID and DS-260 became available and was completed. Also, AOS Package Scanned by NVC

-On May 7 IV Package Scanned by NVC

-On May 28 AOS Accepted

-On June 2 IV Accepted/Case Complete

-On June 11 Interview Email Received

-On July 3 Interview at Moscow

Note: Medical Exam scheduled after interview letter received by calling the specific clinic, earliest appointment was 2 weeks ahead)

-Visa approved, came to us, got greencard, sadly things didnt go well and divorced. Last I hears she was still in the US and got a full greencard (I notified USCIS of divorce though)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

none or blank. This is a box that is okay to be blank or write NONE.

It's applicable, you just don't have one.

What question is this referring to? Don't want to have to ask again when it's my turn to fill it in. Thank you in advance. :)

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

I keep a call log that looks kinda like this:

Date:

Time:

Agent:

Info:

Will do hehehe sounds like fun and I see only Joy Miss Nasty Pants is the only mean one so far. :rofl:

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Haiti
Timeline

So I got my NVC case number today, I know it was today because I called as soon as they opened and nothing, and then called right now and I got it :)

I knew it would be today, hence double call, because of the database. so yey!

Anyway they gave me IIN & BIN but said they couldn't take email yet because it had just been entered, when should I call to provide it? Should I try monday or give it 2-3 days?

I am all for calling often, but only if I legitimately think something can change because a) one time I asked and that person had a record of my previous calls which was a little bit intimidating. Probably explains why they are not as nice to people who call often.

By the way, the spreadsheet currently says someone got their case number on Saturday, April 19.... NVC is closed saturdays as far as I know and I think for sakes of avoiding issues dates should be kept in relation to location of NVC as in Eastern Time Zone. I mean otherwise it may create innacurate results for what day is covered.

Snipe, your timeline says NVC received your case on April 14. is it right ?

  • I 130 sent to chicago lockbox: september 7, 2013
  • email received with case number: september 11
  • NOA1 received: Sepember 15 / PD: september 09
  • Transferred to NSC: Feb, 25 2014

Approved (email): 14 Mar 2014 :dancing: :dancing:

  • Shipped to NVC: March 21 2014
  • NVC received: April 02 2014 :dancing:
  • Case #: May 2 2014 :content:
  • DS261 completed: May 6 2014
  • AOS Invoiced and PAID: May 7 2014
  • AOS fee show Paid : May 10 2014
  • AOS package scanned: May 16 2014
  • IV fee invoiced and Paid: May 20,20
  • DS 260 submitted and IV package sent: May 23, 2014
  • IV package scanned: June 3rd 2014
  • AOS approved : June 17th 2014 (false check list and NVC rep confirmation)
  • AOS fee changed NA: July 8 2014
  • Case Completed by Joy :rofl: : July 9 2014
  • Interview date assigned: July 10 2014
  • Medical done: July 23 2014
  • Interview: August 20, 2014 (Approved)
  • Visa issued : August 22, 2014
  • visa available for pick up: August 25, 2014
  • Visa in hand: August 27, 2014
  • POE : Sept 13 2014
  • SSC received:Sept 20 2014
  • ​GC in production: Nov 14 2014
  • GC mailed: Feb 27 2015

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

Someone asked me this question I pray someone can help this person and I'm sending them the link here.

My question is does required my Birth Certificate to attach with any documents like AOS or IV packages? If yes, is it original or a copy?

Another question that is in DS-260 form what is the below meaning.

1. Document ID = is this meaning passport number?

2. Country/Authority that issued document = is this meaning passport issued country?

3. Issuance date = is this meaning passport issue date?

4. Experation date = is this meaning passport expire date?

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Well, we were not lucky this week... Just called NVC and we don't have case complete yet :(

Looks like next week might be the one for us. I'm calling back on Monday :blush:

Dear john let me know how that goes! Fingers crossed we have the same dates for IV package. I was going to wait until Tuesday to check the status

USCIS*

07/17/13: NOA 1

01/03/14: Transferred to Texas

01/24/14: NOA 2

02/10/14: shipped to NVC

NVC*

02/18/14: Case received by NVC

03/21/14: NVC Case# Received

03/27/14: AOS shows paid

03/27/14: dropped off AOS package at post office

03/31/14: AOS received at NVC

04/02/14: IV shows paid

04/02/14: DS-260 Completed

04/02/14: dropped off IV package and resent I-864

04/04/14: Received at NVC (IV package and I-864)

04/16/14: received a real checklist for I-864

04/20/14: AOS accepted

04/22/14: received a real checklist for IV package (birth certificate :cry:)

04/23/14: NVC received checklist item (IV package)

05/14/14: Case complete at NVC

05/21/14: email about case complete

06/12/14: Received email for interview (P4)

06/23/14: Medical done

07/02/14: Pick up medical results

07/07/14: Interview Date----Approved :dancing:

07/14/14: Received Visa in hands

07/23/14:POE JFK

08/2?/14:Had to apply for SSN-- received in mail--- applied three weeks later and received less than a week after

09/02/14:Conditional Green CARD received in mail

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

Hey, just curious, what do you mean you knew it would be today because of the database? What database, and what means did you have of finding out you were getting a case number soon?

So I got my NVC case number today, I know it was today because I called as soon as they opened and nothing, and then called right now and I got it :)
I knew it would be today, hence double call, because of the database. so yey!

Anyway they gave me IIN & BIN but said they couldn't take email yet because it had just been entered, when should I call to provide it? Should I try monday or give it 2-3 days?

I am all for calling often, but only if I legitimately think something can change because a) one time I asked and that person had a record of my previous calls which was a little bit intimidating. Probably explains why they are not as nice to people who call often.

By the way, the spreadsheet currently says someone got their case number on Saturday, April 19.... NVC is closed saturdays as far as I know and I think for sakes of avoiding issues dates should be kept in relation to location of NVC as in Eastern Time Zone. I mean otherwise it may create innacurate results for what day is covered.

Link to comment
Share on other sites

So I got my NVC case number today, I know it was today because I called as soon as they opened and nothing, and then called right now and I got it :)

I knew it would be today, hence double call, because of the database. so yey!

Anyway they gave me IIN & BIN but said they couldn't take email yet because it had just been entered, when should I call to provide it? Should I try monday or give it 2-3 days?

I am all for calling often, but only if I legitimately think something can change because a) one time I asked and that person had a record of my previous calls which was a little bit intimidating. Probably explains why they are not as nice to people who call often.

By the way, the spreadsheet currently says someone got their case number on Saturday, April 19.... NVC is closed saturdays as far as I know and I think for sakes of avoiding issues dates should be kept in relation to location of NVC as in Eastern Time Zone. I mean otherwise it may create innacurate results for what day is covered.

I'm kinda distracted by researching cat stuff at the moment (our new apartment allows cats!! :D), so I just absent-mindedly copied the responses to the spreadsheet not even realizing 4/19 is tomorrow (for those of us here in the US). Updated that member's line to reflect today's date instead ;) Thanks for catching that (cause I sure didn't :lol: )

Edited by Saylin
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

Snipe nevermind! I'm guessing by database you meant the spreadsheet database, and when I looked at it I noticed they were so consistent within the 30 day average from received to case number assigned, so I got what you were saying now sorry!

Link to comment
Share on other sites

What question is this referring to? Don't want to have to ask again when it's my turn to fill it in. Thank you in advance. :)

A# for US born citizens

You have brains in your head. You have feet in your shoes. You can steer yourself any direction you choose.  - Dr. Seuss

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

I'm excited for next week and what is yet to come!

July 1st 2013: NOA1

January 9th 2014: Transferred to CSC

January 16th 2014: NOA2

January 24 2014: Case recieved at NVC

March 5 2014: Received case number, IIN, & BIN

March 7 2014: Paid AOS feeMarch 8 2014: Filled out DS-261

March 11 2014: Sent AOS packageMarch 14 2014: AOS package arrived at NVC

March 18 2014: AOS package entered in system

March 25 2014: Paid IV feeMarch 28 2014: Received AOS checklist

March 31 2014: Completed and sent DS-260April 2 2014: Sent AOS package revision

April 4 2014: AOS revision arrived at NVC

April 8 2014: AOS revision entered in system

April 8 2014: Sent IV package

April 11 2014: IV package received at NVC

April 15 2014: IV package entered into system

April 21 2014: DS-260 accepted

April 30 2014: Case Complete

May 13 2014: Interview Date Assigned

INTERVIEW DATE: JUNE 4 2014

Link to comment
Share on other sites

Filed: Country: Mexico
Timeline

I'm excited for next week and what is yet to come!

Good luck with everything! As a fellow filer from Mexico, you'll have to let me know how your interview experience goes once you get there. :)

USCIS

9/23/2013: Sent I-130 petition to Chicago Lockbox through UPS
9/25/2013: I-130 delivered by UPS (Priority Date)

9/26/2013: NOA1

3/04/2014: Transferred to NSC

4/17/2014: NOA2

4/23/2014: Case shipped to NVC

NVC

5/05/2014: Case arrived at NVC

5/29/2014: Case number and IIN received

6/06/2014: DS-261 available and completed

6/09/2014: AOS fee invoiced and paid

6/10/2014: AOS fee shows as "paid"

6/16/2014: Date NVC is going by for DS-261 because I "re-opened" it

6/24/2014: AOS package sent

7/02/2014: AOS package scanned in

8/14/2014: AOS package approved (false checklist email for DS-261)
8/19/2014: DS-261 accepted

8/21/2014: IV fee invoiced and paid

8/22/2014: DS-260 available

8/25/2014: DS-260 submitted

8/25/2014: IV package sent

8/28/2014: IV package scanned

10/23/2014: CASE COMPLETE

CONSULATE
11/03/2014: Interview scheduled

12/01/2014: Medical and biometrics appointments

12/02/2014: Interview
12/02/2014: APPROVED!!!

I-751

11/21/2016: I-751 package sent to CSC

11/28/2016: NOA I-797

12/02/2016: Biometrics appointment issued

12/22/2016: Biometrics appointment

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

Well, we were not lucky this week... Just called NVC and we don't have case complete yet :(

Looks like next week might be the one for us. I'm calling back on Monday :blush:

Just say to yourself, everything is for a reason and God willing you will get a great counselor for the interview. Just take a deep breath know it will be soon and in it's time. I know it's not easy because I'm living it still and am not as close as I would like. (F)

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

I'm kinda distracted by researching cat stuff at the moment (our new apartment allows cats!! :D), so I just absent-mindedly copied the responses to the spreadsheet not even realizing 4/19 is tomorrow (for those of us here in the US). Updated that member's line to reflect today's date instead ;) Thanks for catching that (cause I sure didn't :lol: )

I know about cat's I have four rescues from the USA and two from Cairo Egypt they are Egyptian Mau's so if you need any help please let me know might be able to help you. Would be my honor since you have helped so many in their struggles with immigration. :)(F)

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

Good luck with everything! As a fellow filer from Mexico, you'll have to let me know how your interview experience goes once you get there. :)

July 1st 2013: NOA1

January 9th 2014: Transferred to CSC

January 16th 2014: NOA2

January 24 2014: Case recieved at NVC

March 5 2014: Received case number, IIN, & BIN

March 7 2014: Paid AOS feeMarch 8 2014: Filled out DS-261

March 11 2014: Sent AOS packageMarch 14 2014: AOS package arrived at NVC

March 18 2014: AOS package entered in system

March 25 2014: Paid IV feeMarch 28 2014: Received AOS checklist

March 31 2014: Completed and sent DS-260April 2 2014: Sent AOS package revision

April 4 2014: AOS revision arrived at NVC

April 8 2014: AOS revision entered in system

April 8 2014: Sent IV package

April 11 2014: IV package received at NVC

April 15 2014: IV package entered into system

April 21 2014: DS-260 accepted

April 30 2014: Case Complete

May 13 2014: Interview Date Assigned

INTERVIEW DATE: JUNE 4 2014

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...