Im Filipina and my husband is American. We met June of last year here in the Philippines when I got back from the US from my one-year hotel internship in Philadelphia, PA. We got married last July 31, 2013 here in the Philippines. He went back to America last August 23 to continue his schooling, as he is still in college. Now, our dilemma is just like most of the newly married Fil-Am couples here: what to do next to be able to bring the Filipina wife to the US to live with her husband. Im only 23 yrs old and my husband is 22, and though we've researched about the K3 and CR1/IR1 visas, we still dont know which route is the best place for us to go. We also have a lot of questions, and our main concern is how long the process will take for us. We want to be together as soon as possible; its hard and painful to be away from your spouse, especially in the first year of marriage. Please help us!

JUNE 2012 - Met and became friends

NOVEMBER 2012 - He went back to the US crying.gif

DECEMBER 27, 2012 - Became an official couple! blush.pngyes.gif

APRIL 16, 2013 - Got engaged!

JULY 8, 2013 - Reunited in Manila, Philippines

JULY 31, 2013 - Got Married! happy.pngtongue.pngbiggrin.png

NOVEMBER 26, 2013 - Sent out I-130 Application

NOVEMBER 29, 2013 - USCIS received our case

DECEMBER 4, 2013 - NOA1 (email)

DECEMBER 9, 2013 - NOA1 (hard copy)

DECEMBER 12, 2013 - NOA2 (email)

Shipped off to Department of State

DECEMBER 16, 2013 - NOA2 (hard copy)

JANUARY 9, 2014 - NVC received case

JANUARY 23, 2014 - Received AOS Fee Invoice

JANUARY 24, 2014 - Paid AOS Fee

JANUARY 28, 2014 - Received IV Fee Invoice

FEBRUARY 2, 2014 - Paid IV Fee

FEBRUARY 7, 2014 - Mailed IV Package

FEBRUARY 20, 2014 - Sent AoS Package

FEBRUARY 28, 2014 - Received Checklist for AoS

MARCH 4, 2014 - Sent response to AoS Checklist

MARCH 13, 2014 - CASE COMPLETE @ NVC

MARCH 21, 2014 - Case shipped out

MARCH 35, 2014 - Case Ready at US Embassy Manila ^_^

APRIL 3, 2014 - Interview at US Embassy Manila (APPROVED!)

APRIL 12, 2014 - Flew and arrived at my new home, Watertown, NY

APRIL 1, 2016 - Sent my i-751 Package

APRIL 4, 2016 - USCIS Vermont Center received my package



45fcba76-dcf8-4d13-9800-9ff9e76c8165_zps2ffbe589-1121-406b-8583-87942414e03e_zps66e10146-4e62-4733-aedc-f6d3709abdc1_zps

  • Replies 33
  • Created
  • Last Reply

Top Posters In This Topic

Posted

Im confused. What do you mean when you said K3 is dead? Is that option no longer available?

JUNE 2012 - Met and became friends

NOVEMBER 2012 - He went back to the US crying.gif

DECEMBER 27, 2012 - Became an official couple! blush.pngyes.gif

APRIL 16, 2013 - Got engaged!

JULY 8, 2013 - Reunited in Manila, Philippines

JULY 31, 2013 - Got Married! happy.pngtongue.pngbiggrin.png

NOVEMBER 26, 2013 - Sent out I-130 Application

NOVEMBER 29, 2013 - USCIS received our case

DECEMBER 4, 2013 - NOA1 (email)

DECEMBER 9, 2013 - NOA1 (hard copy)

DECEMBER 12, 2013 - NOA2 (email)

Shipped off to Department of State

DECEMBER 16, 2013 - NOA2 (hard copy)

JANUARY 9, 2014 - NVC received case

JANUARY 23, 2014 - Received AOS Fee Invoice

JANUARY 24, 2014 - Paid AOS Fee

JANUARY 28, 2014 - Received IV Fee Invoice

FEBRUARY 2, 2014 - Paid IV Fee

FEBRUARY 7, 2014 - Mailed IV Package

FEBRUARY 20, 2014 - Sent AoS Package

FEBRUARY 28, 2014 - Received Checklist for AoS

MARCH 4, 2014 - Sent response to AoS Checklist

MARCH 13, 2014 - CASE COMPLETE @ NVC

MARCH 21, 2014 - Case shipped out

MARCH 35, 2014 - Case Ready at US Embassy Manila ^_^

APRIL 3, 2014 - Interview at US Embassy Manila (APPROVED!)

APRIL 12, 2014 - Flew and arrived at my new home, Watertown, NY

APRIL 1, 2016 - Sent my i-751 Package

APRIL 4, 2016 - USCIS Vermont Center received my package



45fcba76-dcf8-4d13-9800-9ff9e76c8165_zps2ffbe589-1121-406b-8583-87942414e03e_zps66e10146-4e62-4733-aedc-f6d3709abdc1_zps

Posted

Im confused. What do you mean when you said K3 is dead? Is that option no longer available?

No, it's not available. It exists on paper but will be unobtainable. It doesn't matter anyway, because it would take as long as a CR1, if not longer.

AOS for my husband
8/17/10: INTERVIEW DAY (day 123) APPROVED!!

ROC:
5/23/12: Sent out package
2/06/13: APPROVED!

Posted

So it'll be better to just take the CR1 route then?

JUNE 2012 - Met and became friends

NOVEMBER 2012 - He went back to the US crying.gif

DECEMBER 27, 2012 - Became an official couple! blush.pngyes.gif

APRIL 16, 2013 - Got engaged!

JULY 8, 2013 - Reunited in Manila, Philippines

JULY 31, 2013 - Got Married! happy.pngtongue.pngbiggrin.png

NOVEMBER 26, 2013 - Sent out I-130 Application

NOVEMBER 29, 2013 - USCIS received our case

DECEMBER 4, 2013 - NOA1 (email)

DECEMBER 9, 2013 - NOA1 (hard copy)

DECEMBER 12, 2013 - NOA2 (email)

Shipped off to Department of State

DECEMBER 16, 2013 - NOA2 (hard copy)

JANUARY 9, 2014 - NVC received case

JANUARY 23, 2014 - Received AOS Fee Invoice

JANUARY 24, 2014 - Paid AOS Fee

JANUARY 28, 2014 - Received IV Fee Invoice

FEBRUARY 2, 2014 - Paid IV Fee

FEBRUARY 7, 2014 - Mailed IV Package

FEBRUARY 20, 2014 - Sent AoS Package

FEBRUARY 28, 2014 - Received Checklist for AoS

MARCH 4, 2014 - Sent response to AoS Checklist

MARCH 13, 2014 - CASE COMPLETE @ NVC

MARCH 21, 2014 - Case shipped out

MARCH 35, 2014 - Case Ready at US Embassy Manila ^_^

APRIL 3, 2014 - Interview at US Embassy Manila (APPROVED!)

APRIL 12, 2014 - Flew and arrived at my new home, Watertown, NY

APRIL 1, 2016 - Sent my i-751 Package

APRIL 4, 2016 - USCIS Vermont Center received my package



45fcba76-dcf8-4d13-9800-9ff9e76c8165_zps2ffbe589-1121-406b-8583-87942414e03e_zps66e10146-4e62-4733-aedc-f6d3709abdc1_zps

Filed: IR-1/CR-1 Visa Country: Italy
Timeline
Posted

K3 is pretty much no longer available. Either one would be a wait. It is hard but pretty much all of us had to be or are currently apart and waiting. There are no short cuts unfortunately. I would say be emotionally and mentally prepared to wait about a year. Our wait was 9 months total. We survived it via Skype, me visiting, and just thinking about the end result. Good luck!

Posted

CR-1 would be the best option for you.

There will be a wait, but it will be worth it in the end!

 

Spoiler

 

CR-1 visa by Direct Consular Filing in London:

July 01, 2013 Married in Wolfeboro, NH (before returning to U.K.)

July 10, 2013 I-130 sent

July 12, 2013 Notice of Receipt (NOA1)

July 22, 2013 NOA2 approved (10 days)

August 8, 2013 Packet 3 sent but never received.

August 15, 2013 Received case number after enquiry. Booked medical and sent packet 3 forms.

August 31, 2013 Medical

Sept 18, 2013 Packet 3 forms logged into the system

Sept 24, 2013 Packet 4 received (dated September 19)

October 4, 2013 Interview *approved*

October 9, 2013 Passport received

November 12, 2013 POE Los Angeles

November 22, 2013 Social Security Number received

December 20, 2013 Green Card received.

 

Removal of Conditions:

September 4, 2015 I-751 sent

September 8, 2015 NOA

October 8, 2015 Biometrics

April 22, 2016 Approved


 

 

N-400 Naturalization Application:

July 5, 2018 N-400 filed (online)

July 7, 2018 Biometrics appointment letter mailed

July 23, 2018 Biometrics Appointment

Filed: K-1 Visa Country: Philippines
Timeline
Posted

Im Filipina and my husband is American. We met June of last year here in the Philippines when I got back from the US from my one-year hotel internship in Philadelphia, PA. We got married last July 31, 2013 here in the Philippines. He went back to America last August 23 to continue his schooling, as he is still in college. Now, our dilemma is just like most of the newly married Fil-Am couples here: what to do next to be able to bring the Filipina wife to the US to live with her husband. Im only 23 yrs old and my husband is 22, and though we've researched about the K3 and CR1/IR1 visas, we still dont know which route is the best place for us to go. We also have a lot of questions, and our main concern is how long the process will take for us. We want to be together as soon as possible; its hard and painful to be away from your spouse, especially in the first year of marriage. Please help us!

hi sis are you a J1 visa holder before like me?just curious coz you said internship, and your trying to go back? well you guys should get CR1 visa.

01-04-2013: SENT I 129F PACKET

01-17-2013: NOA1 (VERMONT SERVICE CENTER)

05-28-2013: CASE TRANSFER FROM VSC TO TSC

07-02-2013: NOA2

07-26-2013: GOT MNL # THROUGH EMAIL (NVC)

08-08-2013: 1ST DAY OF MEDICAL AT SLEC (HOLIDAY THE NEXT DAY AND OVER THE WEEKEND)

08-12-2013: 2ND DAY FOR IMMUNIZATION (4 SHOTS)

08-19-2013: APPOINTMENT INTERVIEW / CANCELLED DUE TO SEVERE FLOOD

08-23-2013: RESCHEDULED INTERVIEW / PUT UNDER ADMINISTRATIVE REVIEW DUE TO MY J1 VISA BEFORE

CEAC STATUS CHECK AS OF 09-02-2013: STILL "READY" FOR THE INTERVIEW. NO CHANGE YET.

09-30-13: READY OPEN CASE

10-01-13: ADMINISTRATIVE PROCESSING

10-02-13: ISSUED

10-05-13: VISA ON HAND

10-16-13: POE HONOLULU HI

http://www.visajourney.com/forums/topic/450009-k1-interview-got-a-221g-need-help/g

11-12-13: GOT MARRIED!

12-17-13: SENT AOS PACKET (EXPRESS MAIL TO CHICAGO)

12-20-13: DELIVERED

12-23-13: NOA 1

1-28-13: SCHEDULED BIOMETRICS

Posted

K3 is pretty much no longer available. Either one would be a wait. It is hard but pretty much all of us had to be or are currently apart and waiting. There are no short cuts unfortunately. I would say be emotionally and mentally prepared to wait about a year. Our wait was 9 months total. We survived it via Skype, me visiting, and just thinking about the end result. Good luck!

Before we got married, we kept in touch through Skype too, for eight months. Just thinking about how long we'll have to wait is driving me nuts already, but it comforts me to know that there are a lot out there who are in the same situation, and are still surviving. Thank you for your kind words. :)

JUNE 2012 - Met and became friends

NOVEMBER 2012 - He went back to the US crying.gif

DECEMBER 27, 2012 - Became an official couple! blush.pngyes.gif

APRIL 16, 2013 - Got engaged!

JULY 8, 2013 - Reunited in Manila, Philippines

JULY 31, 2013 - Got Married! happy.pngtongue.pngbiggrin.png

NOVEMBER 26, 2013 - Sent out I-130 Application

NOVEMBER 29, 2013 - USCIS received our case

DECEMBER 4, 2013 - NOA1 (email)

DECEMBER 9, 2013 - NOA1 (hard copy)

DECEMBER 12, 2013 - NOA2 (email)

Shipped off to Department of State

DECEMBER 16, 2013 - NOA2 (hard copy)

JANUARY 9, 2014 - NVC received case

JANUARY 23, 2014 - Received AOS Fee Invoice

JANUARY 24, 2014 - Paid AOS Fee

JANUARY 28, 2014 - Received IV Fee Invoice

FEBRUARY 2, 2014 - Paid IV Fee

FEBRUARY 7, 2014 - Mailed IV Package

FEBRUARY 20, 2014 - Sent AoS Package

FEBRUARY 28, 2014 - Received Checklist for AoS

MARCH 4, 2014 - Sent response to AoS Checklist

MARCH 13, 2014 - CASE COMPLETE @ NVC

MARCH 21, 2014 - Case shipped out

MARCH 35, 2014 - Case Ready at US Embassy Manila ^_^

APRIL 3, 2014 - Interview at US Embassy Manila (APPROVED!)

APRIL 12, 2014 - Flew and arrived at my new home, Watertown, NY

APRIL 1, 2016 - Sent my i-751 Package

APRIL 4, 2016 - USCIS Vermont Center received my package



45fcba76-dcf8-4d13-9800-9ff9e76c8165_zps2ffbe589-1121-406b-8583-87942414e03e_zps66e10146-4e62-4733-aedc-f6d3709abdc1_zps

Posted

Yep, start gathering the CR1 stuff now and file ASAP.

So with regards to the forms that we both have to fill out, does that mean i have to send the original forms that i need to fill out to my husband in America? If that's the case, what's the fastest way to send documents to the US?

CR-1 would be the best option for you.

There will be a wait, but it will be worth it in the end!

Thanks! How long did you wait for yours?

JUNE 2012 - Met and became friends

NOVEMBER 2012 - He went back to the US crying.gif

DECEMBER 27, 2012 - Became an official couple! blush.pngyes.gif

APRIL 16, 2013 - Got engaged!

JULY 8, 2013 - Reunited in Manila, Philippines

JULY 31, 2013 - Got Married! happy.pngtongue.pngbiggrin.png

NOVEMBER 26, 2013 - Sent out I-130 Application

NOVEMBER 29, 2013 - USCIS received our case

DECEMBER 4, 2013 - NOA1 (email)

DECEMBER 9, 2013 - NOA1 (hard copy)

DECEMBER 12, 2013 - NOA2 (email)

Shipped off to Department of State

DECEMBER 16, 2013 - NOA2 (hard copy)

JANUARY 9, 2014 - NVC received case

JANUARY 23, 2014 - Received AOS Fee Invoice

JANUARY 24, 2014 - Paid AOS Fee

JANUARY 28, 2014 - Received IV Fee Invoice

FEBRUARY 2, 2014 - Paid IV Fee

FEBRUARY 7, 2014 - Mailed IV Package

FEBRUARY 20, 2014 - Sent AoS Package

FEBRUARY 28, 2014 - Received Checklist for AoS

MARCH 4, 2014 - Sent response to AoS Checklist

MARCH 13, 2014 - CASE COMPLETE @ NVC

MARCH 21, 2014 - Case shipped out

MARCH 35, 2014 - Case Ready at US Embassy Manila ^_^

APRIL 3, 2014 - Interview at US Embassy Manila (APPROVED!)

APRIL 12, 2014 - Flew and arrived at my new home, Watertown, NY

APRIL 1, 2016 - Sent my i-751 Package

APRIL 4, 2016 - USCIS Vermont Center received my package



45fcba76-dcf8-4d13-9800-9ff9e76c8165_zps2ffbe589-1121-406b-8583-87942414e03e_zps66e10146-4e62-4733-aedc-f6d3709abdc1_zps

Posted

hi sis are you a J1 visa holder before like me?just curious coz you said internship, and your trying to go back? well you guys should get CR1 visa.

Yes, I was a J1 visa holder before.. but me wanting to go back to the US now is purely coincidental, coz I never expected that I'll get married to an American after coming back to the Philippines. Was it the same with you? Did you come back here first, got married and went back to America? If so, is CR1 visa the one you applied for too?

JUNE 2012 - Met and became friends

NOVEMBER 2012 - He went back to the US crying.gif

DECEMBER 27, 2012 - Became an official couple! blush.pngyes.gif

APRIL 16, 2013 - Got engaged!

JULY 8, 2013 - Reunited in Manila, Philippines

JULY 31, 2013 - Got Married! happy.pngtongue.pngbiggrin.png

NOVEMBER 26, 2013 - Sent out I-130 Application

NOVEMBER 29, 2013 - USCIS received our case

DECEMBER 4, 2013 - NOA1 (email)

DECEMBER 9, 2013 - NOA1 (hard copy)

DECEMBER 12, 2013 - NOA2 (email)

Shipped off to Department of State

DECEMBER 16, 2013 - NOA2 (hard copy)

JANUARY 9, 2014 - NVC received case

JANUARY 23, 2014 - Received AOS Fee Invoice

JANUARY 24, 2014 - Paid AOS Fee

JANUARY 28, 2014 - Received IV Fee Invoice

FEBRUARY 2, 2014 - Paid IV Fee

FEBRUARY 7, 2014 - Mailed IV Package

FEBRUARY 20, 2014 - Sent AoS Package

FEBRUARY 28, 2014 - Received Checklist for AoS

MARCH 4, 2014 - Sent response to AoS Checklist

MARCH 13, 2014 - CASE COMPLETE @ NVC

MARCH 21, 2014 - Case shipped out

MARCH 35, 2014 - Case Ready at US Embassy Manila ^_^

APRIL 3, 2014 - Interview at US Embassy Manila (APPROVED!)

APRIL 12, 2014 - Flew and arrived at my new home, Watertown, NY

APRIL 1, 2016 - Sent my i-751 Package

APRIL 4, 2016 - USCIS Vermont Center received my package



45fcba76-dcf8-4d13-9800-9ff9e76c8165_zps2ffbe589-1121-406b-8583-87942414e03e_zps66e10146-4e62-4733-aedc-f6d3709abdc1_zps

Posted

Thanks! How long did you wait for yours?

I am currently doing DCF as we both live in the UK, which means that I am able to do everything through the US embassy in London. DCF (direct consular filling) is generally known to be faster process than the regular way.

We have his medical on Saturday, and we are waiting for an interview date to be assigned and hopefully, he will be approved then. I hope that everything will be finished by mid (ish)-October at the latest which would make it 3 months.

 

Spoiler

 

CR-1 visa by Direct Consular Filing in London:

July 01, 2013 Married in Wolfeboro, NH (before returning to U.K.)

July 10, 2013 I-130 sent

July 12, 2013 Notice of Receipt (NOA1)

July 22, 2013 NOA2 approved (10 days)

August 8, 2013 Packet 3 sent but never received.

August 15, 2013 Received case number after enquiry. Booked medical and sent packet 3 forms.

August 31, 2013 Medical

Sept 18, 2013 Packet 3 forms logged into the system

Sept 24, 2013 Packet 4 received (dated September 19)

October 4, 2013 Interview *approved*

October 9, 2013 Passport received

November 12, 2013 POE Los Angeles

November 22, 2013 Social Security Number received

December 20, 2013 Green Card received.

 

Removal of Conditions:

September 4, 2015 I-751 sent

September 8, 2015 NOA

October 8, 2015 Biometrics

April 22, 2016 Approved


 

 

N-400 Naturalization Application:

July 5, 2018 N-400 filed (online)

July 7, 2018 Biometrics appointment letter mailed

July 23, 2018 Biometrics Appointment

Filed: K-1 Visa Country: Philippines
Timeline
Posted

Yes, I was a J1 visa holder before.. but me wanting to go back to the US now is purely coincidental, coz I never expected that I'll get married to an American after coming back to the Philippines. Was it the same with you? Did you come back here first, got married and went back to America? If so, is CR1 visa the one you applied for too?

I am a j1 before also. But now I am getting a K1 visa. I came back immediately here in PH after my visa expires. im telling you this is a very different and crazy process compare to our J1. Goodluck to your journey. I will message you in inbox.

01-04-2013: SENT I 129F PACKET

01-17-2013: NOA1 (VERMONT SERVICE CENTER)

05-28-2013: CASE TRANSFER FROM VSC TO TSC

07-02-2013: NOA2

07-26-2013: GOT MNL # THROUGH EMAIL (NVC)

08-08-2013: 1ST DAY OF MEDICAL AT SLEC (HOLIDAY THE NEXT DAY AND OVER THE WEEKEND)

08-12-2013: 2ND DAY FOR IMMUNIZATION (4 SHOTS)

08-19-2013: APPOINTMENT INTERVIEW / CANCELLED DUE TO SEVERE FLOOD

08-23-2013: RESCHEDULED INTERVIEW / PUT UNDER ADMINISTRATIVE REVIEW DUE TO MY J1 VISA BEFORE

CEAC STATUS CHECK AS OF 09-02-2013: STILL "READY" FOR THE INTERVIEW. NO CHANGE YET.

09-30-13: READY OPEN CASE

10-01-13: ADMINISTRATIVE PROCESSING

10-02-13: ISSUED

10-05-13: VISA ON HAND

10-16-13: POE HONOLULU HI

http://www.visajourney.com/forums/topic/450009-k1-interview-got-a-221g-need-help/g

11-12-13: GOT MARRIED!

12-17-13: SENT AOS PACKET (EXPRESS MAIL TO CHICAGO)

12-20-13: DELIVERED

12-23-13: NOA 1

1-28-13: SCHEDULED BIOMETRICS

Posted

I am currently doing DCF as we both live in the UK, which means that I am able to do everything through the US embassy in London. DCF (direct consular filling) is generally known to be faster process than the regular way.

We have his medical on Saturday, and we are waiting for an interview date to be assigned and hopefully, he will be approved then. I hope that everything will be finished by mid (ish)-October at the latest which would make it 3 months.

Oh.. you guys are lucky to be able to take the DCF route. I know there's no chance of us doing the same, but I wish you luck with your process! =)

JUNE 2012 - Met and became friends

NOVEMBER 2012 - He went back to the US crying.gif

DECEMBER 27, 2012 - Became an official couple! blush.pngyes.gif

APRIL 16, 2013 - Got engaged!

JULY 8, 2013 - Reunited in Manila, Philippines

JULY 31, 2013 - Got Married! happy.pngtongue.pngbiggrin.png

NOVEMBER 26, 2013 - Sent out I-130 Application

NOVEMBER 29, 2013 - USCIS received our case

DECEMBER 4, 2013 - NOA1 (email)

DECEMBER 9, 2013 - NOA1 (hard copy)

DECEMBER 12, 2013 - NOA2 (email)

Shipped off to Department of State

DECEMBER 16, 2013 - NOA2 (hard copy)

JANUARY 9, 2014 - NVC received case

JANUARY 23, 2014 - Received AOS Fee Invoice

JANUARY 24, 2014 - Paid AOS Fee

JANUARY 28, 2014 - Received IV Fee Invoice

FEBRUARY 2, 2014 - Paid IV Fee

FEBRUARY 7, 2014 - Mailed IV Package

FEBRUARY 20, 2014 - Sent AoS Package

FEBRUARY 28, 2014 - Received Checklist for AoS

MARCH 4, 2014 - Sent response to AoS Checklist

MARCH 13, 2014 - CASE COMPLETE @ NVC

MARCH 21, 2014 - Case shipped out

MARCH 35, 2014 - Case Ready at US Embassy Manila ^_^

APRIL 3, 2014 - Interview at US Embassy Manila (APPROVED!)

APRIL 12, 2014 - Flew and arrived at my new home, Watertown, NY

APRIL 1, 2016 - Sent my i-751 Package

APRIL 4, 2016 - USCIS Vermont Center received my package



45fcba76-dcf8-4d13-9800-9ff9e76c8165_zps2ffbe589-1121-406b-8583-87942414e03e_zps66e10146-4e62-4733-aedc-f6d3709abdc1_zps

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...