Jump to content
Mad & J

February 2015 filers - Texas Service Center

 Share

819 posts in this topic

Recommended Posts

Hi guys! We just got a text notification, case status was updated. What can that mean? Any ideas?

Did you ever get your hard copy of NOA1?

Marriage/ AOS Timeline:

23 Dec 2015: Legal marriage

23 Jan 2016: Wedding!

23 Jan 2016: "Blizzard of the Century", wedding canceled/rescheduled (thank goodness we were legally married first or we'd have had a big problem!) :sleepy:

24 Jan 2016: Small "civil ceremony" with friends and family who were snowed in with us. December was a bit of a secret and people had traveled internationally and knew we *had* to get married that weekend, and our December legal marriage was nothing but signing a piece of paper at our priest's kitchen table, without any sort of vows etc so this was actually a very special (if not legally significant) day. (L)

16 Apr 2016: Filed for AOS and EAD/AP (We delayed a bit-- no big rush, enjoying the USCIS break)

23 Apr 2016: Wedding! Finally! :luv:

27 Apr 2016: Electronic NOA1 for all 3 :dancing:
29 Apr 2016: NOA1 Hardcopy for all 3
29 Jul 2016: Online service request for late EAD (Day 104)
29 Jul 2016: EAD/AP Approved ~3 hours after online service request
04 Aug 2016: RFE for Green Card (requested medicals/ vaccination record. They already have it). :ranting:
05 Aug 2016: EAD/AP Combo Card arrived! (Day 111)
08 Aug 2016: Congressional constituent request to get guidance on the RFE. Hoping they see they have the form and approve!

K-1 Visa Timeline:

PLEASE NOTE. This timeline was during the period of time when TSC was working on I-129fs and had a huge backlog. The average processing time was 210+ days. This is in no way predictive of your own timeline if you filed during or after April 2015, unless CSC develops a backlog. A backlog is anything above the 5-month goal time listed on USCIS's site

14 Feb 2015: Mailed I-129f to Dallas Lockbox. (L) (Most expensive Valentine's card I've ever sent!)

17 Feb 2015: NOA1 "Received Date"
19 Feb 2015: NOA1 Notice Date
08 Aug 2015: NOA2 email! :luv: (173 days from NOA1)

17 Aug 2015: Sent to NVC

?? Aug 2015: Arrived at NVC

25 Aug 2015: NVC Case # Assigned

31 Aug 2015: Left NVC for Consulate in San Jose

09 Sep 2015: Consulate received :dancing: (32 days from NOA2)

11 Sep 2015: Packet 3 emailed from embassy to me, the petitioner (34 days from NOA2).

18 Sep 2015: Medicals complete

21 Sep 2015: Packet 3 complete, my boss puts a temporary moratorium on all time off due to work emergency :clock:

02 Oct 2015: Work emergency clears up, interview scheduled (soonest available was 5 business days away--Columbus Day was in there)

13 Oct 2015: Interview

13 Oct 2015: VISA APPROVED :thumbs: (236 days from NOA1)

19 Oct 2015: Visa-in-hand

24 Oct 2015: POE !

15 Dec 2015: Fiance's mother's B-2 visa interview: APPROVED! So happy she will be at the wedding! :thumbs:

!

Link to comment
Share on other sites

Hmm, then, no idea. Might be a RFE or a very early NOA-2.

K1 time line

 


I-129F sent: 12/23/2014
NOA-1: 12/29/2014
NOA-2: 06/05/2015 (158 days)
NOA-2 hardcopy: 06/11/2015 (6 days post NOA-2, 164 days total)
Sent to NVC: 06/16/2015 (11 days post NOA-2, 169 days total)
NVC receive: 06/25/2015 (20 days post NOA-2, 178 days total)
NVC case no: 06/30/2015 (25 days post NOA-2, 183 days total)
NVC left: 07/02/2015 (27 days post NOA-2, 185 days total)
Case Ready: 07/07/2015 (32 days post NOA-2, 190 days total)
submitted DS-160, paid visa fee.: 07/21/2015 (46 days post NOA-2, 204 days total)
Packet 3 sent: 07/25/2015 (50 days post NOA-2, 209 days total)
Pack 4 received: 07/30/2015 (55 days post NOA-2, 214 days total)
Medical: 09/17/2015 Interview: 09/23/2015 (108 days post NOA-2, 268 days total)
Interview Result: Approved Administrative Processing: 09/23/2015
CEAC Status Issued: 09/24/2015
Visa in hand: 09/28/2015
POE: 12/29/2015 Wedding: 01/11/2016


AOS Time Line

 

AOS package mailed: 01/13/2016
AOS package received: 01/20/2016 (day 1)
AOS NOA-1 text/email: 01/23/2016 (day 3), actual NOA-1 date 01/22/2016 (day 2)
AOS Fingerprint fee received: 01/22/2016 (day 2)
AOS check cashed: 01-25-2016 (day 5) Got 6 month NJ driver's license: 01-25-2016
3x NOA-1 hardcopies: 02/03/2016 (day 14)

Biometrics letter: 02/05/2016 (day 16) Biometrics appt (Elizabeth, NJ): 02/17/2016 (day 28)

EAD and AP approved email/txt: 03/29/2016 (day 67)

GC approval email/text: 04/04/2016 (day 74)

I-797 for I-765/I-131 in mail: 04/04/2016 (day 74)

EAD/AP delivered: 04/05/216 (day 75)

GC card being mailed status update: 04/07/16 (day 77)

GC received: 04/11/16 (day 84 post AOS NOA-1)

DONE WITH USCIS FOR 21 MONTHS!

ROC Window opens: 01/04/2018

 

ROC Time Line
ROC package mailed to Vermont 01/04/2018
ROC package received at Vermont 01/08/2018 (day 0)
Check cashed: 01/16/2018 (day 8 )
NOA-1 date: 01/09/2018 (day 1)
NOA-1 received: 01/16/2018 (day 8 )
Biometrics notice received: 02/09/2018 (day 32)
Biometrics appointment: 02/23/2018 (day 46)
Received 18-month extension letter: 08/13/2018 (day 209)
ROC Approved: 03/09/2019 (day 425)
Card Received: 03/16/2019  (day 432)
Link to comment
Share on other sites

Yes, Catherine.we got it at March..

Huh, crazy. Maybe it is an un-deliverable RFE. Which is good because it means someone has your file (!!) but bad because if you don't get this sorted out, you could have some problems down the road. Did you apply for an expedite?

Marriage/ AOS Timeline:

23 Dec 2015: Legal marriage

23 Jan 2016: Wedding!

23 Jan 2016: "Blizzard of the Century", wedding canceled/rescheduled (thank goodness we were legally married first or we'd have had a big problem!) :sleepy:

24 Jan 2016: Small "civil ceremony" with friends and family who were snowed in with us. December was a bit of a secret and people had traveled internationally and knew we *had* to get married that weekend, and our December legal marriage was nothing but signing a piece of paper at our priest's kitchen table, without any sort of vows etc so this was actually a very special (if not legally significant) day. (L)

16 Apr 2016: Filed for AOS and EAD/AP (We delayed a bit-- no big rush, enjoying the USCIS break)

23 Apr 2016: Wedding! Finally! :luv:

27 Apr 2016: Electronic NOA1 for all 3 :dancing:
29 Apr 2016: NOA1 Hardcopy for all 3
29 Jul 2016: Online service request for late EAD (Day 104)
29 Jul 2016: EAD/AP Approved ~3 hours after online service request
04 Aug 2016: RFE for Green Card (requested medicals/ vaccination record. They already have it). :ranting:
05 Aug 2016: EAD/AP Combo Card arrived! (Day 111)
08 Aug 2016: Congressional constituent request to get guidance on the RFE. Hoping they see they have the form and approve!

K-1 Visa Timeline:

PLEASE NOTE. This timeline was during the period of time when TSC was working on I-129fs and had a huge backlog. The average processing time was 210+ days. This is in no way predictive of your own timeline if you filed during or after April 2015, unless CSC develops a backlog. A backlog is anything above the 5-month goal time listed on USCIS's site

14 Feb 2015: Mailed I-129f to Dallas Lockbox. (L) (Most expensive Valentine's card I've ever sent!)

17 Feb 2015: NOA1 "Received Date"
19 Feb 2015: NOA1 Notice Date
08 Aug 2015: NOA2 email! :luv: (173 days from NOA1)

17 Aug 2015: Sent to NVC

?? Aug 2015: Arrived at NVC

25 Aug 2015: NVC Case # Assigned

31 Aug 2015: Left NVC for Consulate in San Jose

09 Sep 2015: Consulate received :dancing: (32 days from NOA2)

11 Sep 2015: Packet 3 emailed from embassy to me, the petitioner (34 days from NOA2).

18 Sep 2015: Medicals complete

21 Sep 2015: Packet 3 complete, my boss puts a temporary moratorium on all time off due to work emergency :clock:

02 Oct 2015: Work emergency clears up, interview scheduled (soonest available was 5 business days away--Columbus Day was in there)

13 Oct 2015: Interview

13 Oct 2015: VISA APPROVED :thumbs: (236 days from NOA1)

19 Oct 2015: Visa-in-hand

24 Oct 2015: POE !

15 Dec 2015: Fiance's mother's B-2 visa interview: APPROVED! So happy she will be at the wedding! :thumbs:

!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Russia
Timeline

Yes,we did apply to expedite, but never had an opportunity to send the evidence...we got an email explaining that our situation is not expedite case

6 February 2014 sent Petition

12 February NOA1 TSC

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Russia
Timeline

Or maybe...its just Uscis mistake. m fiancee just called them and Lady said, that have no information about it, but she can send a request and we will receive an answer till June 19

Catherine, what is that- an un-deliverable RFE?

And i wonder, can it b an Rfe....so early. But the truth is that we are really waiting for Rfe. Bcz made some mistakes in Petition.

Edited by hosfam

6 February 2014 sent Petition

12 February NOA1 TSC

Link to comment
Share on other sites

Hang on let me get out my crystal ball and look into your future. Ah there we go.

0.jpg

:P

Filed I-129f petition---------------- 01.07.2015

Hardcopy NOA1 rec.----------------01.23.2015

K1 Visa Received---------------------10.09.2015

Married--------------------------------- 12.12.2015

Filed AOS/EAD-------------------------02.02.2016

AOS/EAD NOA1 rec.------------------02.08.2016

EAD Approved--------------------------04.11.2016

:reading:You can read more about my immigration journey on my blog as well as get tips and information about the process.

Link to comment
Share on other sites

What's up February people.

This thread is too quiet.

So, uh when do you think it'll be our time? October? November?

I'm thinking by the end of October but hopefully much sooner, if all the claims of hiring new people are true.

Marriage/ AOS Timeline:

23 Dec 2015: Legal marriage

23 Jan 2016: Wedding!

23 Jan 2016: "Blizzard of the Century", wedding canceled/rescheduled (thank goodness we were legally married first or we'd have had a big problem!) :sleepy:

24 Jan 2016: Small "civil ceremony" with friends and family who were snowed in with us. December was a bit of a secret and people had traveled internationally and knew we *had* to get married that weekend, and our December legal marriage was nothing but signing a piece of paper at our priest's kitchen table, without any sort of vows etc so this was actually a very special (if not legally significant) day. (L)

16 Apr 2016: Filed for AOS and EAD/AP (We delayed a bit-- no big rush, enjoying the USCIS break)

23 Apr 2016: Wedding! Finally! :luv:

27 Apr 2016: Electronic NOA1 for all 3 :dancing:
29 Apr 2016: NOA1 Hardcopy for all 3
29 Jul 2016: Online service request for late EAD (Day 104)
29 Jul 2016: EAD/AP Approved ~3 hours after online service request
04 Aug 2016: RFE for Green Card (requested medicals/ vaccination record. They already have it). :ranting:
05 Aug 2016: EAD/AP Combo Card arrived! (Day 111)
08 Aug 2016: Congressional constituent request to get guidance on the RFE. Hoping they see they have the form and approve!

K-1 Visa Timeline:

PLEASE NOTE. This timeline was during the period of time when TSC was working on I-129fs and had a huge backlog. The average processing time was 210+ days. This is in no way predictive of your own timeline if you filed during or after April 2015, unless CSC develops a backlog. A backlog is anything above the 5-month goal time listed on USCIS's site

14 Feb 2015: Mailed I-129f to Dallas Lockbox. (L) (Most expensive Valentine's card I've ever sent!)

17 Feb 2015: NOA1 "Received Date"
19 Feb 2015: NOA1 Notice Date
08 Aug 2015: NOA2 email! :luv: (173 days from NOA1)

17 Aug 2015: Sent to NVC

?? Aug 2015: Arrived at NVC

25 Aug 2015: NVC Case # Assigned

31 Aug 2015: Left NVC for Consulate in San Jose

09 Sep 2015: Consulate received :dancing: (32 days from NOA2)

11 Sep 2015: Packet 3 emailed from embassy to me, the petitioner (34 days from NOA2).

18 Sep 2015: Medicals complete

21 Sep 2015: Packet 3 complete, my boss puts a temporary moratorium on all time off due to work emergency :clock:

02 Oct 2015: Work emergency clears up, interview scheduled (soonest available was 5 business days away--Columbus Day was in there)

13 Oct 2015: Interview

13 Oct 2015: VISA APPROVED :thumbs: (236 days from NOA1)

19 Oct 2015: Visa-in-hand

24 Oct 2015: POE !

15 Dec 2015: Fiance's mother's B-2 visa interview: APPROVED! So happy she will be at the wedding! :thumbs:

!

Link to comment
Share on other sites

i am so hopeful that we will hear something by july and august

lets be more optimistic

Optimism is good and everything, but when faced with the actual numbers and the actual current processing rate, thinking that July or August is possible is just being in denial about the reality of the situation.

That said, IF this agency, known for its chronic lying, obfuscation of the truth, and general ill-treatment of its clients, IF USCIS is being honest about having hired hundreds of new people, AND if some of those hundreds of people are assigned to i-129fs instead of other petitions, then yes, maybe maybe July/August is possible.

My opinion on the matter is that yes, they did hire hundreds of people, but it was too little too late and the training time needed for them is actually slowing things down. Plus, it is unlikley that they will assign anyone to i-129fs, as DACA is the administration's stated priority, and the spousal visas and the green cards are more backed up than we are. If anything speeds up enough for July/August to be possible, you'll need to start seeing a serious upswing in October/November approvals starting next week. I mean like 3 times the normal speed, and seriously starting next week.

Marriage/ AOS Timeline:

23 Dec 2015: Legal marriage

23 Jan 2016: Wedding!

23 Jan 2016: "Blizzard of the Century", wedding canceled/rescheduled (thank goodness we were legally married first or we'd have had a big problem!) :sleepy:

24 Jan 2016: Small "civil ceremony" with friends and family who were snowed in with us. December was a bit of a secret and people had traveled internationally and knew we *had* to get married that weekend, and our December legal marriage was nothing but signing a piece of paper at our priest's kitchen table, without any sort of vows etc so this was actually a very special (if not legally significant) day. (L)

16 Apr 2016: Filed for AOS and EAD/AP (We delayed a bit-- no big rush, enjoying the USCIS break)

23 Apr 2016: Wedding! Finally! :luv:

27 Apr 2016: Electronic NOA1 for all 3 :dancing:
29 Apr 2016: NOA1 Hardcopy for all 3
29 Jul 2016: Online service request for late EAD (Day 104)
29 Jul 2016: EAD/AP Approved ~3 hours after online service request
04 Aug 2016: RFE for Green Card (requested medicals/ vaccination record. They already have it). :ranting:
05 Aug 2016: EAD/AP Combo Card arrived! (Day 111)
08 Aug 2016: Congressional constituent request to get guidance on the RFE. Hoping they see they have the form and approve!

K-1 Visa Timeline:

PLEASE NOTE. This timeline was during the period of time when TSC was working on I-129fs and had a huge backlog. The average processing time was 210+ days. This is in no way predictive of your own timeline if you filed during or after April 2015, unless CSC develops a backlog. A backlog is anything above the 5-month goal time listed on USCIS's site

14 Feb 2015: Mailed I-129f to Dallas Lockbox. (L) (Most expensive Valentine's card I've ever sent!)

17 Feb 2015: NOA1 "Received Date"
19 Feb 2015: NOA1 Notice Date
08 Aug 2015: NOA2 email! :luv: (173 days from NOA1)

17 Aug 2015: Sent to NVC

?? Aug 2015: Arrived at NVC

25 Aug 2015: NVC Case # Assigned

31 Aug 2015: Left NVC for Consulate in San Jose

09 Sep 2015: Consulate received :dancing: (32 days from NOA2)

11 Sep 2015: Packet 3 emailed from embassy to me, the petitioner (34 days from NOA2).

18 Sep 2015: Medicals complete

21 Sep 2015: Packet 3 complete, my boss puts a temporary moratorium on all time off due to work emergency :clock:

02 Oct 2015: Work emergency clears up, interview scheduled (soonest available was 5 business days away--Columbus Day was in there)

13 Oct 2015: Interview

13 Oct 2015: VISA APPROVED :thumbs: (236 days from NOA1)

19 Oct 2015: Visa-in-hand

24 Oct 2015: POE !

15 Dec 2015: Fiance's mother's B-2 visa interview: APPROVED! So happy she will be at the wedding! :thumbs:

!

Link to comment
Share on other sites

Optimism is good and everything, but when faced with the actual numbers and the actual current processing rate, thinking that July or August is possible is just being in denial about the reality of the situation.

That said, IF this agency, known for its chronic lying, obfuscation of the truth, and general ill-treatment of its clients, IF USCIS is being honest about having hired hundreds of new people, AND if some of those hundreds of people are assigned to i-129fs instead of other petitions, then yes, maybe maybe July/August is possible.

My opinion on the matter is that yes, they did hire hundreds of people, but it was too little too late and the training time needed for them is actually slowing things down. Plus, it is unlikley that they will assign anyone to i-129fs, as DACA is the administration's stated priority, and the spousal visas and the green cards are more backed up than we are. If anything speeds up enough for July/August to be possible, you'll need to start seeing a serious upswing in October/November approvals starting next week. I mean like 3 times the normal speed, and seriously starting next week.

Wise words.

There will no doubt be lucky ones who get approvals in July/August - but not the bulk if current performance is any trend. I personally try to stay realistic, cause the disappointment in the past has been so depressing...

K1 time line

 


I-129F sent: 12/23/2014
NOA-1: 12/29/2014
NOA-2: 06/05/2015 (158 days)
NOA-2 hardcopy: 06/11/2015 (6 days post NOA-2, 164 days total)
Sent to NVC: 06/16/2015 (11 days post NOA-2, 169 days total)
NVC receive: 06/25/2015 (20 days post NOA-2, 178 days total)
NVC case no: 06/30/2015 (25 days post NOA-2, 183 days total)
NVC left: 07/02/2015 (27 days post NOA-2, 185 days total)
Case Ready: 07/07/2015 (32 days post NOA-2, 190 days total)
submitted DS-160, paid visa fee.: 07/21/2015 (46 days post NOA-2, 204 days total)
Packet 3 sent: 07/25/2015 (50 days post NOA-2, 209 days total)
Pack 4 received: 07/30/2015 (55 days post NOA-2, 214 days total)
Medical: 09/17/2015 Interview: 09/23/2015 (108 days post NOA-2, 268 days total)
Interview Result: Approved Administrative Processing: 09/23/2015
CEAC Status Issued: 09/24/2015
Visa in hand: 09/28/2015
POE: 12/29/2015 Wedding: 01/11/2016


AOS Time Line

 

AOS package mailed: 01/13/2016
AOS package received: 01/20/2016 (day 1)
AOS NOA-1 text/email: 01/23/2016 (day 3), actual NOA-1 date 01/22/2016 (day 2)
AOS Fingerprint fee received: 01/22/2016 (day 2)
AOS check cashed: 01-25-2016 (day 5) Got 6 month NJ driver's license: 01-25-2016
3x NOA-1 hardcopies: 02/03/2016 (day 14)

Biometrics letter: 02/05/2016 (day 16) Biometrics appt (Elizabeth, NJ): 02/17/2016 (day 28)

EAD and AP approved email/txt: 03/29/2016 (day 67)

GC approval email/text: 04/04/2016 (day 74)

I-797 for I-765/I-131 in mail: 04/04/2016 (day 74)

EAD/AP delivered: 04/05/216 (day 75)

GC card being mailed status update: 04/07/16 (day 77)

GC received: 04/11/16 (day 84 post AOS NOA-1)

DONE WITH USCIS FOR 21 MONTHS!

ROC Window opens: 01/04/2018

 

ROC Time Line
ROC package mailed to Vermont 01/04/2018
ROC package received at Vermont 01/08/2018 (day 0)
Check cashed: 01/16/2018 (day 8 )
NOA-1 date: 01/09/2018 (day 1)
NOA-1 received: 01/16/2018 (day 8 )
Biometrics notice received: 02/09/2018 (day 32)
Biometrics appointment: 02/23/2018 (day 46)
Received 18-month extension letter: 08/13/2018 (day 209)
ROC Approved: 03/09/2019 (day 425)
Card Received: 03/16/2019  (day 432)
Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: Egypt
Timeline

i feel that they are trying start from month dec proving that they processing within 5 months and max 6, no one knows how they work, and yes i am talking about there will be lucky ones will get the approvals in july and august, by august i will complete 6 months in this process and i see so many people got the approval in that time from so it is not possible, for example some approvals happened to jan this month, i feel like they are trying, and maybe they have a plan specially they dont have any k1 petitions after march because they are all routed to csc, so i hope and pray they will speed the process

Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: India
Timeline

Optimism is good and everything, but when faced with the actual numbers and the actual current processing rate, thinking that July or August is possible is just being in denial about the reality of the situation.

That said, IF this agency, known for its chronic lying, obfuscation of the truth, and general ill-treatment of its clients, IF USCIS is being honest about having hired hundreds of new people, AND if some of those hundreds of people are assigned to i-129fs instead of other petitions, then yes, maybe maybe July/August is possible.

My opinion on the matter is that yes, they did hire hundreds of people, but it was too little too late and the training time needed for them is actually slowing things down. Plus, it is unlikley that they will assign anyone to i-129fs, as DACA is the administration's stated priority, and the spousal visas and the green cards are more backed up than we are. If anything speeds up enough for July/August to be possible, you'll need to start seeing a serious upswing in October/November approvals starting next week. I mean like 3 times the normal speed, and seriously starting next week.

True and a very reasonable explanation. To be conservative, follow the month that is 80% or 90% complete and calculate from that month. Yes, the light bulb goes on when you see a late Dec or or Jan NOA1 getting approved but I would refrain from speculating on that information alone.

On lighter side, I am beginning to visualize all the lines as TSC or CSC, esp when there are multiple counters - at Tolls, airlines, cafe etc.

01/31/2015 : 129F sent

02/04/2015 : NOA1

07/24/2015: RFE1

08/01/2015: Received paper mail RFE1

08/03/2015: Mailed response overnite

08/04/2015: Tracking showed TSC received

08/05/2015: TSC acknowledged that my RFE was received

08/14/2015: NOA2 approved

Link to comment
Share on other sites

I posted this elsewhere today, I think there is hope in that the applications in the back half of 2014 are smaller than the first half of204 by a lot overall. Low numbers can't hurt in speeding things up. Here is what I looked at

I have spent the weekend looking over the data inside VJ using the tables. It seems to me that in the 2nd quarter of 2014 TSC got killed with more applications they could handle. In looking at our VJ data a number of applications in April and May 2014 were shown here to have moved from TSC to CSC and were expedited. If we can believe that VJ data is a representative sample of what is happening at USCIS for K-1 visa's I think I can see why they are not transferring any cases. The reason is that the number of actual cases (which they know measured in NOA1i applications) in the back half of 2014 actually is going down. Here is my table to show it.

no new prediction buddy? you used to come up with new numbers every once in while...

Edited by xpedramx
Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...