So, I brought my wife here on a K-1 visa on 21NOV2012. We were married on 05DEC2012 and have already had our initial interview. From what I have read we need to wait for the 90 day period to start the AOS, but I have also read that if you have been married less than 2 years you need to file for a removal of status of some type within that same 90 day period.

Her visa is set to expire some time in June, and I do not know what we should be doing right now. Do i need to submit the AOS? Do I also submit the Removal of Conditional Status form? Should I take her to the local embassy to get the visa renewed? Any and all help would be greatly appreciated.

Respectfully,

Sean

06JUN12 - Forms Received by the office

07JUN12 - NOA1 Received

08JUN12 - Peek

27JUN12 - Called office to check on acceptance I-797

05AUG12 - Called about information on expedited process

06AUG12 - Submitted form for expedited process

06AUG12 - Got a notification that they needed evidence

06AUG12 - Sent evidence to the fax number provided

07AUG12 - Got a notice that evidence has not been submitted yet

07AUG12 - Called office and was told to resubmit, did so to the same fax number

08AUG12 - Still no status on approval or denial of expedite process.

09AUG12 - Called office and they said wait 15 days before calling to find out about missing RFE in mail.

27AUG12 - NAO2 Received

30AUG12 - NVC Received Package

04SEP12 - NVC Gave us MNL and Case Number

10OCT12 - Singapore Clearance sent to Embassy

19OCT12 - Interview Date ( approved )

21OCT12 - Missing Singapore clearance

20NOV12 - Visa Complete and printed at 2GO

20NOV12 - Tickets purchased

21NOV12 - Arrival in San Diego, CA

04DEC12 - Marriage!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Wales
Timeline

I would start by reading the guides, there are many wrong assumptions it would be pointless addressing them individually.

“If you know the enemy and know yourself, you need not fear the result of a hundred battles. If you know yourself but not the enemy, for every victory gained you will also suffer a defeat. If you know neither the enemy nor yourself, you will succumb in every battle.”

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

I have the read the guides, which is more or less why I am posting. I am confused.

Also, an edit to the top. I have already completed the AOS, I guess I am on the part of Removal of Conditions.

06JUN12 - Forms Received by the office

07JUN12 - NOA1 Received

08JUN12 - Peek

27JUN12 - Called office to check on acceptance I-797

05AUG12 - Called about information on expedited process

06AUG12 - Submitted form for expedited process

06AUG12 - Got a notification that they needed evidence

06AUG12 - Sent evidence to the fax number provided

07AUG12 - Got a notice that evidence has not been submitted yet

07AUG12 - Called office and was told to resubmit, did so to the same fax number

08AUG12 - Still no status on approval or denial of expedite process.

09AUG12 - Called office and they said wait 15 days before calling to find out about missing RFE in mail.

27AUG12 - NAO2 Received

30AUG12 - NVC Received Package

04SEP12 - NVC Gave us MNL and Case Number

10OCT12 - Singapore Clearance sent to Embassy

19OCT12 - Interview Date ( approved )

21OCT12 - Missing Singapore clearance

20NOV12 - Visa Complete and printed at 2GO

20NOV12 - Tickets purchased

21NOV12 - Arrival in San Diego, CA

04DEC12 - Marriage!!!!

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

Moved from Adjustment of Status from Family Based Visas forum to Removing Conditions on Residency Discussion.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

Well, i guess the moving of the topic tells me where I am at now! :) I need to start working on the I-751 form within the 90 day window! I think...

06JUN12 - Forms Received by the office

07JUN12 - NOA1 Received

08JUN12 - Peek

27JUN12 - Called office to check on acceptance I-797

05AUG12 - Called about information on expedited process

06AUG12 - Submitted form for expedited process

06AUG12 - Got a notification that they needed evidence

06AUG12 - Sent evidence to the fax number provided

07AUG12 - Got a notice that evidence has not been submitted yet

07AUG12 - Called office and was told to resubmit, did so to the same fax number

08AUG12 - Still no status on approval or denial of expedite process.

09AUG12 - Called office and they said wait 15 days before calling to find out about missing RFE in mail.

27AUG12 - NAO2 Received

30AUG12 - NVC Received Package

04SEP12 - NVC Gave us MNL and Case Number

10OCT12 - Singapore Clearance sent to Embassy

19OCT12 - Interview Date ( approved )

21OCT12 - Missing Singapore clearance

20NOV12 - Visa Complete and printed at 2GO

20NOV12 - Tickets purchased

21NOV12 - Arrival in San Diego, CA

04DEC12 - Marriage!!!!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline

Well, i guess the moving of the topic tells me where I am at now! :) I need to start working on the I-751 form within the 90 day window! I think...

Yes. Now read the guides again based on removal of conditions and go from there! Good luck!

USCIS - 40 DAYS
2012-10-30: FedEx delivered I-130 to Chicago Lockbox Mail Room
2012-11-01: NOA1 by email - MSC
2012-11-02: $420 (x3) debited from our account
2012-11-05: NOA1 hard copies received, Priority Date 2012-10-30
2012-12-11: NOA2


NVC - 26 DAYS
2013-01-02: Rec'd case#, IIN, BIN & OPTIN emails for EP sent
2013-01-03: Submitted DS-261 (x3)
2013-01-07: AOS bills invoiced and paid & OPTIN for EP accepted for each of us
2013-01-08: AOS bills appear as paid & AOS packages sent by email
2013-01-08: IV bill invoiced & paid (kids' only)
2013-01-09: IV bill appears as paid (kids' only)
2013-01-09: IV Package emailed & DS-260 submitted online (kids only)
2013-01-11: AOS received -notified by email
2013-01-11: IV bill invoiced & paid (for me)
2013-01-14: IV bill appears as paid (for me)
2013-01-14: IV Supporting Docs received for kids - notified by email
2013-01-14: IV Package emailed & DS-260 submitted online (me only)
2013-01-18: IV Supporting Docs received for me - notified by email
2013-01-18: Son#1 CASE COMPLETE - Son#2 checklist - saying $ on I-864 don't match tax return (but they do)-resubmitted
2013-01-23: AOS 2nd submission for Son #2 received - notified by email
2013-01-25: My CASE COMPLETE
2013-01-28: ALL 3 OF OUR CASES ARE NOW COMPLETE
2013-02-06: Packet 4 Received by email

MEDICAL ~ CONSULATE ~ POE REMOVAL OF CONDITIONS - 160 DAYS NATURALIZATION
2013-02-13: Medicals 2014-12-17: Delivered to California Lockbox 2015-12-15: Delivered to Phoenix Lockbox
2013-03-06: Interview 2014-12-19: 1 I-751 + 3 Biometrics Fees debited from our account 2015-12-16: Fees charged to Credit Card
2013-03-08: Visas in-hand 2014-12-22: Received NOA1 by mail. Receipt Date: 2014-12-17 2015-12-17: NOA
2013-03-12: Paid USCIS Immigrant Fee 2014-12-24: Received Biometrics Appointment Letter 2016-01-02: Biometrics Letter 2016-01-11: Biometrics
2013-03-14: POE 2015-01-06: Biometrics 2016-02-15: In Line for Interview 2016-02-19: Letter
2013-03-25: SSNs arrived 2015-05-27: Approved 2016-03-22: Interview
2013-04-01: Green Cards arrived 2015-06-03: New Green Cards arrived 2016-04-15: Oath Ceremony

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

I got it. I was just confused on timeframe. I was unaware that we had already done the AOS (for some reason I thought AOS was filed with the ROC). The confusion was that I had already done the AOS and so when I was reading the guide on that stuff it sounded like paperwork I had already done.

So, in fact, I have already completed the AOS and just need to file the ROC. I am still a bit confused on what to do with the visa/passport.

06JUN12 - Forms Received by the office

07JUN12 - NOA1 Received

08JUN12 - Peek

27JUN12 - Called office to check on acceptance I-797

05AUG12 - Called about information on expedited process

06AUG12 - Submitted form for expedited process

06AUG12 - Got a notification that they needed evidence

06AUG12 - Sent evidence to the fax number provided

07AUG12 - Got a notice that evidence has not been submitted yet

07AUG12 - Called office and was told to resubmit, did so to the same fax number

08AUG12 - Still no status on approval or denial of expedite process.

09AUG12 - Called office and they said wait 15 days before calling to find out about missing RFE in mail.

27AUG12 - NAO2 Received

30AUG12 - NVC Received Package

04SEP12 - NVC Gave us MNL and Case Number

10OCT12 - Singapore Clearance sent to Embassy

19OCT12 - Interview Date ( approved )

21OCT12 - Missing Singapore clearance

20NOV12 - Visa Complete and printed at 2GO

20NOV12 - Tickets purchased

21NOV12 - Arrival in San Diego, CA

04DEC12 - Marriage!!!!

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

I am still a bit confused on what to do with the visa/passport.

A K1 visa is a single entry visa, once it's used, it's no longer relevant.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

So the greencard is the only think that keeps her legal?

06JUN12 - Forms Received by the office

07JUN12 - NOA1 Received

08JUN12 - Peek

27JUN12 - Called office to check on acceptance I-797

05AUG12 - Called about information on expedited process

06AUG12 - Submitted form for expedited process

06AUG12 - Got a notification that they needed evidence

06AUG12 - Sent evidence to the fax number provided

07AUG12 - Got a notice that evidence has not been submitted yet

07AUG12 - Called office and was told to resubmit, did so to the same fax number

08AUG12 - Still no status on approval or denial of expedite process.

09AUG12 - Called office and they said wait 15 days before calling to find out about missing RFE in mail.

27AUG12 - NAO2 Received

30AUG12 - NVC Received Package

04SEP12 - NVC Gave us MNL and Case Number

10OCT12 - Singapore Clearance sent to Embassy

19OCT12 - Interview Date ( approved )

21OCT12 - Missing Singapore clearance

20NOV12 - Visa Complete and printed at 2GO

20NOV12 - Tickets purchased

21NOV12 - Arrival in San Diego, CA

04DEC12 - Marriage!!!!

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

Her visa is set to expire some time in June, and I do not know what we should be doing right now. Do i need to submit the AOS? Do I also submit the Removal of Conditional Status form? Should I take her to the local embassy to get the visa renewed? Any and all help would be greatly appreciated.

What visa? As I just stated, once the K1 is used, it becomes irrelevant. Furthermore, it's probably her Green Card that is expiring in June, not any kind of visa.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

A K1 visa is a single entry visa, once it's used, it's no longer relevant.

Yes. Also, once the I-751 is filed, status is automatically extended past the Green Card's expiration date.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

Her passport has a visa with an expiration date on it. (The K-1 most likely) The passport itself is perfectly fine but I just want to make sure I am covering all bases.

06JUN12 - Forms Received by the office

07JUN12 - NOA1 Received

08JUN12 - Peek

27JUN12 - Called office to check on acceptance I-797

05AUG12 - Called about information on expedited process

06AUG12 - Submitted form for expedited process

06AUG12 - Got a notification that they needed evidence

06AUG12 - Sent evidence to the fax number provided

07AUG12 - Got a notice that evidence has not been submitted yet

07AUG12 - Called office and was told to resubmit, did so to the same fax number

08AUG12 - Still no status on approval or denial of expedite process.

09AUG12 - Called office and they said wait 15 days before calling to find out about missing RFE in mail.

27AUG12 - NAO2 Received

30AUG12 - NVC Received Package

04SEP12 - NVC Gave us MNL and Case Number

10OCT12 - Singapore Clearance sent to Embassy

19OCT12 - Interview Date ( approved )

21OCT12 - Missing Singapore clearance

20NOV12 - Visa Complete and printed at 2GO

20NOV12 - Tickets purchased

21NOV12 - Arrival in San Diego, CA

04DEC12 - Marriage!!!!

Link to comment
Share on other sites

Her passport has a visa with an expiration date on it. (The K-1 most likely) The passport itself is perfectly fine but I just want to make sure I am covering all bases.

You seem to be over thinking this and making it all very complicated.

Your wife came over on a k1 visa which expired the moment she entered the states as it is a one time entry visa.

She then applied to adjust her status and recieved her two year green card.

She now need to file for removal of conditions to get her ten year green card.

Just follow the guides for roc. No complications needed.

My Name is Daisy, I am British, I say things bluntly and to the point.
London K1, A complete guide -- >http://www.visajourney.com/forums/topic/474161-london-k1-a-complete-guide/
I am Daisy the Beneficiary, These are my views!
U.K. k1 visa, approved 2014.

NOA1: 20/03/2014

NOA2: 11/04/2014 (22 days)

Interview: 09/07/2014 (111 days)

D.O.E 29/07/2014

Married 29/08/2014

AOS from K1/K3 Guide -->http://www.visajourney.com/content/k1k3aos

AOS/EAD/AP Sent: 12/11/2014

Delivered at Chicago LB:15/11/2014

NOA1 (all 3): 17/11/2014

NOA1 (all 3) hardcopy: 24/11/2014(Notice date 20th)

Bio-metrics App letter: 28/11/2014(Notice date 21st)

Bio-metrics App Cleveland Ohio: 10/12/2014

EAD/AP:Approved/production 31/01/2015(update 2/2/1015) (80 days)

Combo Card: Mailed 5/2/2015

Combo Card: Delivered 6/2/2015AP

NOA: Approval Notice received 7/2/2015

Interview waiver letter: received 23/2/15 dated: 18/2/2015

Green Card: APPROVED 31/07/2015

(Remember, all my dates are British layout.. the proper layout!)

Link to comment
Share on other sites

You are definitely over thinking this brother. My wife got here in Oct 2012 and I filed the AOS in January 2013. We got her Green card in April of that year, and it expires in April of this year. I filed her ROC (I-751) just a few weeks ago, we have already recieved the documentation showing that it is extended for one year or until we get her new green card.

The K1 visa was valid only for her first entry into the USA. The Green card is the only thing that makes her legal here in this country. So work on the I-751 and submit it before her Green card is expired.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...