Jump to content

13 posts in this topic

Recommended Posts

Filed: Country: Philippines
Timeline

hubby called just now saying that he received the NOA1 thru mail...jul 6 is the NOA date...im just wondering what to do next? and how many days do we have to wait for the NOA2 to be received? i mean the usual waiting time.....what are the things we need to prepare as early as now after receiving the NOA1?

My Journey to Happiness

NVC PROCESS

Mar 4, 2011 - hubby got NVC notice

April 3, 2011 - paid AOS online, emailed choice of agent

April 6, 2011 - AOS status PAID - NVC acknowledged choice of agent thru email

April 18 2011- paid IV bill online

May 18, 2011 - Send AOS Package

May 26, 2011 - Send DS230

June 1, 2011 - received email from NVC stating that our AOS lacks something is this RFE?

July 9, 2011 - mailed required docs for RFE

July 21, 2011 - called NVC and AVR said RFE again bt we havent rcvd any mail from them

Jul.21,2011- SIGN IN FAILED

Jul 24,2011-called NVC and AVR stated CASE COMPLETED on Jul 20

Aug.24-25, 2011 - Medical at st.Lukes...PASSED!!!!!!!!!!

SEPT 12, 2011 - INTERVIEW SCHED at US EM MANILA......PASSED

SEPT. 16,2011 - VISA ON HAND

..all my bags are packed im ready to go..yaaaayyyy!!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

hubby called just now saying that he received the NOA1 thru mail...jul 6 is the NOA date...im just wondering what to do next? and how many days do we have to wait for the NOA2 to be received? i mean the usual waiting time.....what are the things we need to prepare as early as now after receiving the NOA1?

Be prepared to wait for NOA2 from 3months upto 5 months. If you are lucky you may get it in even less than 3 months.

Goodluck.

CR-1 -- California Service Center -- Mumbai Consulate, India

16th March 2010: I130 sent
25th March 2010: NOA1 Received
23rd July 2010: I130 Approved
Your I-130 was approved in 120 days from your NOA1 date.

30th July 2010: NVC Received
14th Sept 2010: Case complete at NVC
22nd Oct 2010: Interview date assigned
19th Nov 2010: Interview at 7:30 A.M IST APPROVED

Passport with visa in hand on the same day.

N400 Sent: 31st Oct 2013

NOA1: Nov 4th 2013

Letter for Biometrics recievied with Appt on 12/09/2013: Nov 18th 2013

Biometrics done: Nov 22nd 2013

In line for Interview: Dec 27th 2013

Interview letter received: May 24th 2014

Interview Date: June 26th 2014

Oath Date: November 23rd (After numerous calls and Info pass inquiries to USCIS)

US Passport received: December 12th 2014

Filed for Parents - IR5

NOA1: April 2nd 2015

NOA2: August 19th 2015

Link to comment
Share on other sites

hubby called just now saying that he received the NOA1 thru mail...jul 6 is the NOA date...im just wondering what to do next? and how many days do we have to wait for the NOA2 to be received? i mean the usual waiting time.....what are the things we need to prepare as early as now after receiving the NOA1?

Congrats for starting your journey! May it be smooth! :thumbs:

the processing estimates on your timeline says you might get approved around Oct 27 - Nov. 2. That's an average, but it's good enough to keep it in mind. I'd say anywhere between late October to mid-December. Good luck!

Our Love Story's 1st page: June 15, 2008

K 1: 98 days!
May 11 - August 17, 2010 APPROVED!!!
POE: September 14, 2010 Chicago, IL
Wedding Day: September 22, 2010

AOS from K1: 96 days!
November 19, 2010 - February 24, 2011 APPROVED!!!
November 19, 2010: AOS, EAD & AP applications mailed
December 20, 2010: Biometrics (day 31)
January 18, 2011: case transfered to CSC (day 60)
February 10, 2011: EAD & AP approved! (day 83)
February 24, 2011: GC production ordered! (day 96)

Removing conditions: 5 months and 30 days!
December 6, 2012: package mailed
December 10, 2012: NOA 1 (day 4)

June, 5, 2013: APPROVED!!!

June, 10 2013: 10 yr GC received


event.png

an1cHsW0g410610MjAwMTU1bHwyNTY0MzkxbGF8d

Link to comment
Share on other sites

Start working on the documents you will need next. Have everything ready to go as soon as you get your NOA-2

April 24, 2010: Married in Butuan City
May 23, 2010: Submitted I-130
May 28, 2010: NOA-1 Received
October 19, 2010: NOA-2 Received
October 26, 2010: Case Number Assigned
October 28, 2010: IIN Received
November 3, 2010: AOS paid
November 5, 2010: AOS status "PAID". Sent AOS packet
November 6, 2010: DS-3032 email received. Emailed DS-3032
November 8, 2010: IV paid, DS-3032 accepted
November 10, 2010: IV status "PAID". Sent IV packet
November 15, 2010: IV received at NVC
November 22, 2010: False Checklist for missing DS-230
November 29, 2010: AOS + IV entered into system
December 4, 2010: SIF, Case Completed
December 6, 2010: Interview Scheduled
December 27-28, 2010: Passed Physical
January 6, 2011: Interview @ 0830 Approved
January 14, 2011: Visa received
January 31, 2011: CFO seminar completed
February 11, 2011: POE- LAX

Removal of Conditions
January 8, 2013: Mailed I-751
January 10,2013: NOA1
February 6, 2013: Biometrics Appoint.

June 4, 2013: Received I-797 NOA removal of conditions
_____________________________________________________________________________
Ordinarily he was insane, but he had lucid moments when he was merely stupid.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

Documents you will need for NOA2 are:

I-864 (for Petitioner/and any sponsor(s) - Affadavit of Support)

DS-3032 (Choice of Agent)

DS-230 (for beneficiary - Application for Visa)

View this: http://www.visajourney.com/examples/NVC_Process_Flowchart_v1-2.pdf

Read this & click the links: http://travel.state.gov/visa/immigrants/nvc/nvc_1335.html

Congrats and best wishes on your journey!

Toni

 

07/17/2008.......WEDDING DAY!!!!
USCIS STAGE (for me):
06/09/2010.......SENT I-130 TO USCIS
06/15/2010.......NOA1 & RECEIPT DATE (CSC)
11/03/2010.......NOA2 Email received-APPROVED!!-141 days

NVC STAGE (for him):
11/08/2010.......NVC Case # Assigned
11/19/2010.......DS-3032 received via email
07/02/2011.......IV (DS-230) Package mailed//NVC Received-7/5/2011
07/14/2011........CASE COMPLETE!!!
07/15/2011........SIF!!!

EMBASSY STAGE (for us):
8/23/2011.........Medical-Part 1
8/24/2011.........Medical-Part 2(Completed!)
9/12/2011.........INTERVIEW @ 10:00AM - APPROVED!! (IR-1 Visa)

POE: DECEMBER 3rd, Washington, D.C. (IAD)!!!

1/10/2012........Green Card in Hand!
02/07/2012........Rec'd. Social Security Card

Naturalization Journey:

09-27-2016................Mailed N-400

11-03-2016................Biometrics

Notified 2/13/2017........2-8-2017.....Case Is In Line For An Interview

3/23/2017 @ 9AM......Interview

4/13/2017...................OATH CEREMONY!!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline

Good luck on your journey!

Approval times can vary but 3-5 months is a reasonable estimate. Use the time to familiarize yourself with NVC processing which is the next step after your petition is approved. Begin to gather up the required documents as well as evidence of your relationship. Good luck!

NVC Shortcuts

Edited by OBX

USCIS

NOA1 08/19/08

NOA2 01/20/09

NVC

Received 01/26/09

Completed 02/13/09 (19 Days)

Interview Assigned 03/27/09 (6 weeks after NVC completion)

Medical

04/14/09 (Toronto)

Interview

Montreal 05/12/09 (88 days after NVC completion) **APPROVED**

POE

06/16/09 Buffalo

07/02/09 Welcome Letter Received

07/07/09 Applied for SSN

07/10/09 "Card production ordered" email received

07/13/09 SSN received

07/14/09 "Approval notice sent" email received

07/17/09 GREEN CARD received

Removal of Conditions

03/21/11 I-751 mailed to VSC

03/23/11 I-751 received at VSC

03/29/11 Cheque Cashed

03/30/11 NOA1 received (3/24/11)

04/11/11 Biometrics appointment notice received

05/05/11 Biometric appointment

12/13/11 **Approval date** (5 days short of 9 months!)

12/19/11 Approval letter and green card received

Naturalization

05/16/2019 Filed online (estimated completion February 2020)

05/18/2019 Biometrics scheduled

05/21/2019 Receipt notice and biometrics notices posted to online account.05/23/2019 Hard copy of NOA1 received

05/24/2019 Hard copy of biometrics appointment received

06/07/2019 Biometrics appointment (estimated completion January 2020)

12/31/2019 Email received "Interview scheduled"

01/01/2020 Interview date notice posted to online account (02/19/2020)

01/05/2019 Hard copy of interview appointment received

02/19/2020 Interview (**Approved**) and same day Oath Ceremony. 

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

Congrats for starting your journey! May it be smooth! :thumbs:

the processing estimates on your timeline says you might get approved around Oct 27 - Nov. 2. That's an average, but it's good enough to keep it in mind. I'd say anywhere between late October to mid-December. Good luck!

on my timeline it says oct 27-nov 2 estimated approval...is that mean by this dates we will receive the NOA2 or the whole process is all done ?, imean the medical,the interview ,the noa2...everything...

im a lil confuse sorry...

Edited by the journey

My Journey to Happiness

NVC PROCESS

Mar 4, 2011 - hubby got NVC notice

April 3, 2011 - paid AOS online, emailed choice of agent

April 6, 2011 - AOS status PAID - NVC acknowledged choice of agent thru email

April 18 2011- paid IV bill online

May 18, 2011 - Send AOS Package

May 26, 2011 - Send DS230

June 1, 2011 - received email from NVC stating that our AOS lacks something is this RFE?

July 9, 2011 - mailed required docs for RFE

July 21, 2011 - called NVC and AVR said RFE again bt we havent rcvd any mail from them

Jul.21,2011- SIGN IN FAILED

Jul 24,2011-called NVC and AVR stated CASE COMPLETED on Jul 20

Aug.24-25, 2011 - Medical at st.Lukes...PASSED!!!!!!!!!!

SEPT 12, 2011 - INTERVIEW SCHED at US EM MANILA......PASSED

SEPT. 16,2011 - VISA ON HAND

..all my bags are packed im ready to go..yaaaayyyy!!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Documents you will need for NOA2 are:

You mean after NOA2, yes?

Sometimes my language usage seems confusing - please feel free to 'read it twice', just in case !
Ya know, you can find the answer to your question with the advanced search tool, when using a PC? Ditch the handphone, come back later on a PC, and try again.

-=-=-=-=-=R E A D ! ! !=-=-=-=-=-

Whoa Nelly ! Want NVC Info? see http://www.visajourney.com/wiki/index.php/NVC_Process

Congratulations on your approval ! We All Applaud your accomplishment with Most Wonderful Kissies !

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

what are the things we need to prepare as early as now after receiving the NOA1?

There are two patterns, always useful -

1. read the guides here, plan ahead, map out plan or

2. be spoonfed by other members, negating the guides that are available.

Which will you be, in the long term ?

The next document that you will sign is the DS-3032, then you'll sign the DS-230, and it has original documents requirement - please have a read?

DS-230 - http://travel.state.gov/visa/immigrants/info/info_3190.html

Knowledge is Power !! Reading can make you POWERFUL !!! have you read the Guides Section here, yet ?

Hope all is well !

Sometimes my language usage seems confusing - please feel free to 'read it twice', just in case !
Ya know, you can find the answer to your question with the advanced search tool, when using a PC? Ditch the handphone, come back later on a PC, and try again.

-=-=-=-=-=R E A D ! ! !=-=-=-=-=-

Whoa Nelly ! Want NVC Info? see http://www.visajourney.com/wiki/index.php/NVC_Process

Congratulations on your approval ! We All Applaud your accomplishment with Most Wonderful Kissies !

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

You mean after NOA2, yes?

Sorry, yes AFTER NOA2

Toni

 

07/17/2008.......WEDDING DAY!!!!
USCIS STAGE (for me):
06/09/2010.......SENT I-130 TO USCIS
06/15/2010.......NOA1 & RECEIPT DATE (CSC)
11/03/2010.......NOA2 Email received-APPROVED!!-141 days

NVC STAGE (for him):
11/08/2010.......NVC Case # Assigned
11/19/2010.......DS-3032 received via email
07/02/2011.......IV (DS-230) Package mailed//NVC Received-7/5/2011
07/14/2011........CASE COMPLETE!!!
07/15/2011........SIF!!!

EMBASSY STAGE (for us):
8/23/2011.........Medical-Part 1
8/24/2011.........Medical-Part 2(Completed!)
9/12/2011.........INTERVIEW @ 10:00AM - APPROVED!! (IR-1 Visa)

POE: DECEMBER 3rd, Washington, D.C. (IAD)!!!

1/10/2012........Green Card in Hand!
02/07/2012........Rec'd. Social Security Card

Naturalization Journey:

09-27-2016................Mailed N-400

11-03-2016................Biometrics

Notified 2/13/2017........2-8-2017.....Case Is In Line For An Interview

3/23/2017 @ 9AM......Interview

4/13/2017...................OATH CEREMONY!!

Link to comment
Share on other sites

congratulations me and my wife received our NOA1 on June 5th. Looks like our journey will be on the same path. hope everything goes smooth for you. If you are doing this by yourself I suggest reading the guides in this group and the USCIS web site.

good luck

Michael

Met online June 27, 2008

May 15 2010 -- The Wedding in Castlemain, Victoria Australia

June 22, 2010 -- Mailed to Chicago lock box

July 5th recieved NOA1

Nov 1 2010 Case transfered to Texas Service Center

Nov 24 2010 Case Transfered to USCIS Office ???

Feb 7th Changed address on USCIS web site

Feb 17th Wifes case approved

Feb 18Th Step-Son's case RFE

Feb 27th Both Cases put back into "Initial Review"

Mar 28Th Case approved at USCIS

Apr 14Th AOS Fee Paid

Apr 19Th IV Fee paid

Apr 19Th AOS packets Sent

Apr 21St IV Packets Sent

May 19Th RFE for Wife IV Recieved

May 19Th RFE for Stepson IV Recieved

May 22nd RFE reply for wife and stepson sent to NVC (Overnight)

June 3rd NVC message changed to show that RFE being processed

June 6th NVC payment portal SIF

June 9th NVC message changed to case closed

June 11th Interview scheduled in Sydney for July 26th

June 15th NVC mailed package to Sydney

June 20Th Package delivered to consulate

June 23rd emailed consulate for earlier interview

June 26th reply from consulate Intervirw moved to July 12th

event.png

event.png

Link to comment
Share on other sites

on my timeline it says oct 27-nov 2 estimated approval...is that mean by this dates we will receive the NOA2 or the whole process is all done ?, imean the medical,the interview ,the noa2...everything...

im a lil confuse sorry...

that's an estimation for when you might get the NOA 2; after NOA2, your file goes to NVC for a week (sometimes less or more), then to the Consulate...It usually takes another 30-50 days until the entire process is done. So, NOA2 around Nov-Dec, visa in hand Jan-Febr... Best of luck and, as our fellow VJ members posted, make sure you read the guides! It's all in there...

Our Love Story's 1st page: June 15, 2008

K 1: 98 days!
May 11 - August 17, 2010 APPROVED!!!
POE: September 14, 2010 Chicago, IL
Wedding Day: September 22, 2010

AOS from K1: 96 days!
November 19, 2010 - February 24, 2011 APPROVED!!!
November 19, 2010: AOS, EAD & AP applications mailed
December 20, 2010: Biometrics (day 31)
January 18, 2011: case transfered to CSC (day 60)
February 10, 2011: EAD & AP approved! (day 83)
February 24, 2011: GC production ordered! (day 96)

Removing conditions: 5 months and 30 days!
December 6, 2012: package mailed
December 10, 2012: NOA 1 (day 4)

June, 5, 2013: APPROVED!!!

June, 10 2013: 10 yr GC received


event.png

an1cHsW0g410610MjAwMTU1bHwyNTY0MzkxbGF8d

Link to comment
Share on other sites

Filed: Country: Philippines
Timeline

that's an estimation for when you might get the NOA 2; after NOA2, your file goes to NVC for a week (sometimes less or more), then to the Consulate...It usually takes another 30-50 days until the entire process is done. So, NOA2 around Nov-Dec, visa in hand Jan-Febr... Best of luck and, as our fellow VJ members posted, make sure you read the guides! It's all in there...

ahh..now i know..thanks...

My Journey to Happiness

NVC PROCESS

Mar 4, 2011 - hubby got NVC notice

April 3, 2011 - paid AOS online, emailed choice of agent

April 6, 2011 - AOS status PAID - NVC acknowledged choice of agent thru email

April 18 2011- paid IV bill online

May 18, 2011 - Send AOS Package

May 26, 2011 - Send DS230

June 1, 2011 - received email from NVC stating that our AOS lacks something is this RFE?

July 9, 2011 - mailed required docs for RFE

July 21, 2011 - called NVC and AVR said RFE again bt we havent rcvd any mail from them

Jul.21,2011- SIGN IN FAILED

Jul 24,2011-called NVC and AVR stated CASE COMPLETED on Jul 20

Aug.24-25, 2011 - Medical at st.Lukes...PASSED!!!!!!!!!!

SEPT 12, 2011 - INTERVIEW SCHED at US EM MANILA......PASSED

SEPT. 16,2011 - VISA ON HAND

..all my bags are packed im ready to go..yaaaayyyy!!!!!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...