Hello VJ!

We received our RFE on August the 29th.

I'm uploading the picture.

My fiance and i filled the forms G-325 but they request on the RFE the form G-325A from my fiance. (i guess that is a new form)
My question here is. I didn't filled the form G-325A either which is weird why they ask only the one of my fiance and not mine. Should i also send my G-325A form?

The other letter i already sent it with the initial package. Probably they lost it. Should i make something special in the letter?

THANK YOU IN ADVANCE!s5h2.jpg

January 13, 2012 - Start talking
June 20, 2012 - Visit 1
September 21, 2012 - Visit 2
December 31, 2012 - Visit 3
February 20, 2013 - Visit 4 (proposal the 24th)
April 15, 2013 - Package sent
April 18, 2013 - NOA1
May 30, 2013 - Visit 5
August 22, 2013 - Visit 6
August 29, 2013 - RFE
October 4, 2013 - NOA2 (after 5 months 2 weeks 2 days)
October 9, 2013 - NOA2 Hard Copy
November 8, 2013 - NVC case number (after 5 weeks)
November 15, 2013 - Embassy in Lima received the case
November 29, 2013 - Visit 7
January 3, 2014 - Visit 8
January 6, 2014 - INTERVIEW APPROVEDJanuary 11, 2014 - Visa in hand
May 1, 2014 - Visit 9
May 4, 2014 - POE
June 24, 2014 - MARRIED :star:
July 29, 2014 - Sent AOS
August 6, 2014 - NOA1
September 4, 2014 - Biometrics

October 17, 2014 - Travel&Work permit Approved

December 3, 2014 - AOS INTERVIEW - APPROVED

December 11, 2014 - Green Card in hand

September 7, 2016 - ROC sent

September 12, 2016 - NOA1
October 18, 2016 - Biometrics

October 17, 2019 - I-797C received

November 15, 2019 - Biometrics 

October 6, 2020 - Interview

November 18, 2020 - Naturalization ceremony
Ju44m5.png

8Hm5m5.png

lpi8m5.png

Posted

Are you the beneficiary? You say you are sending things but you say you sent a letter that they lost (which is indicated as the beneficiary's). If you are the beneficiary, you are not sending anything...

Why did you fill out G-325?? "A" was always the correct one.

I would have both the petitioner and the beneficiary fill one out.

Redo the intent to marry letter and make sure it is original with original signature.

AOS for my husband
8/17/10: INTERVIEW DAY (day 123) APPROVED!!

ROC:
5/23/12: Sent out package
2/06/13: APPROVED!

Filed: K-1 Visa Country: Jamaica
Timeline
Posted

That would a great idea to send a G-325A for both of you. I forget to fill out the G-325A and I received a RFE asking me for a G-325A form for my fiance and I send one for myself and one for him. I was approved 12days later.. Oh and be sure to send passport pics for you and your fiance with the G-325A form if u didn't the 1st time!!

Filed: K-1 Visa Country: Peru
Timeline
Posted

Are you the beneficiary? You say you are sending things but you say you sent a letter that they lost (which is indicated as the beneficiary's). If you are the beneficiary, you are not sending anything...

Why did you fill out G-325?? "A" was always the correct one.

I would have both the petitioner and the beneficiary fill one out.

Redo the intent to marry letter and make sure it is original with original signature.

Sorry i didn't specified. I'm the beneficiary.

I sent my letter of intend to marry within the 90 days but they are requesting it again.

And they are asking also for my fiance's G325-A form (we didn't get wrong, it was the lawyers. And i already learn that lawyers are not needed if this page exist)

Oki, thanks for the advice!!! We both will send our G-325A form just in case.

Do you think they will be annoyed cause we are sending something that they didn't ask?

Thank you!!!

January 13, 2012 - Start talking
June 20, 2012 - Visit 1
September 21, 2012 - Visit 2
December 31, 2012 - Visit 3
February 20, 2013 - Visit 4 (proposal the 24th)
April 15, 2013 - Package sent
April 18, 2013 - NOA1
May 30, 2013 - Visit 5
August 22, 2013 - Visit 6
August 29, 2013 - RFE
October 4, 2013 - NOA2 (after 5 months 2 weeks 2 days)
October 9, 2013 - NOA2 Hard Copy
November 8, 2013 - NVC case number (after 5 weeks)
November 15, 2013 - Embassy in Lima received the case
November 29, 2013 - Visit 7
January 3, 2014 - Visit 8
January 6, 2014 - INTERVIEW APPROVEDJanuary 11, 2014 - Visa in hand
May 1, 2014 - Visit 9
May 4, 2014 - POE
June 24, 2014 - MARRIED :star:
July 29, 2014 - Sent AOS
August 6, 2014 - NOA1
September 4, 2014 - Biometrics

October 17, 2014 - Travel&Work permit Approved

December 3, 2014 - AOS INTERVIEW - APPROVED

December 11, 2014 - Green Card in hand

September 7, 2016 - ROC sent

September 12, 2016 - NOA1
October 18, 2016 - Biometrics

October 17, 2019 - I-797C received

November 15, 2019 - Biometrics 

October 6, 2020 - Interview

November 18, 2020 - Naturalization ceremony
Ju44m5.png

8Hm5m5.png

lpi8m5.png

Filed: K-1 Visa Country: Peru
Timeline
Posted

That would a great idea to send a G-325A for both of you. I forget to fill out the G-325A and I received a RFE asking me for a G-325A form for my fiance and I send one for myself and one for him. I was approved 12days later.. Oh and be sure to send passport pics for you and your fiance with the G-325A form if u didn't the 1st time!!

We sent the pictures the first time. :)

THANK YOU SO MUCH!!!

I am wondering if they could denied us for something they didn't ask on the RFE.

For example, if my fiance sent only what they requested "My letter to intend to marry and her G-325A form" and he didn't send mINE (which is not requested) will they denied?

I'm sorry for asquing this... i want to make sure :(

January 13, 2012 - Start talking
June 20, 2012 - Visit 1
September 21, 2012 - Visit 2
December 31, 2012 - Visit 3
February 20, 2013 - Visit 4 (proposal the 24th)
April 15, 2013 - Package sent
April 18, 2013 - NOA1
May 30, 2013 - Visit 5
August 22, 2013 - Visit 6
August 29, 2013 - RFE
October 4, 2013 - NOA2 (after 5 months 2 weeks 2 days)
October 9, 2013 - NOA2 Hard Copy
November 8, 2013 - NVC case number (after 5 weeks)
November 15, 2013 - Embassy in Lima received the case
November 29, 2013 - Visit 7
January 3, 2014 - Visit 8
January 6, 2014 - INTERVIEW APPROVEDJanuary 11, 2014 - Visa in hand
May 1, 2014 - Visit 9
May 4, 2014 - POE
June 24, 2014 - MARRIED :star:
July 29, 2014 - Sent AOS
August 6, 2014 - NOA1
September 4, 2014 - Biometrics

October 17, 2014 - Travel&Work permit Approved

December 3, 2014 - AOS INTERVIEW - APPROVED

December 11, 2014 - Green Card in hand

September 7, 2016 - ROC sent

September 12, 2016 - NOA1
October 18, 2016 - Biometrics

October 17, 2019 - I-797C received

November 15, 2019 - Biometrics 

October 6, 2020 - Interview

November 18, 2020 - Naturalization ceremony
Ju44m5.png

8Hm5m5.png

lpi8m5.png

Filed: K-1 Visa Country: Jamaica
Timeline
Posted

I can only answer that base on my experience! With that been said I was only asked for a G-325A for myself but I sent in one for me and one for my fiance and I was approved. Don't see why they would deny you. By the way Texas Service Center was the USCIS office that processed my paper work. Hope that helps

Posted

I think it is a good idea to send both G-325A. They will not deny you for adding something they didn't ask for.

AOS for my husband
8/17/10: INTERVIEW DAY (day 123) APPROVED!!

ROC:
5/23/12: Sent out package
2/06/13: APPROVED!

Filed: K-1 Visa Country: Peru
Timeline
Posted

I can only answer that base on my experience! With that been said I was only asked for a G-325A for myself but I sent in one for me and one for my fiance and I was approved. Don't see why they would deny you. By the way Texas Service Center was the USCIS office that processed my paper work. Hope that helps

I think it is a good idea to send both G-325A. They will not deny you for adding something they didn't ask for.

THANK YOU SO MUCH !!!star_smile.gifstar_smile.gifstar_smile.gif

January 13, 2012 - Start talking
June 20, 2012 - Visit 1
September 21, 2012 - Visit 2
December 31, 2012 - Visit 3
February 20, 2013 - Visit 4 (proposal the 24th)
April 15, 2013 - Package sent
April 18, 2013 - NOA1
May 30, 2013 - Visit 5
August 22, 2013 - Visit 6
August 29, 2013 - RFE
October 4, 2013 - NOA2 (after 5 months 2 weeks 2 days)
October 9, 2013 - NOA2 Hard Copy
November 8, 2013 - NVC case number (after 5 weeks)
November 15, 2013 - Embassy in Lima received the case
November 29, 2013 - Visit 7
January 3, 2014 - Visit 8
January 6, 2014 - INTERVIEW APPROVEDJanuary 11, 2014 - Visa in hand
May 1, 2014 - Visit 9
May 4, 2014 - POE
June 24, 2014 - MARRIED :star:
July 29, 2014 - Sent AOS
August 6, 2014 - NOA1
September 4, 2014 - Biometrics

October 17, 2014 - Travel&Work permit Approved

December 3, 2014 - AOS INTERVIEW - APPROVED

December 11, 2014 - Green Card in hand

September 7, 2016 - ROC sent

September 12, 2016 - NOA1
October 18, 2016 - Biometrics

October 17, 2019 - I-797C received

November 15, 2019 - Biometrics 

October 6, 2020 - Interview

November 18, 2020 - Naturalization ceremony
Ju44m5.png

8Hm5m5.png

lpi8m5.png

Posted

Hi there,

Follow what the RFE says EXACTLY.

Since you are the beneficiary from what I gather, it clearly says on the RFE that the petitioner, your fiance, needs to submit the G-325A. You are not required to at this point.

The RFE also clearly states the intent to marry letter has to come from you

Hello VJ!

We received our RFE on August the 29th.

I'm uploading the picture.

My fiance and i filled the forms G-325 but they request on the RFE the form G-325A from my fiance. (i guess that is a new form)
My question here is. I didn't filled the form G-325A either which is weird why they ask only the one of my fiance and not mine. Should i also send my G-325A form?

The other letter i already sent it with the initial package. Probably they lost it. Should i make something special in the letter?

THANK YOU IN ADVANCE!s5h2.jpg

Filed: K-1 Visa Country: Guatemala
Timeline
Posted

Wow thanks God I just saw this post. I checked my copy of the forms I sent on my I-129F and realized my preparer also filed G-325 instead of the G-325A. Should I send that before getting the same RFE?

Our story on the Herald Tribune Newspapper: http://www.heraldtribune.com/article/20101002/ARTICLE/10021035

2/27/2007 - Wendy and I met in Sarasota, FL
6/30/2007 - We moved in
6/11/2010 - Our son Christopher was born
7/??/2010 - Wendy was cited to report in person at Tampa's Immigration Enforcement Office
1/20/2011 - Wendy left to Guatemala. our son stayed with me.

3/25/2013 - I became a U.S. Citizen
5/07/2013 - I-129F sent.
5/10/2013 - NOA1 received
8/22/2013 to 8/29/2013 - Visit for one week. Christopher stayed with mom.
10/24/2013 - RFE
11/25/2013 - NOA2 Approved!

01/31/2014 - INTERVIEW: Officer said everything was good, but gave us a 221g to submit a co-sponsor with form I-864

2/12/2014 - Was told to file Waivers

5/21/2014 - Waivers I-601 and I-212 filed

12/19/2014 - Waivers Approved

01/26/2015 - K1 VISA ON HAND!!!!!!



event.png

Filed: K-1 Visa Country: Peru
Timeline
Posted

Hi there,

Follow what the RFE says EXACTLY.

Since you are the beneficiary from what I gather, it clearly says on the RFE that the petitioner, your fiance, needs to submit the G-325A. You are not required to at this point.

The RFE also clearly states the intent to marry letter has to come from you

thank you :)

January 13, 2012 - Start talking
June 20, 2012 - Visit 1
September 21, 2012 - Visit 2
December 31, 2012 - Visit 3
February 20, 2013 - Visit 4 (proposal the 24th)
April 15, 2013 - Package sent
April 18, 2013 - NOA1
May 30, 2013 - Visit 5
August 22, 2013 - Visit 6
August 29, 2013 - RFE
October 4, 2013 - NOA2 (after 5 months 2 weeks 2 days)
October 9, 2013 - NOA2 Hard Copy
November 8, 2013 - NVC case number (after 5 weeks)
November 15, 2013 - Embassy in Lima received the case
November 29, 2013 - Visit 7
January 3, 2014 - Visit 8
January 6, 2014 - INTERVIEW APPROVEDJanuary 11, 2014 - Visa in hand
May 1, 2014 - Visit 9
May 4, 2014 - POE
June 24, 2014 - MARRIED :star:
July 29, 2014 - Sent AOS
August 6, 2014 - NOA1
September 4, 2014 - Biometrics

October 17, 2014 - Travel&Work permit Approved

December 3, 2014 - AOS INTERVIEW - APPROVED

December 11, 2014 - Green Card in hand

September 7, 2016 - ROC sent

September 12, 2016 - NOA1
October 18, 2016 - Biometrics

October 17, 2019 - I-797C received

November 15, 2019 - Biometrics 

October 6, 2020 - Interview

November 18, 2020 - Naturalization ceremony
Ju44m5.png

8Hm5m5.png

lpi8m5.png

Filed: K-1 Visa Country: Peru
Timeline
Posted (edited)

Wow thanks God I just saw this post. I checked my copy of the forms I sent on my I-129F and realized my preparer also filed G-325 instead of the G-325A. Should I send that before getting the same RFE?

HEY! well, now i've seen that the form should be G-325A

http://www.uscis.gov/files/form/g-325a.pdf

I don't know if you can send this before an RFE ... better wait .... probably you won't get one.

Good luck!!!star_smile.gifstar_smile.gifstar_smile.gif

Edited by davenella

January 13, 2012 - Start talking
June 20, 2012 - Visit 1
September 21, 2012 - Visit 2
December 31, 2012 - Visit 3
February 20, 2013 - Visit 4 (proposal the 24th)
April 15, 2013 - Package sent
April 18, 2013 - NOA1
May 30, 2013 - Visit 5
August 22, 2013 - Visit 6
August 29, 2013 - RFE
October 4, 2013 - NOA2 (after 5 months 2 weeks 2 days)
October 9, 2013 - NOA2 Hard Copy
November 8, 2013 - NVC case number (after 5 weeks)
November 15, 2013 - Embassy in Lima received the case
November 29, 2013 - Visit 7
January 3, 2014 - Visit 8
January 6, 2014 - INTERVIEW APPROVEDJanuary 11, 2014 - Visa in hand
May 1, 2014 - Visit 9
May 4, 2014 - POE
June 24, 2014 - MARRIED :star:
July 29, 2014 - Sent AOS
August 6, 2014 - NOA1
September 4, 2014 - Biometrics

October 17, 2014 - Travel&Work permit Approved

December 3, 2014 - AOS INTERVIEW - APPROVED

December 11, 2014 - Green Card in hand

September 7, 2016 - ROC sent

September 12, 2016 - NOA1
October 18, 2016 - Biometrics

October 17, 2019 - I-797C received

November 15, 2019 - Biometrics 

October 6, 2020 - Interview

November 18, 2020 - Naturalization ceremony
Ju44m5.png

8Hm5m5.png

lpi8m5.png

Filed: K-1 Visa Country: Guatemala
Timeline
Posted

I only wished I found this forum before I had a preparer fill everything for me. I realized I didn't include the intent to marry letters either. He told me that USCIS will ask me for everything I need, but never mention that I could avoid that RFE by sending all the basics. Now I'm preparing what I think they will ask me for in the RFE. I'm sure that's what I get instead of NOA2 aproval.

Our story on the Herald Tribune Newspapper: http://www.heraldtribune.com/article/20101002/ARTICLE/10021035

2/27/2007 - Wendy and I met in Sarasota, FL
6/30/2007 - We moved in
6/11/2010 - Our son Christopher was born
7/??/2010 - Wendy was cited to report in person at Tampa's Immigration Enforcement Office
1/20/2011 - Wendy left to Guatemala. our son stayed with me.

3/25/2013 - I became a U.S. Citizen
5/07/2013 - I-129F sent.
5/10/2013 - NOA1 received
8/22/2013 to 8/29/2013 - Visit for one week. Christopher stayed with mom.
10/24/2013 - RFE
11/25/2013 - NOA2 Approved!

01/31/2014 - INTERVIEW: Officer said everything was good, but gave us a 221g to submit a co-sponsor with form I-864

2/12/2014 - Was told to file Waivers

5/21/2014 - Waivers I-601 and I-212 filed

12/19/2014 - Waivers Approved

01/26/2015 - K1 VISA ON HAND!!!!!!



event.png

Filed: K-1 Visa Country: Peru
Timeline
Posted

I only wished I found this forum before I had a preparer fill everything for me. I realized I didn't include the intent to marry letters either. He told me that USCIS will ask me for everything I need, but never mention that I could avoid that RFE by sending all the basics. Now I'm preparing what I think they will ask me for in the RFE. I'm sure that's what I get instead of NOA2 aproval.

What i've seen is that they approve faster after an RFE.

And that ir doesn't affect in the interview.

Don't worry :)

January 13, 2012 - Start talking
June 20, 2012 - Visit 1
September 21, 2012 - Visit 2
December 31, 2012 - Visit 3
February 20, 2013 - Visit 4 (proposal the 24th)
April 15, 2013 - Package sent
April 18, 2013 - NOA1
May 30, 2013 - Visit 5
August 22, 2013 - Visit 6
August 29, 2013 - RFE
October 4, 2013 - NOA2 (after 5 months 2 weeks 2 days)
October 9, 2013 - NOA2 Hard Copy
November 8, 2013 - NVC case number (after 5 weeks)
November 15, 2013 - Embassy in Lima received the case
November 29, 2013 - Visit 7
January 3, 2014 - Visit 8
January 6, 2014 - INTERVIEW APPROVEDJanuary 11, 2014 - Visa in hand
May 1, 2014 - Visit 9
May 4, 2014 - POE
June 24, 2014 - MARRIED :star:
July 29, 2014 - Sent AOS
August 6, 2014 - NOA1
September 4, 2014 - Biometrics

October 17, 2014 - Travel&Work permit Approved

December 3, 2014 - AOS INTERVIEW - APPROVED

December 11, 2014 - Green Card in hand

September 7, 2016 - ROC sent

September 12, 2016 - NOA1
October 18, 2016 - Biometrics

October 17, 2019 - I-797C received

November 15, 2019 - Biometrics 

October 6, 2020 - Interview

November 18, 2020 - Naturalization ceremony
Ju44m5.png

8Hm5m5.png

lpi8m5.png

Posted

I remember another VJer sent G325 as well and got an RFE for that. The forms are almost exactly same or identical. People should read carefully before filled it out.

As you stated, you don't need a lawyer when you have a tons advises here and greatly happy to help you out. Someone suggested my fiance use a lawyer to ensemble our I-129F package and I highly refused it. So you are in right path on VJ! good luck!

Know your enemy and know yourself and you can fight a hundred battles without disaster.Strategy without tactics is the slowest route to victory. Tactics without strategy is the noise before defeat

- Sun Tzu-

It doesn't matter how slow you go as long as you don't stop

-Confucius-

 

-I am the beneficiary and my post is not reflecting my petitioner's point of views-

 

                                       Lifting Condition (I-751)

 

*Mailed I-751 package (06/21/2017) to CSC

*NOA-1 date (06/23/2017)

*NOA-1 received (06/28/2017)

*Check cashed (06/27/2017)

*Biometric Received (07/10/2017)

*Biometric Appointment (07/20/2017)

 

 

 

 

 

 

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...