Jump to content
lady_bug

all VJ members who recieve NVC RFE..pls..pls..share ur story here...

 Share

24 posts in this topic

Recommended Posts

Guys share ur experienced here about NVC RFE....

IR1...JOURNEY TO NVC...

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: I-864 AOS review fee ($88) online payment

10/13/2010: I-864 AOS status 'PAID'

10/16/2010: AOS package mailed out

10/16/2010: ds3032 accepted

10/17/2010: DS-230 IV fee ($404)...online payment..-in process

10/18/2010: I-864 AOS package delivery

10/21/2010: I-864 AOS package completion

10/19/2010: DS-230 IV status 'PAID',

10/20/2010: DS-230 IV package mailed out

10/22/2010: DS-230 IV package delivery

10/26/2010: AOS and ds230 enter to their system and under review

10/28/2010: NBI reciv at NVC mailing room.. track and confirmed by USPS

11/02/2010: NVC recieved my NBI and enter to their system/ operator said allow 2-4 weeks for the review

11/05/2010: RFE- AOS 2009 IRS tax...missing...(even if we included d 2007,2008,2009 irs tax) careless NVC,

11/13/2010: ds230 accepted no RFE..tnx GOD..

11/14/2010: checklist letter recieved

11/15/2010: RFE sent to NVC

11/16/2010: NVC recieved our RFE

11/30/2010: RFE enter to their system

12/02/2010: SIF

12/03/2010: case complete

12/07/2010: MEDICAL @ st.lukes PASSED!!!!

01/06/2010: interview date 6;30 am

01/12/2010: VISA ON HAND...

01/19/2010: flight POE ( DETROIT )

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

NVC MAKES MISTAKES.

was approaching week 3 of NVC, decided to log on and check for sif, no sif, ah what the heck, I called, and the AVR said missing documents. Called back and spoke to an operator. Operator said Civil Brazilian Certificate needed. Asking myself what is this? they only need a federal police certificate and seguranca do publica (state police) certificate. So I emailed the embassy. they responded very early the next morning with: "we suggest you call back NVC and have them clarify what they want, we only require the federal and state police certificates". So this time when I called I said that I had emailed the embassy and they specifically told me to call you back because they don't know what the *&$% your talking about! Was immediately transfered to a supervisor who explained to me that the state police certificate was not in the correct format, and that they needed the correct certificate to complete the process. this was back on the 1st of October. so I called my wife immediately and told her to get a new one and mail it to me asap. She mailed it on Oct 5, ( to this day, I still do not have the certificate from her). I stopped paying attention to NVC, no calls to AVR, no log in's to the website, (why should I do this if they need a document?) Then on October 14 received and email that case was completed on the 5th or 6th, can't remember now and that your interview date was set for NOV 8th. HMMMM, how could this be? The wife did NOT mail the document to them, and there is no way that they would have received it that quickly even if she did mail it to them. Word of advice, even if you have been given a checklist and you believe you sent in all the correct documents, still pay attention to NVC.

Engaged : 11/25/2009

Married : 02/12/2010

I-130 NOA 1: 03/21/2010

RFE : NONE

I-130 NOA 2 : 7/19/2010 (no touch's, no emails, no text notifications) Received Hard copy in mail 7/26 2010.

NVC Received : 8/02/2010

AOS Bill : 8/03/2010 ( Received Via Email after calling on 8/2/2010 )

Paid AOS Bill : 8/04/2010 ( Paid Invoice electronically )

AOS shown as paid : 8/05/2010

Mailed DS-3032 : 8/05/2010

Mailed I-864 pkg : 8/06/2010

NVC Receive i-864 : 8/09/2010

NVC Receive DS-3032 : 8/09/2010

IV Bill (available for pay): 8/20/2010

IV Bill Paid : 8/20/2010

IV Bill Shows Paid! : 8/23/2010 (just waitin for the docs from my wife now) should be here next week!

IV Package Sent Finally: 9/04/2010 (due to arrive 9/7)

Received checklist : 9/06/2010 (they are looking for the IV package) hmmm, ummm, I KNOW! So was I!

IV Package on AVR : 9/10/2010

Received Checklist 9/28/2010 (said PCC not in correct format)

Case Complete 10/13/2010 ( have not received replacement PCC from wife yet to send into NVC, How can this be?) I'm not complaining!

Interview 11/08/2010

PS As of 9/11/2010, USCIS website still not updated, shows NOA-1 date and... blah blah blah. don't count on them folks.

Link to comment
Share on other sites

NVC MAKES MISTAKES.

was approaching week 3 of NVC, decided to log on and check for sif, no sif, ah what the heck, I called, and the AVR said missing documents. Called back and spoke to an operator. Operator said Civil Brazilian Certificate needed. Asking myself what is this? they only need a federal police certificate and seguranca do publica (state police) certificate. So I emailed the embassy. they responded very early the next morning with: "we suggest you call back NVC and have them clarify what they want, we only require the federal and state police certificates". So this time when I called I said that I had emailed the embassy and they specifically told me to call you back because they don't know what the *&$% your talking about! Was immediately transfered to a supervisor who explained to me that the state police certificate was not in the correct format, and that they needed the correct certificate to complete the process. this was back on the 1st of October. so I called my wife immediately and told her to get a new one and mail it to me asap. She mailed it on Oct 5, ( to this day, I still do not have the certificate from her). I stopped paying attention to NVC, no calls to AVR, no log in's to the website, (why should I do this if they need a document?) Then on October 14 received and email that case was completed on the 5th or 6th, can't remember now and that your interview date was set for NOV 8th. HMMMM, how could this be? The wife did NOT mail the document to them, and there is no way that they would have received it that quickly even if she did mail it to them. Word of advice, even if you have been given a checklist and you believe you sent in all the correct documents, still pay attention to NVC.

i called NVC yesterday and it was only AVR...the message is...'' THE NVC REVIEWED YOUR PACKET FORMS AND FOUND DOCUMENTS ARE MISSING/INCOMPLETE the CHECKLIST FOR WAS SENT ON NOV 5...'''

i hope it was only a false RFE...

IR1...JOURNEY TO NVC...

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: I-864 AOS review fee ($88) online payment

10/13/2010: I-864 AOS status 'PAID'

10/16/2010: AOS package mailed out

10/16/2010: ds3032 accepted

10/17/2010: DS-230 IV fee ($404)...online payment..-in process

10/18/2010: I-864 AOS package delivery

10/21/2010: I-864 AOS package completion

10/19/2010: DS-230 IV status 'PAID',

10/20/2010: DS-230 IV package mailed out

10/22/2010: DS-230 IV package delivery

10/26/2010: AOS and ds230 enter to their system and under review

10/28/2010: NBI reciv at NVC mailing room.. track and confirmed by USPS

11/02/2010: NVC recieved my NBI and enter to their system/ operator said allow 2-4 weeks for the review

11/05/2010: RFE- AOS 2009 IRS tax...missing...(even if we included d 2007,2008,2009 irs tax) careless NVC,

11/13/2010: ds230 accepted no RFE..tnx GOD..

11/14/2010: checklist letter recieved

11/15/2010: RFE sent to NVC

11/16/2010: NVC recieved our RFE

11/30/2010: RFE enter to their system

12/02/2010: SIF

12/03/2010: case complete

12/07/2010: MEDICAL @ st.lukes PASSED!!!!

01/06/2010: interview date 6;30 am

01/12/2010: VISA ON HAND...

01/19/2010: flight POE ( DETROIT )

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

yes, you will have to wait till tomorrow and then call and speak to an operator. Have your paperwork in front of you, so that if you know you sent something, then ask to speak to a supervisor. the supervisor will explain in detail. It was shortly after I got off the phone with the supervisor that I received 2 emails from the previous day, and then that night I received another 2 emails from the discussion with the supervisor. Both emails explain exactly what is missing or incorrect and was complete with a checklist response cover sheet. So if you do in fact have a ledgit RFE or checklist as it is called with NVC, then send in the requested documents with the coversheet and your all set. The worse part from what I hear is waiting for them to be entered into the system. And DON'T LET YOUR GUARD DOWN! Keep checking the AVR and the log in page, just in case they pull another fast one....

Engaged : 11/25/2009

Married : 02/12/2010

I-130 NOA 1: 03/21/2010

RFE : NONE

I-130 NOA 2 : 7/19/2010 (no touch's, no emails, no text notifications) Received Hard copy in mail 7/26 2010.

NVC Received : 8/02/2010

AOS Bill : 8/03/2010 ( Received Via Email after calling on 8/2/2010 )

Paid AOS Bill : 8/04/2010 ( Paid Invoice electronically )

AOS shown as paid : 8/05/2010

Mailed DS-3032 : 8/05/2010

Mailed I-864 pkg : 8/06/2010

NVC Receive i-864 : 8/09/2010

NVC Receive DS-3032 : 8/09/2010

IV Bill (available for pay): 8/20/2010

IV Bill Paid : 8/20/2010

IV Bill Shows Paid! : 8/23/2010 (just waitin for the docs from my wife now) should be here next week!

IV Package Sent Finally: 9/04/2010 (due to arrive 9/7)

Received checklist : 9/06/2010 (they are looking for the IV package) hmmm, ummm, I KNOW! So was I!

IV Package on AVR : 9/10/2010

Received Checklist 9/28/2010 (said PCC not in correct format)

Case Complete 10/13/2010 ( have not received replacement PCC from wife yet to send into NVC, How can this be?) I'm not complaining!

Interview 11/08/2010

PS As of 9/11/2010, USCIS website still not updated, shows NOA-1 date and... blah blah blah. don't count on them folks.

Link to comment
Share on other sites

yes, you will have to wait till tomorrow and then call and speak to an operator. Have your paperwork in front of you, so that if you know you sent something, then ask to speak to a supervisor. the supervisor will explain in detail. It was shortly after I got off the phone with the supervisor that I received 2 emails from the previous day, and then that night I received another 2 emails from the discussion with the supervisor. Both emails explain exactly what is missing or incorrect and was complete with a checklist response cover sheet. So if you do in fact have a ledgit RFE or checklist as it is called with NVC, then send in the requested documents with the coversheet and your all set. The worse part from what I hear is waiting for them to be entered into the system. And DON'T LET YOUR GUARD DOWN! Keep checking the AVR and the log in page, just in case they pull another fast one....

YES..will call NVC tomorrow..im praying it was only FALSE RFE...its realy bad to stay in NVC that long... :(:(:(

IR1...JOURNEY TO NVC...

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: I-864 AOS review fee ($88) online payment

10/13/2010: I-864 AOS status 'PAID'

10/16/2010: AOS package mailed out

10/16/2010: ds3032 accepted

10/17/2010: DS-230 IV fee ($404)...online payment..-in process

10/18/2010: I-864 AOS package delivery

10/21/2010: I-864 AOS package completion

10/19/2010: DS-230 IV status 'PAID',

10/20/2010: DS-230 IV package mailed out

10/22/2010: DS-230 IV package delivery

10/26/2010: AOS and ds230 enter to their system and under review

10/28/2010: NBI reciv at NVC mailing room.. track and confirmed by USPS

11/02/2010: NVC recieved my NBI and enter to their system/ operator said allow 2-4 weeks for the review

11/05/2010: RFE- AOS 2009 IRS tax...missing...(even if we included d 2007,2008,2009 irs tax) careless NVC,

11/13/2010: ds230 accepted no RFE..tnx GOD..

11/14/2010: checklist letter recieved

11/15/2010: RFE sent to NVC

11/16/2010: NVC recieved our RFE

11/30/2010: RFE enter to their system

12/02/2010: SIF

12/03/2010: case complete

12/07/2010: MEDICAL @ st.lukes PASSED!!!!

01/06/2010: interview date 6;30 am

01/12/2010: VISA ON HAND...

01/19/2010: flight POE ( DETROIT )

Link to comment
Share on other sites

i sent my AOS first then after a week i sent my DS230 after 3 days again i sent my NBI-national bereau of investigation/police clearance in other country....

IR1...JOURNEY TO NVC...

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: I-864 AOS review fee ($88) online payment

10/13/2010: I-864 AOS status 'PAID'

10/16/2010: AOS package mailed out

10/16/2010: ds3032 accepted

10/17/2010: DS-230 IV fee ($404)...online payment..-in process

10/18/2010: I-864 AOS package delivery

10/21/2010: I-864 AOS package completion

10/19/2010: DS-230 IV status 'PAID',

10/20/2010: DS-230 IV package mailed out

10/22/2010: DS-230 IV package delivery

10/26/2010: AOS and ds230 enter to their system and under review

10/28/2010: NBI reciv at NVC mailing room.. track and confirmed by USPS

11/02/2010: NVC recieved my NBI and enter to their system/ operator said allow 2-4 weeks for the review

11/05/2010: RFE- AOS 2009 IRS tax...missing...(even if we included d 2007,2008,2009 irs tax) careless NVC,

11/13/2010: ds230 accepted no RFE..tnx GOD..

11/14/2010: checklist letter recieved

11/15/2010: RFE sent to NVC

11/16/2010: NVC recieved our RFE

11/30/2010: RFE enter to their system

12/02/2010: SIF

12/03/2010: case complete

12/07/2010: MEDICAL @ st.lukes PASSED!!!!

01/06/2010: interview date 6;30 am

01/12/2010: VISA ON HAND...

01/19/2010: flight POE ( DETROIT )

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

We got one for the I-864. My husband had not added up the assets column properly. I wanted to wring his neck.

Cost us nearly two weeks in waiting time.

03/27/2009: Engaged in Ithaca, New York.
08/17/2009: Wedding in Calcutta, India.
09/29/2009: I-130 NOA1
01/25/2010: I-130 NOA2
03/23/2010: Case completed.
05/12/2010: CR-1 interview at Mumbai, India.
05/20/2010: US Entry, Chicago.
03/01/2012: ROC NOA1.
03/26/2012: Biometrics completed.
12/07/2012: 10 year card production ordered.

09/25/2013: N-400 NOA1

10/16/2013: Biometrics completed

12/03/2013: Interview

12/20/2013: Oath ceremony

event.png

Link to comment
Share on other sites

we got an RFE at the USCIS stage. I didnt photocopy both sides of my divorce decree...so there was no proof it was actually filed with the court in their eye (court stamp was on the back). That delayed us a month since I was in Kuwait at the time. At least I had everything there with me and was able to send it...but I couldnt send it express :angry:

Luckily I was expedited through the NVC so they didnt have a chance to mess things up.

Edited by Scott and Mhay

For our Full timeline

event.png

Removal of conditions Journey

16 March 2012 Sent I-751 package from Aviano AB, Italy.

29 March 2012 Received everything back...wrong fee. thought we didn't have to pay biometrics since we were sending fingerprint cards and passport photos.

30 March 2012 Sent everything out again from Aviano AB, Italy.

10 April 2012 Check cashed

17 April 2012 Received NOA1 dated 6 April.

06 Dec 2012 Received 10 yr green card. Letter said it was approved 28 November 2012.

Link to comment
Share on other sites

I just recently called NVC..and the operator said that..’’ its our AOS..we have incomplete info..they need my husband 2009 IRS tax..but actually its included in our AOS that we’ve sent to them…how’s that??? Why is that happen??? And they don’t know when they goin to send the checklist letter because they are still reviewing our ds230 and our NBI… what do I need to ask them?? Do I need to speak to their supervisor???

IR1...JOURNEY TO NVC...

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: I-864 AOS review fee ($88) online payment

10/13/2010: I-864 AOS status 'PAID'

10/16/2010: AOS package mailed out

10/16/2010: ds3032 accepted

10/17/2010: DS-230 IV fee ($404)...online payment..-in process

10/18/2010: I-864 AOS package delivery

10/21/2010: I-864 AOS package completion

10/19/2010: DS-230 IV status 'PAID',

10/20/2010: DS-230 IV package mailed out

10/22/2010: DS-230 IV package delivery

10/26/2010: AOS and ds230 enter to their system and under review

10/28/2010: NBI reciv at NVC mailing room.. track and confirmed by USPS

11/02/2010: NVC recieved my NBI and enter to their system/ operator said allow 2-4 weeks for the review

11/05/2010: RFE- AOS 2009 IRS tax...missing...(even if we included d 2007,2008,2009 irs tax) careless NVC,

11/13/2010: ds230 accepted no RFE..tnx GOD..

11/14/2010: checklist letter recieved

11/15/2010: RFE sent to NVC

11/16/2010: NVC recieved our RFE

11/30/2010: RFE enter to their system

12/02/2010: SIF

12/03/2010: case complete

12/07/2010: MEDICAL @ st.lukes PASSED!!!!

01/06/2010: interview date 6;30 am

01/12/2010: VISA ON HAND...

01/19/2010: flight POE ( DETROIT )

Link to comment
Share on other sites

Got an RFE for both USCIS and NVC stage. but thankfully both RFE did not hold up the process too long. it seems like on the USCIS stage, a few days after the RFE was received back, the process moved forward to approval. and then on the NVC stage, had to correct one section in the AOS form for kids. but i submitted it with my ds-230 packet so that they would only have to deal with one packet instead of two in their system.

I-130 for wife and kids

---------------------------------------------

02/11/2010: I-130 as an LPR mailed certified

02/25/2010: Recvd letters-I-130s was recvd

06/17/2010: Oathtaking - Became a US Citizen

06/21/2010: Called USCIS to let them know to update my I-130 from an LPR petition to a USC petition.

06/25/2010: Case for both sons Touched

06/28/2010: Petition updated to a USC petition (Oldest son)

06/30/2010: Petition updated to a USC petition (Wife & youngest son)

07/19/2010: G-325A returned. Incomplete.

07/30/2010: Completed G-325A mailed back via certified mail

08/04/2010: Certified mail delivered at Laguna Niguel

08/07/2010: Touched - UCSIC received reply to RFE

08/13/2010: I-130 APPROVED!!! (recvd email update)

NVC JOURNEY

08/20/2010: NVC recvd I-130 and case number assigned

09/01/2010: Recvd AOS fee bill & DS-3032 via email

09/02/2010: Paid AOS fee & DS-3032 sent back via email

09/13/2010: AOS packet mailed via UPS

09/15/2010: AOS signed for by NVC. IV fee for wife & kids ready.

10/07/2010: Per AVR/NVC - Need to correct I864W for kids

10/11/2010: DS-230 packet & corrected I-864W sent to NVC via UPS

10/15/2010: Recvd and signed for by NVC

11/02/2010: NVC online fee payment portal SIF. NVC adviced that final stages of review.

11/03/2010: AVR - APPLICATION COMPLETED!!

11/10/2010: Medical...1st day at St. Luke's

11/12/2010: Pick up results for Medical - PASSED!

11/16/2010: USEM interview scheduled on 12/14/10

12/14/2010: VISAS APPROVED!!!!

12/20/2010: Visas received

02/22/2011: Cali bound

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

lady_bug- Please let me know when you receive the e-mail from the NVC because I am waiting for their e-mail as well. I received 2 RFE's for the AOS. 1 for not including a letter of employment (which I did but it must not have been good enough) and 2 for having a mistake on #25. The #25 is the one I am wondering about. Oh well, I will find out soon enough. Just have to wait for them to ding my for my DS230.

*~Cr1 Journey~* CSC

-NOA 1 Receipt date: 3/1/10 (sent 2/18/10)

-Touched 4 different times in between

-APPROVED: 6/2/10

93 days from NOA1 to NOA2

-Received NVC case number: 6/9/10/10

-Gave NVC my e-mail address & e-mailed DS3032: 6/10/10

-Received NVC e-mails (DS3032 and AOS Fee)& paid AOS fee: 6/11/10

-AOS Fee shows as PAID & paid IV Bill: 6/15/10

-IV Bill shows as paid: 6/6/10

-Received IV instruction packet: 6/8/10

-Received dox from co-sponsor: 10/14/15/10

-Sent AOS package: 10/18/10

-AOS package received: 10/19/10-J.Desmond

-IV Package mailed out: 11/3/10

-AVR says I have an RFE: 11/5/10

-NVC operator told me what my RFE's are: 11/8/10

-NVC sent checklist letter (for the 2 AOS RFE's): 11/13/10

-NVC operator says the IV package has been entered: 11/18/10

-E-mailed SUE to see if that would do anything (3 diff times...): 11/29/30/10

-Sent AOS RFE's: 12/1/10

-AOS RFE's received: 12/2/10

-Checked payment portal for fun (SIF!!!!): 12/3/10

-AVR still say AOS missing info: 12/3/10

-NVC operator says case was shipped to USE in Lima: 12/3/10

-Received interview date (12/13/10): JANUARY 6th, 2011!!

-Medical: 12/21/10- Passed :)

-Interivew: 1/6/11- PASSED :D

-Visa received- 1/13/11

-POE FLL- 1/23/11 YES! BUTTTTTTT....still not reunited :'( (Reunited on the 24th)

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nicaragua
Timeline

We had an RFE for the 2 passport photos of the beneficiary. We had included them as well, but according to the NVC they were missing. I (the beneficiary) took the pictures again, and sent them by Fedex directly to the NVC. It cost us an extra 6 weeks of just waiting until we finally got our Case Complete.

Link to comment
Share on other sites

lady_bug- Please let me know when you receive the e-mail from the NVC because I am waiting for their e-mail as well. I received 2 RFE's for the AOS. 1 for not including a letter of employment (which I did but it must not have been good enough) and 2 for having a mistake on #25. The #25 is the one I am wondering about. Oh well, I will find out soon enough. Just have to wait for them to ding my for my DS230.

hi teya..i will update you... NVC is still reviewing my ds230 i pray that there will no more RFE...

lady_bug- Please let me know when you receive the e-mail from the NVC because I am waiting for their e-mail as well. I received 2 RFE's for the AOS. 1 for not including a letter of employment (which I did but it must not have been good enough) and 2 for having a mistake on #25. The #25 is the one I am wondering about. Oh well, I will find out soon enough. Just have to wait for them to ding my for my DS230.

IR1...JOURNEY TO NVC...

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: I-864 AOS review fee ($88) online payment

10/13/2010: I-864 AOS status 'PAID'

10/16/2010: AOS package mailed out

10/16/2010: ds3032 accepted

10/17/2010: DS-230 IV fee ($404)...online payment..-in process

10/18/2010: I-864 AOS package delivery

10/21/2010: I-864 AOS package completion

10/19/2010: DS-230 IV status 'PAID',

10/20/2010: DS-230 IV package mailed out

10/22/2010: DS-230 IV package delivery

10/26/2010: AOS and ds230 enter to their system and under review

10/28/2010: NBI reciv at NVC mailing room.. track and confirmed by USPS

11/02/2010: NVC recieved my NBI and enter to their system/ operator said allow 2-4 weeks for the review

11/05/2010: RFE- AOS 2009 IRS tax...missing...(even if we included d 2007,2008,2009 irs tax) careless NVC,

11/13/2010: ds230 accepted no RFE..tnx GOD..

11/14/2010: checklist letter recieved

11/15/2010: RFE sent to NVC

11/16/2010: NVC recieved our RFE

11/30/2010: RFE enter to their system

12/02/2010: SIF

12/03/2010: case complete

12/07/2010: MEDICAL @ st.lukes PASSED!!!!

01/06/2010: interview date 6;30 am

01/12/2010: VISA ON HAND...

01/19/2010: flight POE ( DETROIT )

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...