18 minutes ago, SaadSaleem said:

We filed on 30th Sept and on Feb 22nd they transfered our case to Texas from Nebraska to speed up the process. Anyone has similar situation? 

 

They're going through September cases now so you should hopefully get notifications soon.  I had pd 9/26 (Nebraska), transferred on 2/15, and just got an approval last week. I see some people with PD in mid September are also still waiting for an approval so don't lose hope!

Edited by JessieABC

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Austria
Timeline
5 hours ago, SaadSaleem said:

We filed on 30th Sept and on Feb 22nd they transfered our case to Texas from Nebraska to speed up the process. Anyone has similar situation? 

We're one day ahead of you (PD 9/29, xfer to Texas 2/22), and we're still waiting, too... seemingly electronic notifications aren't working for transferred cases, so just keep an eye on your mailbox for NOA2... best of luck!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline

So my case tracking app finally got updated today stating that my case got sent to Department of State on 31st of March. I'm trying to go on USCIS web site's case tracking part but it's not working. I wonder how long should I wait for my case number to be assigned to me..?:rolleyes:

  • Got married - 9/26/2014
  • I-130 filed - 9/22/2016
  • NOA1(Went to Nebraska) - 9/27/2016 
  • Got transferred to Texas Service Center - 2/23/2017
  • NOA2 - 3/28/2017 
  • Got sent to NVC - 3/31/2017 
  • NVC received our case - 4/7/2017
  • Case number assigned - 4/6/2017
  • DS-261 Filled out - 4/10/2017
  • Welcome letter/invoice received - 4/11/2017
  • AOS fee payed - 4/12/2017
  • IV fee payed - 4/14/2017
  • Completed DS-260 Application - 4/20/2017
  • Sent documents to NVC - 5/15/2017
  • Scan Date - 5/19/2017
  • Case Complete at NVC - 7/19/2017
  • Interview date released - 8/1/2017
  • Interview date - 9/6/2017 - Approved!
  •  
Link to comment
Share on other sites

Filed: Other Timeline
42 minutes ago, Ulrica&Jesse said:

So my case tracking app finally got updated today stating that my case got sent to Department of State on 31st of March. I'm trying to go on USCIS web site's case tracking part but it's not working. I wonder how long should I wait for my case number to be assigned to me..?:rolleyes:

Wow that was fast my husband's i130 was approved the 3/24 where can i see when nvc receives my packet?

Help

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
1 hour ago, Maritza rmz said:

Wow that was fast my husband's i130 was approved the 3/24 where can i see when nvc receives my packet?

Help

 

 

You need to call NVC to inquire about that. Ask them if they already received your case or not.

  • Got married - 9/26/2014
  • I-130 filed - 9/22/2016
  • NOA1(Went to Nebraska) - 9/27/2016 
  • Got transferred to Texas Service Center - 2/23/2017
  • NOA2 - 3/28/2017 
  • Got sent to NVC - 3/31/2017 
  • NVC received our case - 4/7/2017
  • Case number assigned - 4/6/2017
  • DS-261 Filled out - 4/10/2017
  • Welcome letter/invoice received - 4/11/2017
  • AOS fee payed - 4/12/2017
  • IV fee payed - 4/14/2017
  • Completed DS-260 Application - 4/20/2017
  • Sent documents to NVC - 5/15/2017
  • Scan Date - 5/19/2017
  • Case Complete at NVC - 7/19/2017
  • Interview date released - 8/1/2017
  • Interview date - 9/6/2017 - Approved!
  •  
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country:
Timeline
Just now, Ulrica&Jesse said:

You need to call NVC to inquire about that. Ask them if they already received your case or not.

Shouldnt they first update on the app that the case was sent to department of state?

TIMELINE

31 May 2016 - legally married in Estonia, just the 2 of us
27 July 2016 - wedding ceremony & reception

 

USCIS Phase

08 September 2016 - I-130 sent to USCIS Chicago Lockbox (FILED FROM ABROAD)

14 September - I-130 received at Nebraska Service Center

16 September - NOA1 via e-mail

29 September - notice returned to USCIS because the Post Office could not deliver it

22 November - NOA1 finally received in the mail (in the US)

31 March 2017 - NOA 2 via e-mail, app and USCIS website

3 April - NOA 2 received in the mail (in the US)

11 April - Case Was Sent to Department of State 

 

NVC Phase

17 April - Case received by NVC

20 April - NVC case number assigned

21 April -  DS-261 Completed Online
25 April - Welcome e-mail received, AOS fee paid
27 April - IV fee Invoiced, IV fee paid
6 May - DS-260 Completed
10 May - AOS and IV package sent

15 May - Scan date

12 July - Case complete 😀
14 July - P4 Interview Letter

08 August - Medical

17 August - INTERVIEW - approved!
18 August - VISA ISSUED
23 August - Picked up the PASSPORT with the VISA inside

26 August - Immigrant Fee paid
18 September, 2017 - POE 

Removal Of Conditions


25 June, 2019 - ROC packet sent 
27 June - ROC packet delivered

 

 

 

 

Link to comment
Share on other sites

Filed: IR-2 Country: Mexico
Timeline
7 hours ago, mike1at said:

We're one day ahead of you (PD 9/29, xfer to Texas 2/22), and we're still waiting, too... seemingly electronic notifications aren't working for transferred cases, so just keep an eye on your mailbox for NOA2... best of luck!

We are also right behind you. Our case was received by Nebraska on 9/30/16. NOA1 10/04/16 and our case was transferred to Texas Service Center on 2/22/16. Checking my mail box everyday. Hope we all get approved soon!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline

Question - Do you guys know if I can start filling out the affidavit of support forms already just to have them ready or should I wait till the case number is assigned and I pay the fees?

Thanks.

 

  • Got married - 9/26/2014
  • I-130 filed - 9/22/2016
  • NOA1(Went to Nebraska) - 9/27/2016 
  • Got transferred to Texas Service Center - 2/23/2017
  • NOA2 - 3/28/2017 
  • Got sent to NVC - 3/31/2017 
  • NVC received our case - 4/7/2017
  • Case number assigned - 4/6/2017
  • DS-261 Filled out - 4/10/2017
  • Welcome letter/invoice received - 4/11/2017
  • AOS fee payed - 4/12/2017
  • IV fee payed - 4/14/2017
  • Completed DS-260 Application - 4/20/2017
  • Sent documents to NVC - 5/15/2017
  • Scan Date - 5/19/2017
  • Case Complete at NVC - 7/19/2017
  • Interview date released - 8/1/2017
  • Interview date - 9/6/2017 - Approved!
  •  
Link to comment
Share on other sites

1 minute ago, Ulrica&Jesse said:

Question - Do you guys know if I can start filling out the affidavit of support forms already just to have them ready or should I wait till the case number is assigned and I pay the fees?

Thanks.

 

Takes about 1-2 weeks for NVC to receive your docs and another week or two for case # to be assigned.

I haven't gotten my Case # yet but I've prepped everything for the I-864ez, all the DS260 questions and have started my Supporting documentation packet for send off.  Never too early!

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
1 hour ago, JessieABC said:

Takes about 1-2 weeks for NVC to receive your docs and another week or two for case # to be assigned.

I haven't gotten my Case # yet but I've prepped everything for the I-864ez, all the DS260 questions and have started my Supporting documentation packet for send off.  Never too early!

You mean, you filled the forms out already? Sorry if I'm being slow haha, I'm trying to figure out if I can fill the affidavit forms out already and save them on my pc or should I do that online and print them out with the bar codes and all that?

  • Got married - 9/26/2014
  • I-130 filed - 9/22/2016
  • NOA1(Went to Nebraska) - 9/27/2016 
  • Got transferred to Texas Service Center - 2/23/2017
  • NOA2 - 3/28/2017 
  • Got sent to NVC - 3/31/2017 
  • NVC received our case - 4/7/2017
  • Case number assigned - 4/6/2017
  • DS-261 Filled out - 4/10/2017
  • Welcome letter/invoice received - 4/11/2017
  • AOS fee payed - 4/12/2017
  • IV fee payed - 4/14/2017
  • Completed DS-260 Application - 4/20/2017
  • Sent documents to NVC - 5/15/2017
  • Scan Date - 5/19/2017
  • Case Complete at NVC - 7/19/2017
  • Interview date released - 8/1/2017
  • Interview date - 9/6/2017 - Approved!
  •  
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline

:D Can't wait to start calling NVC

Uscis petiton update.jpg

  • Got married - 9/26/2014
  • I-130 filed - 9/22/2016
  • NOA1(Went to Nebraska) - 9/27/2016 
  • Got transferred to Texas Service Center - 2/23/2017
  • NOA2 - 3/28/2017 
  • Got sent to NVC - 3/31/2017 
  • NVC received our case - 4/7/2017
  • Case number assigned - 4/6/2017
  • DS-261 Filled out - 4/10/2017
  • Welcome letter/invoice received - 4/11/2017
  • AOS fee payed - 4/12/2017
  • IV fee payed - 4/14/2017
  • Completed DS-260 Application - 4/20/2017
  • Sent documents to NVC - 5/15/2017
  • Scan Date - 5/19/2017
  • Case Complete at NVC - 7/19/2017
  • Interview date released - 8/1/2017
  • Interview date - 9/6/2017 - Approved!
  •  
Link to comment
Share on other sites

22 minutes ago, Ulrica&Jesse said:

You mean, you filled the forms out already? Sorry if I'm being slow haha, I'm trying to figure out if I can fill the affidavit forms out already and save them on my pc or should I do that online and print them out with the bar codes and all that?

I downloaded/filled out/saved the forms on my computer, have pdf versions of my taxes, have a cover letter typed up.  I didn't have barcodes on the I-864Ez.  The welcome letter will have a page with a barcode though which you will need to include.

Once i get my case #, I'll be updating it on the files where I can and printing out Avery labels for the pages with my husband's name and case #.

18 minutes ago, Ulrica&Jesse said:

:D Can't wait to start calling NVC

Uscis petiton update.jpg

 

Lol that's exactly how i'm feeling.

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
1 hour ago, JessieABC said:

I downloaded/filled out/saved the forms on my computer, have pdf versions of my taxes, have a cover letter typed up.  I didn't have barcodes on the I-864Ez.  The welcome letter will have a page with a barcode though which you will need to include.

Once i get my case #, I'll be updating it on the files where I can and printing out Avery labels for the pages with my husband's name and case #.

 

Lol that's exactly how i'm feeling.

Wow, now I really think I should go ahead and do the same! Any idea if I should include copy of my local police certificate to the package? And do you know where can I get some sort of template for a cover letter? :rolleyes:

  • Got married - 9/26/2014
  • I-130 filed - 9/22/2016
  • NOA1(Went to Nebraska) - 9/27/2016 
  • Got transferred to Texas Service Center - 2/23/2017
  • NOA2 - 3/28/2017 
  • Got sent to NVC - 3/31/2017 
  • NVC received our case - 4/7/2017
  • Case number assigned - 4/6/2017
  • DS-261 Filled out - 4/10/2017
  • Welcome letter/invoice received - 4/11/2017
  • AOS fee payed - 4/12/2017
  • IV fee payed - 4/14/2017
  • Completed DS-260 Application - 4/20/2017
  • Sent documents to NVC - 5/15/2017
  • Scan Date - 5/19/2017
  • Case Complete at NVC - 7/19/2017
  • Interview date released - 8/1/2017
  • Interview date - 9/6/2017 - Approved!
  •  
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ethiopia
Timeline
On 3/31/2017 at 1:22 PM, tianbian123 said:

are you a beneficiary and live in Taxes? my husband called on WEDNESDY, ask why our case being trasferred to new york local office, and the tier 2 office said because the beneficiary (which is me ) who live in new york city

I don't know if where you live has much to do with where you get transferred. I initially filed from abroad, got sent to Nebraska but changed our address back to my US address in California back in December. So, I, the petitioner lives in California and our case got transferred from Nebraska to Texas...I think they are just shifting the work load. 

Service Center :Texas Service Center

Transferred? No

Consulate :Ethiopia

Marriage (if applicable):2016-07-21

I-130 Sent :2018-01-29

I-130 NOA1 :2018-02-26

I-130 Approved :2018-08-30

NVC Received :2018-09-28

Send AOS Package :2018-11-19

Send IV Package :2018-11-19

Receive Instruction and Interview appointment letter : 2019-01-09

Case Completed at NVC :2018-12-28

Interview Date : 2019-02-25

 

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...