Filed: Citizen (pnd) Country: Peru
Timeline
Posted

... forgot to provide some important data, here are the number of NOA2 approvals by service center for those 200 "normal" petitions, according to our timelines:

California - 71

Texas - 47

Nebraska - 41

Vermont - 1

NBC - 40

06-09-2012 - Met in Lima, Peru
06-27-2012 - Officially a couple
02-14-2013 - Engaged!

05-02-2013 - Married in Callao, Peru!

07-03-2013 - I-130 petitions sent for wife and stepson

07-10-2013 - NOA1 (both petitions)

12-10-2013 - Notice of transfer to California Service Center from NBC (both petitions)

12-23-2013 - NOA2 (both petitions)

01-06-2014 - NVC Received

01-29-2014 - NVC case numbers assigned

02-06-2014 - DS-261 available and submitted (both petitions)

02-07-2014 - AOS bill invoiced and paid

02-08-2014 - AOS packages mailed (received on 02-18-14 per NVC)

02-11-2014 - AOS shows PAID

02-12-2014 - Resubmitted I-864 (noticed own error after sending AOS package) (received on 03-05-14 per NVC)

02-18-2014 - Stepson IV bill invoiced and paid

02-20-2014 - Stepson IV bill shows PAID, DS-260 available and submitted

02-21-2014 - Wife IV bill invoiced and paid

02-21-2014 - IV packages mailed (received on 02-26-14 per NVC)

02-25-2014 - Wife IV bill shows PAID, DS-260 available

02-26-2014 - Wife DS-260 submitted

03-06-2014 - AOS checklist requesting correct income information (sent on 02-12-14, waiting for review)
03-10-2014 - IV "false" checklist

03-14-2014 - CASE COMPLETE (Wife and stepson)

04-02-2014 - Email with Interview Letters. May 12th for both wife and stepson

04-21-2014 - Medical Examinations

05-12-2014 - Interview Result: BOTH VISAS APPROVED!

05-17-2014 - Visas in hand

09-07-2014 - Dallas POE (wife)

10-15-2014 - Miami POE (step-son)

Posted (edited)

There are monthly spreadsheets that capture all the transfers

http://www.visajourney.com/forums/topic/470656-monthly-transfer-spreadsheets-in-order/?p=6703069

Edited by LoveMyTico

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

Good Job :)

I-130 USCIS

NOA1: 08/15/2013

NOA1 Hardcopy: 08/22/2013

Case transferred to CSC: 02/10/2014

Case transfer Hardcopy: 02/19/2014

NOA2: 03/05/2014

NOA2 Hardcopy: 03/10/2014

NVC:

Case arrived at NVC: 03/13/2014

Case number,IIN,BIN assigned and email id given: 04/14/2014

DS261 Available and Completed: 04/18/2014

DS261 accepted and received instruction: 04/21/2014

AOS fee paid and Payment status is "IN PROCESS": 04/21/2014

AOS Payment status shows PAID: 04/24/2014

AOS mailed to NVC: 04/24/2014

IV fee paid and payment status shows " IN PROCESS" : 04/25/2014

IV fee payment status shows PAID: 04/29/2014

Approved IV packet and DS260: 05/20/2014

Interview Date(Got from NVC by call on 05/30/2014): 07/15/2014

Received Interview Letter from NVC by email: 06/02/2014.

Biometrics done at VAC,Chennai: 06/16/2014

Medicals done at Apollo,Chennai: 06/17/2014

VISA APPROVED at Mumbai embassy: 07/15/2014

VISA Pick up at Chennai VFC: 07/18/2014

Port Of Entry: 9/4/2014

SSN Arrived: 10/6/2014

Green Card Arrived: 10/22/2014

Case Complete: 05/27/2014

 

Removal of Conditional - Joint Waiver/Divorced

 

Green Card Expired: 9/04/2016

NOA Date: 7/13/2016

Biometric Date: 8/2/2016

I-551 Samping: 7/7/2017 at Dallas Field Office

I-751 Approved: 10/07/2017 (USCIS status: New card is being produced)

New Green Card Received:  

 

Filed: Citizen (pnd) Country: Peru
Timeline
Posted

There are monthly spreadsheets that capture all the transfers

http://www.visajourney.com/forums/topic/470656-monthly-transfer-spreadsheets-in-order/?p=6703069

Yeah but I wasn't sure which was more up to date.. I could try to reference those sheets to see transfers to service centers that are not reported on the timelines

06-09-2012 - Met in Lima, Peru
06-27-2012 - Officially a couple
02-14-2013 - Engaged!

05-02-2013 - Married in Callao, Peru!

07-03-2013 - I-130 petitions sent for wife and stepson

07-10-2013 - NOA1 (both petitions)

12-10-2013 - Notice of transfer to California Service Center from NBC (both petitions)

12-23-2013 - NOA2 (both petitions)

01-06-2014 - NVC Received

01-29-2014 - NVC case numbers assigned

02-06-2014 - DS-261 available and submitted (both petitions)

02-07-2014 - AOS bill invoiced and paid

02-08-2014 - AOS packages mailed (received on 02-18-14 per NVC)

02-11-2014 - AOS shows PAID

02-12-2014 - Resubmitted I-864 (noticed own error after sending AOS package) (received on 03-05-14 per NVC)

02-18-2014 - Stepson IV bill invoiced and paid

02-20-2014 - Stepson IV bill shows PAID, DS-260 available and submitted

02-21-2014 - Wife IV bill invoiced and paid

02-21-2014 - IV packages mailed (received on 02-26-14 per NVC)

02-25-2014 - Wife IV bill shows PAID, DS-260 available

02-26-2014 - Wife DS-260 submitted

03-06-2014 - AOS checklist requesting correct income information (sent on 02-12-14, waiting for review)
03-10-2014 - IV "false" checklist

03-14-2014 - CASE COMPLETE (Wife and stepson)

04-02-2014 - Email with Interview Letters. May 12th for both wife and stepson

04-21-2014 - Medical Examinations

05-12-2014 - Interview Result: BOTH VISAS APPROVED!

05-17-2014 - Visas in hand

09-07-2014 - Dallas POE (wife)

10-15-2014 - Miami POE (step-son)

Filed: Country: Latvia
Timeline
Posted

Makes me sad how pathetic NSC is = (

04/14/12 - First date in the U.S.

02/26/13 - Married

06/3/13 - Petition Filed (had been unsuccessfully trying to move to Europe)

06/6/13 - NOA1 (National Benefits Center)

12/19/13 - Transferred to Nebraska Service Center

03/3/14 - I130 Approved

03/18/14 - NVC Received file from USCIS

04/28/14 - Received/Paid AOS Bill

05/01/14 - Received/Paid IV Bill

05/14/14 - Sent AOS Package

05/30/14 - Sent IV Package

06/05/14 - Submitted DS-260

06/19/14 - Received checklist for AOS, resubmitted required corrections

08/09/14 - Case completed at NVC

08/14/14 - Received Interview Date

09/08/14 - Interview date - Approved!

09/11/14 - Raced into town, threw car into a parking spot, and ran down city streets to get to the courier company 2 minutes before the close to get passport back

10/10/14 - POE Entry

Posted

Yeah but I wasn't sure which was more up to date.. I could try to reference those sheets to see transfers to service centers that are not reported on the timelines

actually, I don't know how accurate the timelines are as I don't think everyone has updated the service center they were transferred to. I know I didn't.

My info is on the spread sheets. Some people didn't even fill in the correct Country on their timelines. Armenia is the default.... So many people were on top of the spread sheets. August has gone willy nilly as they decided to add everyone whether they were transferred or not even though they were originally created to track the transfers.

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Filed: Citizen (pnd) Country: Peru
Timeline
Posted

actually, I don't know how accurate the timelines are as I don't think everyone has updated the service center they were transferred to. I know I didn't.

My info is on the spread sheets. Some people didn't even fill in the correct Country on their timelines. Armenia is the default.... So many people were on top of the spread sheets. August has gone willy nilly as they decided to add everyone whether they were transferred or not even though they were originally created to track the transfers.

True.. I'll try to do the same graph with the data from the spreadsheets to see what the differences are

06-09-2012 - Met in Lima, Peru
06-27-2012 - Officially a couple
02-14-2013 - Engaged!

05-02-2013 - Married in Callao, Peru!

07-03-2013 - I-130 petitions sent for wife and stepson

07-10-2013 - NOA1 (both petitions)

12-10-2013 - Notice of transfer to California Service Center from NBC (both petitions)

12-23-2013 - NOA2 (both petitions)

01-06-2014 - NVC Received

01-29-2014 - NVC case numbers assigned

02-06-2014 - DS-261 available and submitted (both petitions)

02-07-2014 - AOS bill invoiced and paid

02-08-2014 - AOS packages mailed (received on 02-18-14 per NVC)

02-11-2014 - AOS shows PAID

02-12-2014 - Resubmitted I-864 (noticed own error after sending AOS package) (received on 03-05-14 per NVC)

02-18-2014 - Stepson IV bill invoiced and paid

02-20-2014 - Stepson IV bill shows PAID, DS-260 available and submitted

02-21-2014 - Wife IV bill invoiced and paid

02-21-2014 - IV packages mailed (received on 02-26-14 per NVC)

02-25-2014 - Wife IV bill shows PAID, DS-260 available

02-26-2014 - Wife DS-260 submitted

03-06-2014 - AOS checklist requesting correct income information (sent on 02-12-14, waiting for review)
03-10-2014 - IV "false" checklist

03-14-2014 - CASE COMPLETE (Wife and stepson)

04-02-2014 - Email with Interview Letters. May 12th for both wife and stepson

04-21-2014 - Medical Examinations

05-12-2014 - Interview Result: BOTH VISAS APPROVED!

05-17-2014 - Visas in hand

09-07-2014 - Dallas POE (wife)

10-15-2014 - Miami POE (step-son)

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline
Posted

Pls room is it true nebraska is working on feb 2013 petition now?

Service Center - Nebraska

I -130 sent - November 11, 2013

NOA 1 - November 18, 2013

RFE - May 16, 2014

RFE sent to USCIS - May 26,2014

RFE Received at USCIS - May 30,2014

I-130 NOA 2 June 12 2014

I-129f NOA 2 June 12 2014

NVC
30-06-2014 - NVC received the case

21-07-2014 - NVC case number assigned

XX-XX-2014 - I-864(AOS) Bill Generated and paid
XX-XX-2014 - Sent I-864(AOS) Package

XX-XX-2014 - IV bill invoiced and paid

XX-XX-2014 - DS-260 completed online
XX-XX-2014 - IV packets sent
XX-XX-2014 - Case completed
XX-XX-2014 - Interview scheduled

Consulate
XX-XX-2014 - Medical
XX-XX-2014 - Interview
XX-XX-2014 - Visa in hand
XX-XX-2014 - POE

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

This is terrible. Does that mean Vermont is just NOT adjudicating petitions???????????????????????????????????????????????????????

I-130 Sent: 11 November 2013

I-130 1st i-797(NOA-1): 12 November 2013, Vermont (Dis-)Service Center (1 day in transit)

I-130 2nd i-797(NOA-2): 30 May 2014, Vermont (Total Dis-)Service Center (199 days in USCIS hell)

I-30 Received at NVC: 11 June 2014 (11 days in transit)

NVC Case # Assigned: 27 June 2014 (15 days to case number assigned)

DS-261 Completed: 15 July 2014 (18 days to DS-261 available)

AOS Fee Bill Paid: 17 July 2014

AOS Fee Bill Shows "Paid": 22 July 2014

AOS Package Sent Out:23 July 2014

AOS Package Recieved: 28 July 2014

DS-260 Completed: ?

IV Fee Bill Paid: ?

November 2014 USCIS Spreadsheet: https://docs.google.com/spreadsheet/ccc?key=0Aqgp_fafY_R6dFI3cDREc2tNWV9qV09mMzN3WXR2dEE&usp=sharing#gid=3

Filed: Citizen (pnd) Country: Peru
Timeline
Posted

This is terrible. Does that mean Vermont is just NOT adjudicating petitions???????????????????????????????????????????????????????

I don't think petitions were being sent to Vermont until recently, so that's why there may not be any data.

06-09-2012 - Met in Lima, Peru
06-27-2012 - Officially a couple
02-14-2013 - Engaged!

05-02-2013 - Married in Callao, Peru!

07-03-2013 - I-130 petitions sent for wife and stepson

07-10-2013 - NOA1 (both petitions)

12-10-2013 - Notice of transfer to California Service Center from NBC (both petitions)

12-23-2013 - NOA2 (both petitions)

01-06-2014 - NVC Received

01-29-2014 - NVC case numbers assigned

02-06-2014 - DS-261 available and submitted (both petitions)

02-07-2014 - AOS bill invoiced and paid

02-08-2014 - AOS packages mailed (received on 02-18-14 per NVC)

02-11-2014 - AOS shows PAID

02-12-2014 - Resubmitted I-864 (noticed own error after sending AOS package) (received on 03-05-14 per NVC)

02-18-2014 - Stepson IV bill invoiced and paid

02-20-2014 - Stepson IV bill shows PAID, DS-260 available and submitted

02-21-2014 - Wife IV bill invoiced and paid

02-21-2014 - IV packages mailed (received on 02-26-14 per NVC)

02-25-2014 - Wife IV bill shows PAID, DS-260 available

02-26-2014 - Wife DS-260 submitted

03-06-2014 - AOS checklist requesting correct income information (sent on 02-12-14, waiting for review)
03-10-2014 - IV "false" checklist

03-14-2014 - CASE COMPLETE (Wife and stepson)

04-02-2014 - Email with Interview Letters. May 12th for both wife and stepson

04-21-2014 - Medical Examinations

05-12-2014 - Interview Result: BOTH VISAS APPROVED!

05-17-2014 - Visas in hand

09-07-2014 - Dallas POE (wife)

10-15-2014 - Miami POE (step-son)

Filed: Citizen (pnd) Country: Peru
Timeline
Posted

There are monthly spreadsheets that capture all the transfers

http://www.visajourney.com/forums/topic/470656-monthly-transfer-spreadsheets-in-order/?p=6703069

Here is the same graph but with the data from the spreadsheets:

VJtrends2.png

The main difference between the two graphs are the petitions at the NBC. It looks like Feb-Apr filers have not updated their timelines with the service centers they were transferred to. Also, May filers may not have the spreadsheets updated with NOA2s.

06-09-2012 - Met in Lima, Peru
06-27-2012 - Officially a couple
02-14-2013 - Engaged!

05-02-2013 - Married in Callao, Peru!

07-03-2013 - I-130 petitions sent for wife and stepson

07-10-2013 - NOA1 (both petitions)

12-10-2013 - Notice of transfer to California Service Center from NBC (both petitions)

12-23-2013 - NOA2 (both petitions)

01-06-2014 - NVC Received

01-29-2014 - NVC case numbers assigned

02-06-2014 - DS-261 available and submitted (both petitions)

02-07-2014 - AOS bill invoiced and paid

02-08-2014 - AOS packages mailed (received on 02-18-14 per NVC)

02-11-2014 - AOS shows PAID

02-12-2014 - Resubmitted I-864 (noticed own error after sending AOS package) (received on 03-05-14 per NVC)

02-18-2014 - Stepson IV bill invoiced and paid

02-20-2014 - Stepson IV bill shows PAID, DS-260 available and submitted

02-21-2014 - Wife IV bill invoiced and paid

02-21-2014 - IV packages mailed (received on 02-26-14 per NVC)

02-25-2014 - Wife IV bill shows PAID, DS-260 available

02-26-2014 - Wife DS-260 submitted

03-06-2014 - AOS checklist requesting correct income information (sent on 02-12-14, waiting for review)
03-10-2014 - IV "false" checklist

03-14-2014 - CASE COMPLETE (Wife and stepson)

04-02-2014 - Email with Interview Letters. May 12th for both wife and stepson

04-21-2014 - Medical Examinations

05-12-2014 - Interview Result: BOTH VISAS APPROVED!

05-17-2014 - Visas in hand

09-07-2014 - Dallas POE (wife)

10-15-2014 - Miami POE (step-son)

Filed: Country: Canada
Timeline
Posted

Hey VJers!

I wanted to share some data that I'm playing around with. I took 300 of the latest petitions that were approved (NOA2) according to updated timelines, and created a graph to show trends for each service center and where they are as far as approving our petitions. I removed all petitions from the Philippines and any that were blatant expedites (at least to my eye and from doing some research in the forum), and this is what I came up with:

VJtrends.png

Out of the 300 latest approvals, 200 were "normal" petitions. There were just a couple of outliers (1 approval in Vermont and 4 approvals with NOA1s before February).

Also, one thing to consider is that some people have not updated their timelines to show what service center they were transferred to, but they did update their NOA2 and it will show as an approval at the NBC.

Some other small details... there were a total of 4 petitions that were reported as originally going to a service center instead of the NBC, and were approved in their original service centers. There were 4 petitions that started out in a service center and transferred to NBC, and approved at the NBC.

Let me know if you guys have any questions!

This is awesome!! Great job! I'm an April CSC approval. I'm not sure If I updated my timeline to reflect my service center but I'm going to double check now knowing the data could be used or helpful.

event.png

NOA1 - April 19, 2013

Case Transfer - November 25, 2013

NOA2 - December 4, 2013 (via CSC)

NVC rec'd - December 16, 2013

NVC case number - January 7, 2014

Email from NVC confirming EP - January 10, 2014

DS-261 avail and completed - January 15, 2014

AOS fee avail and paid - January 17, 2014

AOS fee shows "paid" - January 22, 2014

AOS/i-864 package sent - January 24, 2014

IV invoiced and paid - January 24, 2014

IV shows "paid" - January 29, 2014

DS-260 avail and completed - January 29, 2014

IV package sent - Janaury 31, 2014

Case COMPLETE!! - February 27, 2014 dancin5hr.gifdancin5hr.gifdancin5hr.gifdancin5hr.gifdancin5hr.gifdancin5hr.gif

Medical Complete - March 24, 2014

Interview - April 2, 2014

APPROVED!! at April 2, 2014 interview, husband comes to Canada April 10th to cross over once my passport is returned. :wow:

April 13, 2014 - All moved in and even welcomed with a big surprise 'welcome to America party' by my husband and friends I've made here over the last year.

Filed: K-1 Visa Country: Philippines
Timeline
Posted

WHY, do you not include the Philippines in your study, which I find intereating.,.,.,and is Vermont Service Center known as NBC now??? Just wondering.,..

Just do not know why you would leave out one of the biggest K-1 countries in the world.,.,but nice job.,.,.with WHAY you used!

Hope someone answers the question about VCS being called NBC????

Filed: Other Country: India
Timeline
Posted

WHY, do you not include the Philippines in your study, which I find intereating.,.,.,and is Vermont Service Center known as NBC now??? Just wondering.,..

Just do not know why you would leave out one of the biggest K-1 countries in the world.,.,but nice job.,.,.with WHAY you used!

Hope someone answers the question about VCS being called NBC????

Philippines was excluded because they have expedites.

Vermont Service Center is not the NBC.

NBC = National Benefits Center = Missouri Service Center - receipt numbers start with the letters MSC.

Vermont is not NBC.

Vermont is not processing i-130s

This conversation thread has nothing to do with K-1s - those are fiance visas

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...