Jump to content
glemette

F2A Spouse of LPR_I130 filed September 2013

 Share

103 posts in this topic

Recommended Posts

Your I-130 might get processed/ approved and I485 will be processed to a certain stage (Preadjudicated) assuming your I485 is clean (ie: No RFE's and so forth). They will not approve I-485 until your PD becomes current.

thanks for you reply.

I am wondering why would they even process those applications when PD are not current? They do have lots of other applications to process, why would they spend their time doing applications whose PD are not current!?

It seems logically that they process those applications only if they have time - if they are not busy with applications whose PD are current.

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

Heyyy...Guys.....I am new in this thread.....I am a Permanent resident and will be filing for my wife next week, please do add me in the list of people who have filed for their spouses....My Native country is INDIA....

Thankssss

I-130 / F-2A



USCIS


November 14 2013 I-130 Sent to Chicago Lockbox


November 15 2013 I-130 Received at Chicago Lockbox Facility


November 18 2013 Email from USCIS about Petition Acceptance (PD Nov 15 2013)


November 19 2013 I 797 NOA 1 received by mail


March 24 2015 Received E Mail and Text Notification about Case transfer to another USCIS Office


March 28 2015 Received Hard copy of Transfer Notice from USCIS


March 31 2015 Case Approved by USCIS


April 1 2015 Received Email and Text message for Case Approval


April 4 2015 Received Hard Copy of NOA2 from USCIS



NVC STAGE


April 16 2015 Case received at NVC


April 24 2015 Case Number and IIN received on Call


April 27 2015 Paid AOS Fees and Submitted DS-261


April 29 2015 Welcome Letter from NVC in Email


May 05 2015 DS-261 reviewed over phone


May 06 2015 AOS & Civil Documents sent to NVC


May 07 2015 Documents received at NVC


May 08 2015 Email from NVC to pay IV Fees


June 08 2015 IV PAID


June 10 2015 Submitted DS-260


July 13 2015 Case Completed


July 29 2015 Finally....Got Interview Date


Sep 18 2015 Interview (Approved)






Link to comment
Share on other sites

Filed: Country: Sweden
Timeline

Hi

my husbands green card was lost before he even gets it and he is in process of renewal. when we sent the I130 application, we only sent the passport stamps. he is still in inital review. does anybody know this will result in my case rejection?

1/10/2013 : We sent I130 application to chicago

3/10/2013 : Application received - Priority date

8/10/2013 : NOA1 hard copy received

26/3/2015: Case Transfered to California

2/4/2015 : I-130 Approval

5/4/2015 : NOA2 Hard Copy received

23/4/2015 : NVC recieved the case

1/5/2015 : Case number and IIN assigned (Phone Call)

11/5/2015 : DS-261 Available and completed

27/5/2015 : Both fees were paid via post

28/5/2015 : AOS and IV package mailed to NVC

6/6/2015 : Scan date - Document received by NVC

5/7/2015 : DS-260 Available and completed

6/7/2015 : Checklist ( marriage certificate from another authority- i864 ( missing tax for 2014)

16/7/2015 : our new Scan date

12/10/2015 : 2nd checklist: NVC lost the resident permit document and ask it again.

20/10/2015 : new scan date

24/11/2015: case complete

CONSULATE

24/1/2016 : Medical
2/2/2016 : Interview
3/3/2016 : Visa in hand
15/4/2016 : POE

Link to comment
Share on other sites

thanks for you reply.

I am wondering why would they even process those applications when PD are not current? They do have lots of other applications to process, why would they spend their time doing applications whose PD are not current!?

It seems logically that they process those applications only if they have time - if they are not busy with applications whose PD are current.

There are three (3) stages:

1. USCIS approves the petition

2. NVC handles the VISA application

3. Consulate approves the VISA and embassy prints it

USCIS will review and approve the petition and then send it to NVC. It is at this stage when it matters whether or not ure priority date is current since the VISA will not be issued until it is.

So, for example - persons being petitioned under the F1 category (Unmarried Sons and Daughters of US Citizens) who have a wait time of 7 years for most countries will still have their petitions reviewed. After they are approved, a letter is mailed confirming this, but stating that a VISA number is not yet available. The petition will be sent off to NVC where it will be "stored" until around the 6th year when according to their "in-house predictions", a VISA number will become available. After this, both the petitioner and beneficiary are contacted and the process continues. ~~~

:energy:I am the beneficiary :energy:

h5Wpm5.png

event.png

event.png

Apr 18, 2014 ~ Date of Marriage (City Hall - New York, NY USA) (L)(F)(L)

USCIS

Jun 02, 2014 - I -130 package mailed to Chicago Lockbox via USPS (Priority Mail)

Jun 04, 2014 - I -130 package delivered

Jun 05, 2014 - PRIORITY DATE B-)

Jun 08, 2014 - NOA1 (USCIS acceptance confirmation via e-mail)/package routed to VSC

Jun 12, 2014 - NOA1 (hard copy)

Mar 24, 2015 - Transfer Notice (e-mail)

Mar 28, 2015 - Transfer Notice. Case transferred to California Service Center (regular mail)

Mar 31, 2015 - NOA2 (e-mail) Yipppiiiieeeee!!! :dancing::dance:

Apr 04, 2015 - NOA2 (regular mail)

NVC

Apr 27, 2015 - NVC received case

May 12, 2015 - Affidavit of Support (AOS) Fee invoiced

May 15, 2015 - NVC Welcome Letter (regular mail)

May 26, 2015 - DS-261 (Choice of Agent Form) submitted

May 26, 2015 - AOS Fee paid (Staus: In Process)

May 27, 2015 - AOS Fee (Staus: Paid)

Aug 12, 2015 - IV Fee paid (Staus: In Process)

Aug 14, 2015 - IV Fee (Staus: Paid)

Aug 27, 2015 - I-864 EZ filled out

Aug 27, 2015 - DS 260 submitted

Aug 28, 2015 - AOS and IV packages mailed to NVC

Aug 31, 2015 - NVC receives AOS and IV packages

Sep 03, 2015 - NVC confirms they rec'd packages (e-mail)

Link to comment
Share on other sites

@Miss Tams

I am not sure that we are at the same page. Anyway thank you for your response.

What I was telling is that a person is already within the US, doing AOS - i-130 and i-485, but the visa category retrogressed. So, the person filed AOS while the visa was current. My question is why would the immigration even process those applications since they have lots of other application, whose visa numbers are available.

Link to comment
Share on other sites

@Miss Tams

I am not sure that we are at the same page. Anyway thank you for your response.

What I was telling is that a person is already within the US, doing AOS - i-130 and i-485, but the visa category retrogressed. So, the person filed AOS while the visa was current. My question is why would the immigration even process those applications since they have lots of other application, whose visa numbers are available.

Oh, OK. Well, for clarity, the visa bulletin did not regress. The date has just remained the same since September.

They would still go ahead and process the petition because it was filed when a visa number was available. Since the priority date (PD) was "current" at the time, they'd still qualify because their PD would be before Sep. 8, 2013. It's if the VB goes back to let's say July 8, 2013, then they would not qualify until their PD becomes current again.

As the Dept. of State has stated, it will remain at Sep. 8, 2013 for a few months. I guess this is to accommodate the visas that will be used up by persons who are adjusting status, and then they'll check their stats and move on from there. ~~~

:energy:I am the beneficiary :energy:

h5Wpm5.png

event.png

event.png

Apr 18, 2014 ~ Date of Marriage (City Hall - New York, NY USA) (L)(F)(L)

USCIS

Jun 02, 2014 - I -130 package mailed to Chicago Lockbox via USPS (Priority Mail)

Jun 04, 2014 - I -130 package delivered

Jun 05, 2014 - PRIORITY DATE B-)

Jun 08, 2014 - NOA1 (USCIS acceptance confirmation via e-mail)/package routed to VSC

Jun 12, 2014 - NOA1 (hard copy)

Mar 24, 2015 - Transfer Notice (e-mail)

Mar 28, 2015 - Transfer Notice. Case transferred to California Service Center (regular mail)

Mar 31, 2015 - NOA2 (e-mail) Yipppiiiieeeee!!! :dancing::dance:

Apr 04, 2015 - NOA2 (regular mail)

NVC

Apr 27, 2015 - NVC received case

May 12, 2015 - Affidavit of Support (AOS) Fee invoiced

May 15, 2015 - NVC Welcome Letter (regular mail)

May 26, 2015 - DS-261 (Choice of Agent Form) submitted

May 26, 2015 - AOS Fee paid (Staus: In Process)

May 27, 2015 - AOS Fee (Staus: Paid)

Aug 12, 2015 - IV Fee paid (Staus: In Process)

Aug 14, 2015 - IV Fee (Staus: Paid)

Aug 27, 2015 - I-864 EZ filled out

Aug 27, 2015 - DS 260 submitted

Aug 28, 2015 - AOS and IV packages mailed to NVC

Aug 31, 2015 - NVC receives AOS and IV packages

Sep 03, 2015 - NVC confirms they rec'd packages (e-mail)

Link to comment
Share on other sites

@Miss Tams

Again, I think that you do not see the whole picture...

F2A was current till October 1, and then it did retrogress back to September 8 in October. To say it one more time: the F2A category retrogressed in October back to SEP 8. Meaning that the people who filed from SEP8 till OCT 1 (but not including OCT 1) filed while F2A was current. So, now their PD are not current, but they filed while F2A was current. Do you get it now?

The immigration might be processing those applications filed from SEP8 till OCT1 if they have 'free' time.

I am wondering if here is anybody who KNOWS that his-her I-485 is being processing, provided that I-485 was flied between SEP8 OCT1?

Edited by john.smith
Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

I don't think there is an easy way to get that info unless you file for FOIA. I did file FOIA in 2010 for my EB based I485 for a different reason and USCIS sent me a CD of about 170 pages including snap shots of different screens/departments who handled my case with in USCIS. Names of Immigrant officers who looked at my case and even the one who requested for Immigrant Visa from DOS. Do keep in mind that it takes 3-4 months for USCIS to send you the CD based on your FOIA request.

My I485 was preadjudicated after about 3 months of filing(filed in July 2007 fiasco) and was waiting for an immigrant visa number since my PD wasn't current.

You could also take an infopass and enquire but i doubt you will get anything more than "It is in process". One other way would be to check for any "Soft LUD" on your case in the USCIS website after creating a portfolio.

 

 

 

Link to comment
Share on other sites

@Miss Tams

Again, I think that you do not see the whole picture...

F2A was current till October 1, and then it did retrogress back to September 8 in October. To say it one more time: the F2A category retrogressed in October back to SEP 8. Meaning that the people who filed from SEP8 till OCT 1 (but not including OCT 1) filed while F2A was current. So, now their PD are not current, but they filed while F2A was current. Do you get it now?

The immigration might be processing those applications filed from SEP8 till OCT1 if they have 'free' time.

I am wondering if here is anybody who KNOWS that his-her I-485 is being processing, provided that I-485 was flied between SEP8 OCT1?

I do understand what ure saying and I did answer in my previous post. It doesn't matter if the person is adjusting status or going through consular processing. If the PD is not before Sep 8, 2013, they will not get the green card/immigrant visa.

Did it really? No, it did not retrogress, it remained on a September date. Again, USCIS will look at the petition regardless if the PD is current or not. How else will they know unless they look at the file? It has nothing to do with "free time".

This is where I think the confusion comes in. We are no longer in September when the PD was "current". So if someone was able to file to adjust status within that mth and get their green card, good for them!

We are now in November. So, those who filed the I-485 to adjust status on or after Sep 8, 2013 will not get their green cards until their priority dates become current again, that is anything AFTER Sep 8, 2013. They'll just have to wait "in limbo" so to speak. ~~~

:energy:I am the beneficiary :energy:

h5Wpm5.png

event.png

event.png

Apr 18, 2014 ~ Date of Marriage (City Hall - New York, NY USA) (L)(F)(L)

USCIS

Jun 02, 2014 - I -130 package mailed to Chicago Lockbox via USPS (Priority Mail)

Jun 04, 2014 - I -130 package delivered

Jun 05, 2014 - PRIORITY DATE B-)

Jun 08, 2014 - NOA1 (USCIS acceptance confirmation via e-mail)/package routed to VSC

Jun 12, 2014 - NOA1 (hard copy)

Mar 24, 2015 - Transfer Notice (e-mail)

Mar 28, 2015 - Transfer Notice. Case transferred to California Service Center (regular mail)

Mar 31, 2015 - NOA2 (e-mail) Yipppiiiieeeee!!! :dancing::dance:

Apr 04, 2015 - NOA2 (regular mail)

NVC

Apr 27, 2015 - NVC received case

May 12, 2015 - Affidavit of Support (AOS) Fee invoiced

May 15, 2015 - NVC Welcome Letter (regular mail)

May 26, 2015 - DS-261 (Choice of Agent Form) submitted

May 26, 2015 - AOS Fee paid (Staus: In Process)

May 27, 2015 - AOS Fee (Staus: Paid)

Aug 12, 2015 - IV Fee paid (Staus: In Process)

Aug 14, 2015 - IV Fee (Staus: Paid)

Aug 27, 2015 - I-864 EZ filled out

Aug 27, 2015 - DS 260 submitted

Aug 28, 2015 - AOS and IV packages mailed to NVC

Aug 31, 2015 - NVC receives AOS and IV packages

Sep 03, 2015 - NVC confirms they rec'd packages (e-mail)

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

I am wondering if here is anybody who KNOWS that his-her I-485 is being processing, provided that I-485 was flied between SEP8 OCT1?

From another forum i'm aware of few cases who filed I-130 & I-485 concurrently between Sept 8th and Sept 30, 2013.... and whose 485 changed to Testing & Interview status in the past 2 weeks.... I believe one of them even has an interview scheduled on Dec 10th 2013.

My impression is their case will be pre-adjudicated but they might be receiving a green card only in future when the visa numbers might be available with no more administrative processing necessary in future.

09/09/2013 - Concurrent filing of I-130/I-485/I-765/I-131 sent via USPS.

09/11/2013 - Delivered to USCIS Chicago Lockbox

09/16/2013 - Acceptance Confirmation text messages (4) and emails (4).

09/17/2013 - Check cashed.

09/23/2013 - Four I-797C notice of action in mail.

09/23/2013 - I-130, I-765 and I-131 online status showing Initial Review. I-485 showing Acceptance.

09/26/2013 - I-797C for Biometrics notice. Appointment scheduled on 10/10

10/01/2013 - I-485 case status updated to RFE and the RFE notice mailed out.

10/08/2013 - RFE response mailed out.

10/10/2013 - I-485 case status changed to "RFE response review"

10/10/2013 - biometrics completed on scheduled date.

10/29/2013 - EAD card production ordered

11/07/2013 - Received combo card.

11/15/2013 - I-485 case status change to "Testing & Interview"

01/02/2014 - Received notice that interview is scheduled for Feb 3.

02/03/2014 - Interview went well. Now it is a waiting game as our dates are not current.

Waiting to receive atleast an I-130 approval

03/17/2014 - Received txt: I-130 approved.

Link to comment
Share on other sites

Filed: F-2A Visa Country: Haiti
Timeline

whooooooo !!!!!

Hello guys my I just receive an Email that my case was approved now I waiting my NOA2 hard copy on the mail , My pd is Sept 30,2013 and my case was assigned to VSC

I wonder when vb will be current for me

My wife & My 2 daughters Visa Journey

09/21/1999 - Met
02/18/2012 - Johnny left for the US
07/26/2013 - Johnny went visiting
07/29/2013 - Got married in P-au-P
09/23/2013 - I-130 sent
09/30/2013 - PD
09/30/2013 - NOA-1 received in email

10/03/2013 - NOA 1 received in the mail
11/13/2013 - NOA-2 approved (in email)
11/18/2013 - NOA-2 received in snail mail

11/25/2013 - NVC received the case

12/05/2013 - NVC assigned case number

05/22/2015- NVC case completed over the phone

06/01/2015- cc email confirmation

Interview 08-05-2015 7AM Port-au-Prince

06/06/15 Ceac in AP status :cry: (they ask me for joint sponsor)

10/02/15 Ceac changed from AP to Issued (after almost 2 month)

10/07/15 Passport with Visa oh hand :dancing:

10/18/15 Ready to enter in US JFK airport

Thanx a lot for all support from VJ users !!!!!! :idea::idea::idea::idea:

Link to comment
Share on other sites

Filed: F-2A Visa Country: Belarus
Timeline

whooooooo !!!!!

Hello guys my I just receive an Email that my case was approved now I waiting my NOA2 hard copy on the mail , My pd is Sept 30,2013 and my case was assigned to VSC

I wonder when vb will be current for me

CONGRATS!!!!

10/06/2007 - Met

07/14/2010 - Tiger left for the US

04/27/2012 - Tiger came visiting

10/13/2012 - Visited Tiger in Chicago

09/19/2013 - My second visit to Chicago

10/04/2013 - Got married in Mt.Pleasant, IA

05/18/2014 - Tiger came visiting again (YAY!!!)

USCIS Stage

10/24/2013 - I-130 sent

10/28/2013 - PD

10/29/2013 - NOA-1 received in email

10/30/2013 - Check cashed

10/31/2013 - NOA-1 hard copy received

12/04/2013 - NOA-2 approved (in email)

12/09/2013 - NOA-2 received in snail mail

NVC Stage

12/16/2013 - NVC received the case

01/09/2014 - Got my case and invoice ID numbers

02/12/2015 - NVC started generating forms and invoices for our case (according to a nice NVC rep)

02/13/2015 - DS-261 available and filled out

02/13/2015 - Got an email with NVC Welcome letter and AOS Invoice

02/13/2015 - Paid AOS Fee

02/18/2015 - AOS shows PAID on ceac

02/22/2015 - AOS and civil documents sent off
02/23/2015 - DS-261 reviewed and IV Fee invoice received

02/24/2015 - IV Fee paid

02/25/2015 - Documents delivered to the NVC (scan date)

02/25/2015 - DS-260 submitted

03/30/2015 - Case Complete by phone

04/06/2015 - Case Complete email received

06/03/2015 - Got my interview scheduled for July, 6

Link to comment
Share on other sites

Filed: F-2A Visa Country: Philippines
Timeline

Hey guys! Csc approved fast, my pd is sept 26,2013, got approved oct 21,2013.. Lets wait and pray harder for the vb nxt month..

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×