I just talked to USCIS and operator told me that VSC is working on I-130's from January 16. Wondering if anyone else got similar dates when they called USCIS?

Thanks

02/08/12 - I-130 sent to Chicago Lockbox.

02/09/12 - NOA1 received and processing at Vermont.

07/02/12 - NOA2 announced on status check.

07/09/12 - NVC received case.

07/27/12 - NVC Case Number and IIN Issued.

07/27/12 - Sent DS-3032 via email.

07/31/12 - AOS bill received via email, paid online.

08/01/12 - AOS marked paid, Mailed AOS packet overnight.

08/06/12 - Assigned as Agent, IV Fee bill received via email, paid online.

08/07/12 - IV Fee marked paid, Mailed IV packet overnight.

08/07/12 - AOS accepted.

08/13/12 - Case completed

09/14/12 - Assigned Interview date.

10/18/12 - Interview Date

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

I just talked to USCIS and operator told me that VSC is working on I-130's from January 16. Wondering if anyone else got similar dates when they called USCIS?

Thanks

i got the same info today.

"Family time is very precious and you should cherish every moment of it."

01/20/12 - I-130 sent to Chicago Lockbox.

01/26/12 - NOA1 received and processing at Vermont.

06/28/12 - NOA2 announced on status check.

06/29/12 - NVC received case learned on 07/2/12.

06/30/12 - Hard copy NOA2 received.

07/09/12 - NVC Casefile Number and IIN Issued.

07/16/12 - Receive and Sent DS-3032 via email.

07/17/12 - Mailed DS-3032 via mail, AOS bill received via email, paid online, Optin email sent.

07/18/12 - Optin accepted and new case number, AOS marked paid, emailed AOS packet.

07/24/12 - Assigned as Agent, IV Fee bill received via email, paid online.

07/25/12 - IV Fee marked paid, emailed IV packet.

07/31/12 - Emailed GZO Supplemental Packet 3.

08/02/12 - Case completed and commenced final review.

08/03/12 - Shipped all copies of forms/letters/documents to my wife - arriving on 8/9/12.

08/06/12 - Case completed final review.

08/09/12 - Appointment letter received via email interview date set 9/6/12.

08/14/12 - Medical exam done.

08/15/12 - Medical exam results all normal.

09/06/12 - Submitted required documents at the embassy and interview set next day at 0730.

09/07/12 - Visa approved, click here for review http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=10401 .

09/14/12 - Visa received on hand!

10/07/12 - Arrived at NYC! click here for review http://www.visajourney.com/reviews/view-poe-reviews.php?entry=15293

10/20/12 - Received welcome letter from USCIS.

10/25/12 - Green Card received!

"Nothing is more difficult than the art of maneuvering for advantageous positions." - Sun-Tzu

04/27/13 - Submitted DS-160 online for parent-in-laws and sister-in-law.

05/01/13 - Paid DS-160 or MRV Fee Payments on CGI Stanley.

05/03/13 - Made appointment for 05/16/13 on CGI Stanley.

05/16/13 - Arrived at GUZ and impromptu notice on the front it was closed.

05/30/13 - B2 visa interview passed! Read review here http://www.visajourney.com/forums/topic/433263-b2-visa-was-approved-for-parentinlaw/ <p>

"Good ideas are not adopted automatically. They must be driven into practice with courageous patience." - ADM Hyman G. Rickover

08/08/14 - Mailed I-175 application.

08/11/14 - I-175 arrived at VSC.

08/18/14 - Received NOA1 with date 08/12/14.

08/27/14 - Received biometrics appointment for 09/09/14.

02/27/15 - GC in production from email notification.

03/02/15 - Received NOA2 with approval dated 02/25/15.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

i got the same info today.

January 16 just seems to good to believe in because lot of VJ members are still not approved from Early Jan.

02/08/12 - I-130 sent to Chicago Lockbox.

02/09/12 - NOA1 received and processing at Vermont.

07/02/12 - NOA2 announced on status check.

07/09/12 - NVC received case.

07/27/12 - NVC Case Number and IIN Issued.

07/27/12 - Sent DS-3032 via email.

07/31/12 - AOS bill received via email, paid online.

08/01/12 - AOS marked paid, Mailed AOS packet overnight.

08/06/12 - Assigned as Agent, IV Fee bill received via email, paid online.

08/07/12 - IV Fee marked paid, Mailed IV packet overnight.

08/07/12 - AOS accepted.

08/13/12 - Case completed

09/14/12 - Assigned Interview date.

10/18/12 - Interview Date

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

it could be also they forgot to update their timeline...

"Family time is very precious and you should cherish every moment of it."

01/20/12 - I-130 sent to Chicago Lockbox.

01/26/12 - NOA1 received and processing at Vermont.

06/28/12 - NOA2 announced on status check.

06/29/12 - NVC received case learned on 07/2/12.

06/30/12 - Hard copy NOA2 received.

07/09/12 - NVC Casefile Number and IIN Issued.

07/16/12 - Receive and Sent DS-3032 via email.

07/17/12 - Mailed DS-3032 via mail, AOS bill received via email, paid online, Optin email sent.

07/18/12 - Optin accepted and new case number, AOS marked paid, emailed AOS packet.

07/24/12 - Assigned as Agent, IV Fee bill received via email, paid online.

07/25/12 - IV Fee marked paid, emailed IV packet.

07/31/12 - Emailed GZO Supplemental Packet 3.

08/02/12 - Case completed and commenced final review.

08/03/12 - Shipped all copies of forms/letters/documents to my wife - arriving on 8/9/12.

08/06/12 - Case completed final review.

08/09/12 - Appointment letter received via email interview date set 9/6/12.

08/14/12 - Medical exam done.

08/15/12 - Medical exam results all normal.

09/06/12 - Submitted required documents at the embassy and interview set next day at 0730.

09/07/12 - Visa approved, click here for review http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=10401 .

09/14/12 - Visa received on hand!

10/07/12 - Arrived at NYC! click here for review http://www.visajourney.com/reviews/view-poe-reviews.php?entry=15293

10/20/12 - Received welcome letter from USCIS.

10/25/12 - Green Card received!

"Nothing is more difficult than the art of maneuvering for advantageous positions." - Sun-Tzu

04/27/13 - Submitted DS-160 online for parent-in-laws and sister-in-law.

05/01/13 - Paid DS-160 or MRV Fee Payments on CGI Stanley.

05/03/13 - Made appointment for 05/16/13 on CGI Stanley.

05/16/13 - Arrived at GUZ and impromptu notice on the front it was closed.

05/30/13 - B2 visa interview passed! Read review here http://www.visajourney.com/forums/topic/433263-b2-visa-was-approved-for-parentinlaw/ <p>

"Good ideas are not adopted automatically. They must be driven into practice with courageous patience." - ADM Hyman G. Rickover

08/08/14 - Mailed I-175 application.

08/11/14 - I-175 arrived at VSC.

08/18/14 - Received NOA1 with date 08/12/14.

08/27/14 - Received biometrics appointment for 09/09/14.

02/27/15 - GC in production from email notification.

03/02/15 - Received NOA2 with approval dated 02/25/15.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

seems like vsc is still processing files from september 1, 2011 - based on previous information. i think they are sugar coating their reports. i hope i am wrong on this statement.

Edited by unlockingsky

"Family time is very precious and you should cherish every moment of it."

01/20/12 - I-130 sent to Chicago Lockbox.

01/26/12 - NOA1 received and processing at Vermont.

06/28/12 - NOA2 announced on status check.

06/29/12 - NVC received case learned on 07/2/12.

06/30/12 - Hard copy NOA2 received.

07/09/12 - NVC Casefile Number and IIN Issued.

07/16/12 - Receive and Sent DS-3032 via email.

07/17/12 - Mailed DS-3032 via mail, AOS bill received via email, paid online, Optin email sent.

07/18/12 - Optin accepted and new case number, AOS marked paid, emailed AOS packet.

07/24/12 - Assigned as Agent, IV Fee bill received via email, paid online.

07/25/12 - IV Fee marked paid, emailed IV packet.

07/31/12 - Emailed GZO Supplemental Packet 3.

08/02/12 - Case completed and commenced final review.

08/03/12 - Shipped all copies of forms/letters/documents to my wife - arriving on 8/9/12.

08/06/12 - Case completed final review.

08/09/12 - Appointment letter received via email interview date set 9/6/12.

08/14/12 - Medical exam done.

08/15/12 - Medical exam results all normal.

09/06/12 - Submitted required documents at the embassy and interview set next day at 0730.

09/07/12 - Visa approved, click here for review http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=10401 .

09/14/12 - Visa received on hand!

10/07/12 - Arrived at NYC! click here for review http://www.visajourney.com/reviews/view-poe-reviews.php?entry=15293

10/20/12 - Received welcome letter from USCIS.

10/25/12 - Green Card received!

"Nothing is more difficult than the art of maneuvering for advantageous positions." - Sun-Tzu

04/27/13 - Submitted DS-160 online for parent-in-laws and sister-in-law.

05/01/13 - Paid DS-160 or MRV Fee Payments on CGI Stanley.

05/03/13 - Made appointment for 05/16/13 on CGI Stanley.

05/16/13 - Arrived at GUZ and impromptu notice on the front it was closed.

05/30/13 - B2 visa interview passed! Read review here http://www.visajourney.com/forums/topic/433263-b2-visa-was-approved-for-parentinlaw/ <p>

"Good ideas are not adopted automatically. They must be driven into practice with courageous patience." - ADM Hyman G. Rickover

08/08/14 - Mailed I-175 application.

08/11/14 - I-175 arrived at VSC.

08/18/14 - Received NOA1 with date 08/12/14.

08/27/14 - Received biometrics appointment for 09/09/14.

02/27/15 - GC in production from email notification.

03/02/15 - Received NOA2 with approval dated 02/25/15.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

yeah i have 16 sept 2011 as priority date and i am still waiting for my Approval for my I-130

seems like they obviously f*ed up on there business process..

you should request to get it expedited because it is already out of normal processing time.

"Family time is very precious and you should cherish every moment of it."

01/20/12 - I-130 sent to Chicago Lockbox.

01/26/12 - NOA1 received and processing at Vermont.

06/28/12 - NOA2 announced on status check.

06/29/12 - NVC received case learned on 07/2/12.

06/30/12 - Hard copy NOA2 received.

07/09/12 - NVC Casefile Number and IIN Issued.

07/16/12 - Receive and Sent DS-3032 via email.

07/17/12 - Mailed DS-3032 via mail, AOS bill received via email, paid online, Optin email sent.

07/18/12 - Optin accepted and new case number, AOS marked paid, emailed AOS packet.

07/24/12 - Assigned as Agent, IV Fee bill received via email, paid online.

07/25/12 - IV Fee marked paid, emailed IV packet.

07/31/12 - Emailed GZO Supplemental Packet 3.

08/02/12 - Case completed and commenced final review.

08/03/12 - Shipped all copies of forms/letters/documents to my wife - arriving on 8/9/12.

08/06/12 - Case completed final review.

08/09/12 - Appointment letter received via email interview date set 9/6/12.

08/14/12 - Medical exam done.

08/15/12 - Medical exam results all normal.

09/06/12 - Submitted required documents at the embassy and interview set next day at 0730.

09/07/12 - Visa approved, click here for review http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=10401 .

09/14/12 - Visa received on hand!

10/07/12 - Arrived at NYC! click here for review http://www.visajourney.com/reviews/view-poe-reviews.php?entry=15293

10/20/12 - Received welcome letter from USCIS.

10/25/12 - Green Card received!

"Nothing is more difficult than the art of maneuvering for advantageous positions." - Sun-Tzu

04/27/13 - Submitted DS-160 online for parent-in-laws and sister-in-law.

05/01/13 - Paid DS-160 or MRV Fee Payments on CGI Stanley.

05/03/13 - Made appointment for 05/16/13 on CGI Stanley.

05/16/13 - Arrived at GUZ and impromptu notice on the front it was closed.

05/30/13 - B2 visa interview passed! Read review here http://www.visajourney.com/forums/topic/433263-b2-visa-was-approved-for-parentinlaw/ <p>

"Good ideas are not adopted automatically. They must be driven into practice with courageous patience." - ADM Hyman G. Rickover

08/08/14 - Mailed I-175 application.

08/11/14 - I-175 arrived at VSC.

08/18/14 - Received NOA1 with date 08/12/14.

08/27/14 - Received biometrics appointment for 09/09/14.

02/27/15 - GC in production from email notification.

03/02/15 - Received NOA2 with approval dated 02/25/15.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Iraq
Timeline

At the risk of ticking some people off I'm going to brooch this subject. I've been watching the Vermont Center timelines, and from what I'm seeing they receive many many more K-1 visas than IR1-CR1 visa petitions. Ok, maybe I'm crazy and I really don't know their processing protocols but... they are processing and approving more K-1's than they are marriage visas. This just simply doesn't seem fair to me. They should take a certain number of K1's and match up the same number of marriage visas and work those cases together. Maybe I'm not expressing this clearly...but my point is that the proportion of K1's to marriage visas being approved is OFF...way off. Thoughts anyone?

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

maybe marriage visas are easier to approve because of less work? and k1 visa require a lot of time to review evidence etc?

i am just guessing here.. furthermore if your spouse is from a 'high risk' country, your processing time is much longer...

"Family time is very precious and you should cherish every moment of it."

01/20/12 - I-130 sent to Chicago Lockbox.

01/26/12 - NOA1 received and processing at Vermont.

06/28/12 - NOA2 announced on status check.

06/29/12 - NVC received case learned on 07/2/12.

06/30/12 - Hard copy NOA2 received.

07/09/12 - NVC Casefile Number and IIN Issued.

07/16/12 - Receive and Sent DS-3032 via email.

07/17/12 - Mailed DS-3032 via mail, AOS bill received via email, paid online, Optin email sent.

07/18/12 - Optin accepted and new case number, AOS marked paid, emailed AOS packet.

07/24/12 - Assigned as Agent, IV Fee bill received via email, paid online.

07/25/12 - IV Fee marked paid, emailed IV packet.

07/31/12 - Emailed GZO Supplemental Packet 3.

08/02/12 - Case completed and commenced final review.

08/03/12 - Shipped all copies of forms/letters/documents to my wife - arriving on 8/9/12.

08/06/12 - Case completed final review.

08/09/12 - Appointment letter received via email interview date set 9/6/12.

08/14/12 - Medical exam done.

08/15/12 - Medical exam results all normal.

09/06/12 - Submitted required documents at the embassy and interview set next day at 0730.

09/07/12 - Visa approved, click here for review http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=10401 .

09/14/12 - Visa received on hand!

10/07/12 - Arrived at NYC! click here for review http://www.visajourney.com/reviews/view-poe-reviews.php?entry=15293

10/20/12 - Received welcome letter from USCIS.

10/25/12 - Green Card received!

"Nothing is more difficult than the art of maneuvering for advantageous positions." - Sun-Tzu

04/27/13 - Submitted DS-160 online for parent-in-laws and sister-in-law.

05/01/13 - Paid DS-160 or MRV Fee Payments on CGI Stanley.

05/03/13 - Made appointment for 05/16/13 on CGI Stanley.

05/16/13 - Arrived at GUZ and impromptu notice on the front it was closed.

05/30/13 - B2 visa interview passed! Read review here http://www.visajourney.com/forums/topic/433263-b2-visa-was-approved-for-parentinlaw/ <p>

"Good ideas are not adopted automatically. They must be driven into practice with courageous patience." - ADM Hyman G. Rickover

08/08/14 - Mailed I-175 application.

08/11/14 - I-175 arrived at VSC.

08/18/14 - Received NOA1 with date 08/12/14.

08/27/14 - Received biometrics appointment for 09/09/14.

02/27/15 - GC in production from email notification.

03/02/15 - Received NOA2 with approval dated 02/25/15.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Iraq
Timeline

maybe marriage visas are easier to approve because of less work? and k1 visa require a lot of time to review evidence etc?

i am just guessing here.. furthermore if your spouse is from a 'high risk' country, your processing time is much longer...

I was kind of afraid I wasn't being clear with my comment. What I mean is... it appears it's taking LESS time to process the K1's in the service center. The amount of approvals for K1 is disproportionate to the number of IR1/CR1 approvals. I was actually referring to Igor's List on VJ. If you notice you put in the fiance petition/K1 visa option and look at the amount of approvals for May 2012 then do the same for the I-130/marriage visa option. See the difference? Seems weird to me. There are many more approvals because there seems to be more petitions submitted, but somehow the seems unfair to me. :unsure: And yes, I expect I'll have a bit longer wait than most, unfortunately.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

i think you are flawed there to compare k1 to ir1/cr1 on vj. because this is a self-user data input and you are looking at the vj population and not as everyone in uscis population. it is also plague with people who input the date on the wrong field or just not updating it anymore.

i think you will get somewhat accurate results by comparing the processing times on the uscis website. what i find is so f*ed up is that the business visa get much better priority than family visa.

"Family time is very precious and you should cherish every moment of it."

01/20/12 - I-130 sent to Chicago Lockbox.

01/26/12 - NOA1 received and processing at Vermont.

06/28/12 - NOA2 announced on status check.

06/29/12 - NVC received case learned on 07/2/12.

06/30/12 - Hard copy NOA2 received.

07/09/12 - NVC Casefile Number and IIN Issued.

07/16/12 - Receive and Sent DS-3032 via email.

07/17/12 - Mailed DS-3032 via mail, AOS bill received via email, paid online, Optin email sent.

07/18/12 - Optin accepted and new case number, AOS marked paid, emailed AOS packet.

07/24/12 - Assigned as Agent, IV Fee bill received via email, paid online.

07/25/12 - IV Fee marked paid, emailed IV packet.

07/31/12 - Emailed GZO Supplemental Packet 3.

08/02/12 - Case completed and commenced final review.

08/03/12 - Shipped all copies of forms/letters/documents to my wife - arriving on 8/9/12.

08/06/12 - Case completed final review.

08/09/12 - Appointment letter received via email interview date set 9/6/12.

08/14/12 - Medical exam done.

08/15/12 - Medical exam results all normal.

09/06/12 - Submitted required documents at the embassy and interview set next day at 0730.

09/07/12 - Visa approved, click here for review http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=10401 .

09/14/12 - Visa received on hand!

10/07/12 - Arrived at NYC! click here for review http://www.visajourney.com/reviews/view-poe-reviews.php?entry=15293

10/20/12 - Received welcome letter from USCIS.

10/25/12 - Green Card received!

"Nothing is more difficult than the art of maneuvering for advantageous positions." - Sun-Tzu

04/27/13 - Submitted DS-160 online for parent-in-laws and sister-in-law.

05/01/13 - Paid DS-160 or MRV Fee Payments on CGI Stanley.

05/03/13 - Made appointment for 05/16/13 on CGI Stanley.

05/16/13 - Arrived at GUZ and impromptu notice on the front it was closed.

05/30/13 - B2 visa interview passed! Read review here http://www.visajourney.com/forums/topic/433263-b2-visa-was-approved-for-parentinlaw/ <p>

"Good ideas are not adopted automatically. They must be driven into practice with courageous patience." - ADM Hyman G. Rickover

08/08/14 - Mailed I-175 application.

08/11/14 - I-175 arrived at VSC.

08/18/14 - Received NOA1 with date 08/12/14.

08/27/14 - Received biometrics appointment for 09/09/14.

02/27/15 - GC in production from email notification.

03/02/15 - Received NOA2 with approval dated 02/25/15.

Link to comment
Share on other sites

Filed: Timeline

i got the same info today.

I was told on May 1st that VSC was processing Jan 16th, 2012 and that since my NOA1 is Jan 12th, 2012 they submitted a service request to find out what is going on.... I recieved an e-mail from the service request stating that they are "sorry about the misinformation causes by the posted times" but they are currently processing NOVEMBER 2011!

I am beyond frustrated with their system.

I've been told numerous different dates when I call and now their e-mail claims to be working on November (2 more months at least til they even get to Jan? How is that possible when they are telling every caller that they are half way into Jan?!?!)

Also--- there are a good amount of Dec and Jan cases already approved from VSC and even a handful of FEB and MARCH cases. They are so incredibly unorganized that it makes my blood boil because they tell people blatant lies.

I havent seen my husband in months, and 3 times they told us we were within a week of approval just to get knocked back down again. It just doesn't seem fair to build up false hope like that... I can't handle that emotionally when already in a long, stressful situation!

Edited by xxJaym

Met Through Mutual Friends: Early March 2009

Began dating: June 24th, 2010

Met in Manchester, England: October 20, 2010 to Oct 25, 2010

"Officially" became a couple: November 25, 2010

New Years together in England: Dec 26, 2010 to Jan 2, 2011

Visit to meet my family: February 19, 2011 to February 26, 2011

Visit to spend Easter/Spring Break together: April 16, 2011 to April 30, 2011

Spent the summer together in New York: June 23, 2011 to August 1, 2011

Came to visit just after my birthday: October 13, 2011 to October 23, 2011

Officially Announced Our Engagement: November 30, 2011

Trip to NY for New Years: December 27, 2011 to January 9, 2012

Wedding Day: January 4th, 2012

Trip to England & Italy for Valentine's Day: February 10, 2012 to February 20, 2012

Visit to NY for our 2 year dating anniversary: June 20th, 2012 to July 4th, 2012

Timeline

USCIS

01/08/2012: I-130 Sent from NY

01/11/2012: USPS Delivery Confirmation

01/12/2012: NOA1 E-mail & Text

XX/XX/2012: NOA2 E-mail & Text(STILL waitinggg... Ahhh!)

NVC

XX/XX/2012: NVC received

XX/XX/2012: Case number/IIN

XX/XX/2012: DS-3032 sent

XX/XX/2012: DS-3032 accepted

XX/XX/2012: AOS Bill PAID

XX/XX/2012: AOS Package sent

XX/XX/2012: IV Bill PAID

XX/XX/2012: IV Package sent

XX/XX/2012: Case complete at NVC

XX/XX/2012: Interview scheduled (Interview Date: XX/XX/2012)

US Embassy London

XX/XX/2012: Embassy received

XX/XX/2012: Medical

XX/XX/2012: Interview

XX/XX/2012: Visa

XX/XX/2012: POE Boston

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

I was told on May 1st that VSC was processing Jan 16th, 2012 and that since my NOA1 is Jan 12th, 2012 they submitted a service request to find out what is going on.... I recieved an e-mail from the service request stating that they are "sorry about the misinformation causes by the posted times" but they are currently processing NOVEMBER 2011!

...........

Something isn't right here because they can't submit a service request for Jan12 until Jun12. The 5 months processing time hasn't reach there yet. And there computer won't allow it to submit a service request until the 5 months is over.

I am just baffled how you got them to submit a service request through and how they did it.

"Family time is very precious and you should cherish every moment of it."

01/20/12 - I-130 sent to Chicago Lockbox.

01/26/12 - NOA1 received and processing at Vermont.

06/28/12 - NOA2 announced on status check.

06/29/12 - NVC received case learned on 07/2/12.

06/30/12 - Hard copy NOA2 received.

07/09/12 - NVC Casefile Number and IIN Issued.

07/16/12 - Receive and Sent DS-3032 via email.

07/17/12 - Mailed DS-3032 via mail, AOS bill received via email, paid online, Optin email sent.

07/18/12 - Optin accepted and new case number, AOS marked paid, emailed AOS packet.

07/24/12 - Assigned as Agent, IV Fee bill received via email, paid online.

07/25/12 - IV Fee marked paid, emailed IV packet.

07/31/12 - Emailed GZO Supplemental Packet 3.

08/02/12 - Case completed and commenced final review.

08/03/12 - Shipped all copies of forms/letters/documents to my wife - arriving on 8/9/12.

08/06/12 - Case completed final review.

08/09/12 - Appointment letter received via email interview date set 9/6/12.

08/14/12 - Medical exam done.

08/15/12 - Medical exam results all normal.

09/06/12 - Submitted required documents at the embassy and interview set next day at 0730.

09/07/12 - Visa approved, click here for review http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=10401 .

09/14/12 - Visa received on hand!

10/07/12 - Arrived at NYC! click here for review http://www.visajourney.com/reviews/view-poe-reviews.php?entry=15293

10/20/12 - Received welcome letter from USCIS.

10/25/12 - Green Card received!

"Nothing is more difficult than the art of maneuvering for advantageous positions." - Sun-Tzu

04/27/13 - Submitted DS-160 online for parent-in-laws and sister-in-law.

05/01/13 - Paid DS-160 or MRV Fee Payments on CGI Stanley.

05/03/13 - Made appointment for 05/16/13 on CGI Stanley.

05/16/13 - Arrived at GUZ and impromptu notice on the front it was closed.

05/30/13 - B2 visa interview passed! Read review here http://www.visajourney.com/forums/topic/433263-b2-visa-was-approved-for-parentinlaw/ <p>

"Good ideas are not adopted automatically. They must be driven into practice with courageous patience." - ADM Hyman G. Rickover

08/08/14 - Mailed I-175 application.

08/11/14 - I-175 arrived at VSC.

08/18/14 - Received NOA1 with date 08/12/14.

08/27/14 - Received biometrics appointment for 09/09/14.

02/27/15 - GC in production from email notification.

03/02/15 - Received NOA2 with approval dated 02/25/15.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...