how long should we get notice from NVC after giving emails?ours taking so long....we haven't heard any from NVC yet

From lookin at some recent timelines it looks like NVC is getting bogged down by all the recent approvals... From what I can see it is like 10 - 15 days to get NVC#...

14 days on the front end from NOA2 to NVCcase #

From there the petitioners stuff (AOS fee bill, payment, acceptance of AOS package) is about 14-18 days

The benificerary stuff (sned in 3032, acceptance of 3032, bill for IV, payment of IV, and acceptance of 230) is taking about 21-28 days

So total NVC (if you keep up with your case online and through the AVR, keep checking the website for generation of the bills, have ALL your paperwork ready and documents ready to go, and file your e-mail addressed and NO RFE's (in other words, learn the shortcuts available on this site) the total time is around 36 - 45 days...

Of course some people are taking longer... some shorter... But keep on top of your case by checking regularly and most importantly HAVE YOUR PAPERWORK READY!!!!

Best of luck to everyone!

hi cristeen,

it's been 13 days from the day that our case number was assigned...i saw some just got their NVC notice for ds3032 and AOS bill in just 3 days after having the case number.... :unsure:

why ours taking so long???

[/size][/color]

7jrbir.png

TIMELINE I-130

June 29, 2009 - sent packet I-130

July 9, 2009 - received NOA1 (thanks God)

Sept. 9, 2009 - received approval email from USCIS thru CRIS

Sept. 14, 2009 - NOA2 hardcopy received by husband

Sept. 18, 2009 - case number assigned (NVC process starts)

Nov. 4, 2009 - CASE COMPLETE @NVC!

Nov. 13, 2009 - interview date assigned by NVC

DEC. 10, 2009 AT 6:30AM

re scheduled DECEMBER 1, 2009- INTERVIEW - white slip (passport and medical results from st. luke

Dec 14, 2009 - VISA received

Dec 21, 2009 - USA arrival (POE - San francisco)

Jan. 6, 2010 - SSN received

Jan. 7, 2010 - 2 years GC received

THANKS GOD AND MOTHER MARY FOR ALL THE GUIDANCE.

Link to comment
Share on other sites

  • Replies 2.9k
  • Created
  • Last Reply

Top Posters In This Topic

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
IT'S OFFICIAL!!!! CASE COMPLETE!!!! :dance::dance::dance: Just spoke with an operator which gave me the news!!! Now I'm just waitin on the Interview!!! Now that my processing is out of the way, we can get some of ya'll moving along and get your cases completed too!!!!

Congratulations!! I'm sure u'll have the interview date soon as well :)

Service Center : California Service Center

Consulate : Montreal, Canada

I-130 Journey

I-130 Sent : 2009-06-09

I-130 NOA1 : 2009-06-12

I-130 Approved : 2009-08-26

NOA2 Hardcopy : 2009-08-31

NVC Journey

NVC Received : 2009-09-08

Received DS-3032 / I-864 Bill : 2009-09-14

Pay I-864 Bill 2009-09-14

Return Completed DS-3032 : 2009-09-15

Return Completed I-864 : 2009-09-17

Return Completed DS-230 : 2009-10-21

Login Failed : 2009-11-02

Case Complete: 2009-11-03

Medical: 2010-02-10

Interview: 2010-02-24!!!! Yay!!!! APPROVED

Port of Entry: Blue Water Bridge, Michigan: 2010-03-14

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Another Question, the AOS payment it is now showing as "PAID" but the document sheet was poorly scanned into the system and I can not make any sense of the instructions.

Do I download the I-864 EZ and the cover sheet and mail it to the address provided ?

Or do I call and talk to an operator before I send it in?

Here what the cover sheet looks like:

DOCUMENT COVER SHEET

After printing this cover sheet, the next immigration process is for the Petitioner to

Affidavit of Support Processing Instructions. instructions has been provided for you on the

You can also access the instructions www.ImmigrantVisas.state.gov

You MUST RETURN THIS COVER SHEET Petitioner's completed forms and supporting

Failure to do this may result in a delay in processing. attach this page to the front of the documents

and mail to:

National Visa Center Attn. CMR AOS

32 Rochester Avenue Portsmouth, NH 03801­2909

TIA

Did it work for you yet? I was able to print the document properly today, possibly a glitch on NVC site.

Service Center : California Service Center

Consulate : Montreal, Canada

I-130 Journey

I-130 Sent : 2009-06-09

I-130 NOA1 : 2009-06-12

I-130 Approved : 2009-08-26

NOA2 Hardcopy : 2009-08-31

NVC Journey

NVC Received : 2009-09-08

Received DS-3032 / I-864 Bill : 2009-09-14

Pay I-864 Bill 2009-09-14

Return Completed DS-3032 : 2009-09-15

Return Completed I-864 : 2009-09-17

Return Completed DS-230 : 2009-10-21

Login Failed : 2009-11-02

Case Complete: 2009-11-03

Medical: 2010-02-10

Interview: 2010-02-24!!!! Yay!!!! APPROVED

Port of Entry: Blue Water Bridge, Michigan: 2010-03-14

Link to comment
Share on other sites

CONGRATULAAAAAAATIOOOOOOOOONS!!!!!!! :dance::dance::dance:

[/size][/color]

7jrbir.png

TIMELINE I-130

June 29, 2009 - sent packet I-130

July 9, 2009 - received NOA1 (thanks God)

Sept. 9, 2009 - received approval email from USCIS thru CRIS

Sept. 14, 2009 - NOA2 hardcopy received by husband

Sept. 18, 2009 - case number assigned (NVC process starts)

Nov. 4, 2009 - CASE COMPLETE @NVC!

Nov. 13, 2009 - interview date assigned by NVC

DEC. 10, 2009 AT 6:30AM

re scheduled DECEMBER 1, 2009- INTERVIEW - white slip (passport and medical results from st. luke

Dec 14, 2009 - VISA received

Dec 21, 2009 - USA arrival (POE - San francisco)

Jan. 6, 2010 - SSN received

Jan. 7, 2010 - 2 years GC received

THANKS GOD AND MOTHER MARY FOR ALL THE GUIDANCE.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Italy
Timeline
how long should we get notice from NVC after giving emails?ours taking so long....we haven't heard any from NVC yet

From lookin at some recent timelines it looks like NVC is getting bogged down by all the recent approvals... From what I can see it is like 10 - 15 days to get NVC#...

14 days on the front end from NOA2 to NVCcase #

From there the petitioners stuff (AOS fee bill, payment, acceptance of AOS package) is about 14-18 days

The benificerary stuff (sned in 3032, acceptance of 3032, bill for IV, payment of IV, and acceptance of 230) is taking about 21-28 days

So total NVC (if you keep up with your case online and through the AVR, keep checking the website for generation of the bills, have ALL your paperwork ready and documents ready to go, and file your e-mail addressed and NO RFE's (in other words, learn the shortcuts available on this site) the total time is around 36 - 45 days...

Of course some people are taking longer... some shorter... But keep on top of your case by checking regularly and most importantly HAVE YOUR PAPERWORK READY!!!!

Best of luck to everyone!

hi cristeen,

it's been 13 days from the day that our case number was assigned...i saw some just got their NVC notice for ds3032 and AOS bill in just 3 days after having the case number.... :unsure:

why ours taking so long???

In the past 2-3 weeks there has been a TON of USCIS approvals... it seems to be taking longer for NVC now??? Hopefully you will get yours soon... Call around noon and if not, I usually call after 10 PM when their system updates.... Good luck, you should get good news soon... use this time to GET YOUR PAPERWORK TOGETHER!!!

10/14/2000 - Met Aboard a Cruise ship

06/14/2003 - Married Savona Italy

I-130

03/21/2009 - I-130 Mailed to Chicago lockbox

11-30-09: GOT GREEN CARD in mail!!!!!!

Citizenship Process;

1/11/2013: Mailed N400 to Dallas Texas

3/11/2013: interview.. Approved

4/4/2013. : Oath! Now a U.S. citizen!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Iran
Timeline
IT'S OFFICIAL!!!! CASE COMPLETE!!!! :dance::dance::dance: Just spoke with an operator which gave me the news!!! Now I'm just waitin on the Interview!!! Now that my processing is out of the way, we can get some of ya'll moving along and get your cases completed too!!!!

Congratulations!!!! :dance:

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Pakistan
Timeline
Sigh. I'm beginning to think I should mail the paper DS-3032. It's been 10 full days now, and I'm just getting tired of waiting for something to happen. I seriously don't understand why this form is even necessary. It's just to establish who they should send further forms to--something that is EASILY communicable over the phone in around 2 seconds.

dont be worried they take 15 days to accept that , that is normal now a days so wait a little more , even mine was accepted after fifteen days

USCIS JOURNEY

Service Center : California Service Center

Consulate : Islamabad, Pakistan

Marriage : 2009-03-21

I-130 Sent : 2009-05-28

I-130 NOA1 : 2009-06-03

I-130 Approved : 2009-08-25 ALHAMDULILLAH ALLAH IS GREATEST

I-130 NOA2 hard copy: 2009-08-29

NVC JOURNEY

NVC Received/case number assigned : 2009-09-04

Received DS-3032 / I-864 Bill : 2009-09-11

Pay I-864 Bill 2009-09-11 (online)

Receive I-864 Package : 2009-09-14

Return Completed I-864 : 2009-09-15

Return Completed DS-3032 : 2009-09-12 (by email)

DS-3032 accepted : 2009-09-26

Receive IV Bill : 2009-09-26

Pay IV Bill : 2009-09-26

Receive Instruction Package : 2009-09-29

Login Failed : 2009-10-26

Case Completed at NVC : 2009-10-27

NVC Left : 2009-10-28

Interview date : 2009-12-16 APPROVED ALHAMDULILLAH

Visa Received : 2009-12-24

Port of Entry (Houston):2010-01-28 VerySmooth ALHAMDULILLAH

Welcome notice arrived:2010-02-16

Green Card Arrived : 2010-02-25

Removal of Conditions

I-751 Package sent to VSC : 2011-12-03

NOA1 received : 2011-12-23

Link to comment
Share on other sites

Filed: IR-5 Country: Philippines
Timeline

hey guys. looks like we barely just made it to this thread. we got assigned our case number today :)

955jbsadc6.png

american.gif philippines.gif

Visa Journey

08/01/2009 - Sent I-130 package

09/18/2009 - I-130 approved

09/30/2009 - Case number assigned

12/17/2009 - Failed log in / Case completed YES!!

02/03/2010 - VISA interview at 830am -- VISA APPROVED

03/06/2010 - POE San Francisco via PAL

04/17/2010 - GC and SSN in the mail

ROC

01/06/2012 - Sent I-751 package to CSC

01/09/2012 - I-751 delivered at 11:12am / Date of NOA1

01/12/2012 - Check cashed

01/14/2012 - Received NOA1 hard copy

01/20/2012 - Date of ASC Appointment letter

01/25/2012 - Received ASC Appointment letter hard copy

02/07/2012 - Biometrics done

03/06/2012 - CR1 expiration

06/13/2012 - Date ROC approved

06/15/2012 - Ordered new card production

06/19/2012 - USCIS mailed the new card

06/21/2012 - Got approval letter and my 10 year GC in the mail (GC expires 06/15/2022)

N-400

12/09/2014 - Sent N-400 package

12/13/2014 - N-400 delivered at 10:13 am

12/15/2014 - Date of NOA

12/16/2014 - Date NOA was received by USCIS

12/22/2014 - Received NOA (hard copy) in the mail

12/30/2014 - Date of Yellow Letter

01/04/2015 - Received yellow letter in the mail

01/07/2015 - Biometrics appointment

01/09/2015 - In line for the interview

01/16/2015 - Received interview letter in the mail

02/13/2015 - Interview date (Approved)

04/03/2015 - Oath Ceremony

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Sigh. I'm beginning to think I should mail the paper DS-3032. It's been 10 full days now, and I'm just getting tired of waiting for something to happen. I seriously don't understand why this form is even necessary. It's just to establish who they should send further forms to--something that is EASILY communicable over the phone in around 2 seconds.

dont be worried they take 15 days to accept that , that is normal now a days so wait a little more , even mine was accepted after fifteen days

It has been 16 days for me and I am still not acccepted- I know the most frustrating part is that it is perhaps the simpiliest paper!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Guyana
Timeline
IT'S OFFICIAL!!!! CASE COMPLETE!!!! :dance::dance::dance: Just spoke with an operator which gave me the news!!! Now I'm just waitin on the Interview!!! Now that my processing is out of the way, we can get some of ya'll moving along and get your cases completed too!!!!

Congrats you you christeen and hope for a quick interview... :dance::dance:

*********************

Time line for I130.

01-25-06 - Got married in Guyana

02-06-06 - Mailed I130 to VSC

02-09-06 - VSC received I130

02-14-06 - Received NOA1

07-09-09 - Became USC

07-12-09 - Mailed VSC with upgrading petition.

07-13-09 - VSC received mail.

07-14-09 - Case shows online change, but does not state what.

09-09-09 - NOA2 email.

09-09-14 - NOA2 Hard Copy

*********************

NVC Journey

2009-09-17 : NVC received case

2009-09-18 : Case # assigned

2009-09-25 : DS-3032 and AOS bill generated

2009-09-25 : AOS PAID

2009-09-25 : DS-3032 emailed

2009-09-28 : Mailed hard copy of DS3032

2009-10-03 : DS-3032 accepted

2009-10-05 : IV Fee bill generated

2009-10-05 : IV bill PAID

2009-10-09 : AOS packet sent to NVC

2009-10-22 : IV packet sent to NVC

2009-11-04 : NVC Login Fail

2009-11-06 : Case complete at NVC

Interview Date : Dec 02, 2009 @ 7 am.

Glory be to GOD !!!

Link to comment
Share on other sites

Filed: IR-5 Country: Philippines
Timeline

congrats christeen! :)

955jbsadc6.png

american.gif philippines.gif

Visa Journey

08/01/2009 - Sent I-130 package

09/18/2009 - I-130 approved

09/30/2009 - Case number assigned

12/17/2009 - Failed log in / Case completed YES!!

02/03/2010 - VISA interview at 830am -- VISA APPROVED

03/06/2010 - POE San Francisco via PAL

04/17/2010 - GC and SSN in the mail

ROC

01/06/2012 - Sent I-751 package to CSC

01/09/2012 - I-751 delivered at 11:12am / Date of NOA1

01/12/2012 - Check cashed

01/14/2012 - Received NOA1 hard copy

01/20/2012 - Date of ASC Appointment letter

01/25/2012 - Received ASC Appointment letter hard copy

02/07/2012 - Biometrics done

03/06/2012 - CR1 expiration

06/13/2012 - Date ROC approved

06/15/2012 - Ordered new card production

06/19/2012 - USCIS mailed the new card

06/21/2012 - Got approval letter and my 10 year GC in the mail (GC expires 06/15/2022)

N-400

12/09/2014 - Sent N-400 package

12/13/2014 - N-400 delivered at 10:13 am

12/15/2014 - Date of NOA

12/16/2014 - Date NOA was received by USCIS

12/22/2014 - Received NOA (hard copy) in the mail

12/30/2014 - Date of Yellow Letter

01/04/2015 - Received yellow letter in the mail

01/07/2015 - Biometrics appointment

01/09/2015 - In line for the interview

01/16/2015 - Received interview letter in the mail

02/13/2015 - Interview date (Approved)

04/03/2015 - Oath Ceremony

Link to comment
Share on other sites

Filed: IR-5 Country: Philippines
Timeline

I call the NVC now. to follow up my CHOICE OF AGENT. she told me, WE haven't receive any email from you.

I said I sent it SEPTEMBER 18, 2009.. and the OPERATOR ask me, If i receive an automated response and I said YES maam. she ask me again to sent it TRU email and MAIL also.. to avoid DELAYED..

but before when my HUBBY call the NVC the OPERATOR, tell that its okey if we will not sent the CHOICE OF AGENT TRU MAIL..

QUESTIONS: Those who sent there CHOICE OF AGENT.. did u sent MAIL also aside from EMAIL?

Who among here they GOT APPROVED there CHOICE OF AGENT without sending tru MAIL.

thank u..

shiela

Timeline for my Mother

April 19, 2013 - submit the form I-130

April 22, 2013 - Receive the NOA1

July 29, 2013 - Approved NOA2 ( 82 working days)

July 30, 2013 - USCIS shipped my documents to NVC

Aug 5, 2013 - Arrived at NVC Building

Aug 13, 2013 - Got the NVC case # via PHONE

Aug 14, 2013 - Got the Invoice # via PHONE

Aug 15, 2013 - Send my DS-3032 via Email

Aug 16, 2013 - AOS Pay

Aug 17, 2013 - Got an email to print the COVER SHEET

Aug 21, 2013 - send the AOS overnight at NVC

Aug 28, 2013 - Accept the DS-3032

Aug 30, 2013 - IV BILL pay and Documents Sent to NVC receive the checklist AOS.

September 19, 2013 Sent back the checklist

September 20, 2013 Sept 26, arrived @ NVC

Sept 30,2013 - already encode to their system

ADVANCE MEDICAL @ St. Luke - SEPTEMBER 23, 2013

CASE COMPLETE AS OF TODAY : OCTOBER 23,2013

NOVEMBER 1 , 2013 -Documents left at NVC - Your case is in transit to the Consular Section. Your interview date was provided to you by the National Visa Center

NOVEMBER 4, 2013 Delivered - Signed for by : CEZAR NARTEA

NOVEMBER 5, 2013 - CEAC Case Creation Date: 13-Aug-2013 Status Updated Date: 05-Nov-2013 Your case is ready for your interview when scheduled at the U.S. Consular section. If you have already scheduled an appointment for an interview, please prepare your documents as directed in your appointment letter and appear at the consulate on the appointed date and time. Otherwise, please wait until you have received interview scheduling instructions.

DECEMBER 09, 2013 INTERVIEW DATE FOR MY MOTHER ( scheduled by NVC)

RESCHEDULED ONLINE for my mother interview early, NOVEMBER 18, 2013 - PASSED THE INTERVIEW!!!

11-18-2013 ceac -AP

11-20-2013 ceac - READY

11-21-2013 ceac - ISSUED

11-25-2013 -2go -- transit

11-26-2013 - VISA ON HAND

12-05-2013 - scheduled fly to USA.

Link to comment
Share on other sites

my husband also called NVC yesterday regarding ours DS3032 , i sent it trough mail ( fedex express) and email on 24 September and opertor told him they did not recive anything yet not hard copy and no-email, so we have to call later for few days

Edited by selma&elvir

I-130 approved after 62 days

NVC journey

09-18-2009 entered in system NVC

09-22-2009 asigned case number

09-24-2009 mailed and e-mailed my 3032

09-29-2009 AOS shown paid

09-26-2009 recived AOS (AVR)

10-05-2009 accepted DS3032

10-05-2009 invoiced IV bill

10-13-2009 recived by email confirmation DS3032 (STRANGE)

10-16-2009 sent DS230

10-19-2009 AVR said some documents are missing and they are incomplete we got RFE false

10-21-2009 recived email for missing documents-checklist

10-19-2009 delivered DS230 by USPS

10-23-2009 AVR recived checklist

10-29-2009 log in fail - case complete confirmed official by OP

11-10-2009 medical exam passed

11-03-2009 papers forwarded to sarajevo embassy

12-09-2009 INTERVIEW SCHEDULED visa approved

14 December POE

29 December got green card

30 December got driving license

Link to comment
Share on other sites

Filed: IR-5 Country: Philippines
Timeline
my husband also called NVC yesterday regarding ours DS3032 , i sent it trough mail ( fedex express) and email on 24 September and opertor told him they did not recive anything yet not hard copy and no-email, so we have to call later for few days

really?? Ohh.. tsk tsk.. That is why I sent email again tonight my time, coz that is what the operator told me, sent it again.. Grrr.. almost 10 days already.. i am little bit worried. if there email are working..

I just want ed to know here on VJ those who sent there choice of agent tru EMAIL only.. if they approved''

hope somebody can share here..

shiela

Timeline for my Mother

April 19, 2013 - submit the form I-130

April 22, 2013 - Receive the NOA1

July 29, 2013 - Approved NOA2 ( 82 working days)

July 30, 2013 - USCIS shipped my documents to NVC

Aug 5, 2013 - Arrived at NVC Building

Aug 13, 2013 - Got the NVC case # via PHONE

Aug 14, 2013 - Got the Invoice # via PHONE

Aug 15, 2013 - Send my DS-3032 via Email

Aug 16, 2013 - AOS Pay

Aug 17, 2013 - Got an email to print the COVER SHEET

Aug 21, 2013 - send the AOS overnight at NVC

Aug 28, 2013 - Accept the DS-3032

Aug 30, 2013 - IV BILL pay and Documents Sent to NVC receive the checklist AOS.

September 19, 2013 Sent back the checklist

September 20, 2013 Sept 26, arrived @ NVC

Sept 30,2013 - already encode to their system

ADVANCE MEDICAL @ St. Luke - SEPTEMBER 23, 2013

CASE COMPLETE AS OF TODAY : OCTOBER 23,2013

NOVEMBER 1 , 2013 -Documents left at NVC - Your case is in transit to the Consular Section. Your interview date was provided to you by the National Visa Center

NOVEMBER 4, 2013 Delivered - Signed for by : CEZAR NARTEA

NOVEMBER 5, 2013 - CEAC Case Creation Date: 13-Aug-2013 Status Updated Date: 05-Nov-2013 Your case is ready for your interview when scheduled at the U.S. Consular section. If you have already scheduled an appointment for an interview, please prepare your documents as directed in your appointment letter and appear at the consulate on the appointed date and time. Otherwise, please wait until you have received interview scheduling instructions.

DECEMBER 09, 2013 INTERVIEW DATE FOR MY MOTHER ( scheduled by NVC)

RESCHEDULED ONLINE for my mother interview early, NOVEMBER 18, 2013 - PASSED THE INTERVIEW!!!

11-18-2013 ceac -AP

11-20-2013 ceac - READY

11-21-2013 ceac - ISSUED

11-25-2013 -2go -- transit

11-26-2013 - VISA ON HAND

12-05-2013 - scheduled fly to USA.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I called NVC today also because its been over 2 weeks now and they told me it doesn't matter- email or regular mail is taking about 3 weeks to process because of how busy they are...I asked her if I should resend the 3032 and she said to hang on because they probably have it but they are just really behind on processing

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×