imse82
-
Posts
525 -
Joined
-
Last visited
Content Type
Profiles
Forums
Partners
Immigration Wiki
Guides
Immigration Forms
Times
Gallery
Store
Blogs
Posts posted by imse82
-
-
Sorry to hear that, we all have the same issue.
To email your certificate check this link below
Don't forget the cover sheet, and send both the Arabic and certified copy in English.
The file must be in PDFs.
I believe the cover sheet is not required for electronic processing you just put in your case number in the subject line.
-
I remember...Thanks! Yes I remember reading about this before... I went back over November and late October and couldn't find anything.
Hopefully someone else knows about this. Thanks!
Someone asked NVC CSR if they need to submit certificate of non-conviction because it's new requirement and the answer was NO and it will only be required for new cases.
Waiting here as well with everyone got a checklist on 10/9 for marriage certificate and responded same day and was given scan date of 10/14. Didn't want to take the risk and emailed the certificate of non-conviction in November (scan date 11/4). Hopefully will hear good news soon.
-
Scan date 10/14 as well for checklist called on Friday and nothing yet.
-
Same here! Still waiting
AOS scan date - oct 3
Civil docs scan date - oct 28
Is it normal to review the aos first? When I called the rep said, my aos already been reviewed.
They usually review packages together not sure why they only reviewed one in your case.
-
Still waiting here as well last scan date is 10/14 or 10/23 depends on who pick up the phone at NVC so hopefully they go with the 14th....
-
So many oct. 14th cc last couple days... Hope they keep this pace.
-
Lucky you looks like things went smooth at NVC... Been there for 7 months and counting.
-
You will be fine I doubt you will get rfe. If you do, just send the corrected form.
-
why NVC taking so slow to review our documents ? They need to start hiring more staffs if work is overloaded ?
They changed contractors back in April and this is where all the slowness begun. 7 months at NVC and counting... ? ?
-
My 8th month at NVC and they telling me 60 more days so that would be 10 months at the end... No one can beat this
-
You should be hearing something soon may be within a week at the latest.
-
Slow day... Are they even working today? Changing contractors is what truly killing us not the increased number of petitions BS they sending to everyone. They just learning how to do things on the job using our applications... Will be starting my 7th months at NVC real soon here.
-
Yes my economic situation changed and I have to work instead of school to support my family. It was either work or get public assistance but that was one thing I don't want to do .
That's unfortunate but it might be still wise to get your spouse her asap this way no need to maintain two houses plus she can work in the states and help your financial situation. Just something to think about.
As far as the interview goes you can still get it done asap then get ur wife here in march because the immigration visa is valid for 6 months.
-
Ouch! I pray me and you get outta this hole soon bro. What they got you locked in for?
I see you applied 1 month after me so we're pretty much close.
They got my case at the beginning of May when thet were dead after all the waiting I got a checklist for the marriage certificate even though I already sent it. I sent again on oct 12th and now doing more waiting... I feel like I will never get out of there hahah. Good luck to you too.
-
This whole process is ### retarded from top - down. In 2 months I'm going to pass my one year since I applied last year in December.
Send AOS Aug 2nd, and IV Sept 12th (scanned 17th), and got a check list for AOS on Oct 3rd for wrong 2013 total income not matching whats on transcript when I also sent these fools account record that reflects changes in income.
God knows how much longer I have to wait for this lizard ###### to finish.
I wonder if during winter time, they receive less petitions so NVC can start crunching out these as fast as possible.
Been at NVC for 6 months and still no light at the end of the tunnel... holiday season is coming and these people will be taking time off to be be with their families. So things most likely will move at slower pace.
-
I called juarez again the direct link to the ds 260 at the consulate is http://ceac.state.gov/iv
Thank you so much for your answers
I have another question I just started to work last month and had to put on hold my education, my expedite was accepted because of educational and economical reasons will this be an issue because it was an expedite and if so I have no money right now and wanted to wait for the interview till next year will it look bad if we wait a bit for the interview? because it was expedited? we wanted to wait till March?
So you asked foe expedite and it was approved and now you want to wait about 5 months to schedule an interview?
-
Same here. E-mailed document on Oct 01, confirmation received on Oct 21. It says 60 days from the date mail was received, which is October 01.
Great... Glad they going by received date not opened date.
-
Ok now I feel a little better. My wife submitted our final IV supporting documents on Oct 12 by email. Still haven't gotten any confirmation. I was worried so I called NVC just to make sure at least they were in the system, but the lady said they had no record. And there was no way to tell. Other than to resubmit everything as a backup. I am assuming by the end of next week at least we will get a confirmation email. Kanuk, what is the scan date on your email is it Oct 3 or Oct 20? I can't bear to wait another 17 days. This process has been 1 step forward 2 steps back from day 1 . Good luck to all
boarder
Submitted the "missing" docs electronically on the 10th and still not in the system. They are really slow...
-
AOS and IV documents sent in one package 15 SEP I hope I don't get a check list if that happens then it will mess everything up as I am supposed to deploy soon....so I guess we will see. Such a frustrating process. I can only imagine how those that have waited longer feel. Mad, angry and sad almost every emotion possible.
Waiting is not fun. Going into my 7th months at NVC they killing me slowly
-
My packages were sent electronically on Oct 3rd and I only got my confirmation email 3 days ago.... Slow, slow, slow....
They are really slow opening electronic docs now. I sent mine on the 10th and they don't have them in the system yet. What's your scan date in the confirmation email you got?
-
Anyone recently submitted documents to nvc electronic? I submitted docs 14 days ago and they still don't have them in the system. Is that normal?
-
IR1/CR1 ? .. It's unusual
Yup got there when things were really slow... 35 days for case number and 72 days for IV fees invoice and then checklist for something I already submitted.
-
Oh no new NVC thread will be starting next week and looks like I will still be around. Will be my 7th months at NVC.... How exciting
-
scan the picture front and back then copy the pictures to Microsoft word file then copy and paste the picture so you have two pictures on one page then convert to pdf and email....
NVC Filers - December 2014
in IR-1 / CR-1 Spouse Visa Case Filing and Progress Reports
Posted
Last couple of days been really slow... I hope they didn't start their Christmas holiday already!!