Good morning to all of you friends...

I have a very important question about i-130 first step.

I'm affraid to get a R.F.E for this reason:

 

My Marriage certificate is in spanish, so we translated it and include in the i-130 package, the translation says everything: Names, City of Marriage, Date of marriage, Date of Register , name of the Notary, name of the people in charge of register it , date of registry etc.

 

Now my question is, if that translated copy, that was maked by a certified  personnel includes all that data, the spanish copy is not neccesary if they are asking for a copy translated in English right...

Now I'm really :mellow::hehe::cry:affraid to get one of the Nemesis of the Visa Journey (AN RFE) ...

If so, what happens, if they asked me for the spanish copy, what should I do, and how many time would it delay my process?

Sincerely waiting for your prompt response, and please , include my wife, my step son and I in your prays not to get an RFE for this!

We 're kind of stressed about the process, and a RFE would be a cold ice cube over us...

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Posted

You still need the original (copy) of your marriage certificate so they can see what the real thing is. Just translation without the real document will not suffice and you should expect an RFE

ROC 2009
Naturalization 2010

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
Posted (edited)
5 minutes ago, milimelo said:

You still need the original (copy) of your marriage certificate so they can see what the real thing is. Just translation without the real document will not suffice and you should expect an RFE

I have the original one in my hand, but what I'm saying is that in the i-130 I should include a Photocopy of the original (in spanish) and also accompanied by the translation in English.

 

Or maybe not get the RFE because I have to present the original one at the embassy, and provide again another copy translated in a future stage?

Help with this please, we are worried about this!!!!!

 

Another Question , how a RFE in this particular case would slow the process down!

Edited by Jhonny

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
Posted

No more information? :(:help:

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
Posted (edited)

Wow another Question, in case of get an RFE we have to send it all over again:

 

I mean , the affidavit of support, the translations again, the photos, I mean , the entire i-130 package again (of course not the money order again)

Or just send them the one thing that they requested? In my case the photocopy on my marriage certificate (in case that we got the RFE)!!!!

Please, the more the time advances the more concerned we are!!!!!

Edited by Jhonny

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline
Posted
5 hours ago, Jhonny said:

Good morning to all of you friends...

I have a very important question about i-130 first step.

I'm affraid to get a R.F.E for this reason:

 

My Marriage certificate is in spanish, so we translated it and include in the i-130 package, the translation says everything: Names, City of Marriage, Date of marriage, Date of Register , name of the Notary, name of the people in charge of register it , date of registry etc.

 

Now my question is, if that translated copy, that was maked by a certified  personnel includes all that data, the spanish copy is not neccesary if they are asking for a copy translated in English right...

Now I'm really :mellow::hehe::cry:affraid to get one of the Nemesis of the Visa Journey (AN RFE) ...

If so, what happens, if they asked me for the spanish copy, what should I do, and how many time would it delay my process?

Sincerely waiting for your prompt response, and please , include my wife, my step son and I in your prays not to get an RFE for this!

We 're kind of stressed about the process, and a RFE would be a cold ice cube over us...

Include a copy of your marriage certificate along with the translation. DO NOT just send the translation without a copy of the marriage certificate. 

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline
Posted
30 minutes ago, Jhonny said:

Wow another Question, in case of get an RFE we have to send it all over again:

 

I mean , the affidavit of support, the translations again, the photos, I mean , the entire i-130 package again (of course not the money order again)

Or just send them the one thing that they requested? In my case the photocopy on my marriage certificate (in case that we got the RFE)!!!!

Please, the more the time advances the more concerned we are!!!!!

If you receive an RFE you will just have to send the supporting documents they are request and not the entire packet again. It is best practice to send it as a certified mail along with tracking. In addition, they will give you a date of when you need to respond by.

Filed: IR-1/CR-1 Visa Country: Haiti
Timeline
Posted
5 hours ago, Jhonny said:

Good morning to all of you friends...

I have a very important question about i-130 first step.

I'm affraid to get a R.F.E for this reason:

 

My Marriage certificate is in spanish, so we translated it and include in the i-130 package, the translation says everything: Names, City of Marriage, Date of marriage, Date of Register , name of the Notary, name of the people in charge of register it , date of registry etc.

 

Now my question is, if that translated copy, that was maked by a certified  personnel includes all that data, the spanish copy is not neccesary if they are asking for a copy translated in English right...

Now I'm really :mellow::hehe::cry:affraid to get one of the Nemesis of the Visa Journey (AN RFE) ...

If so, what happens, if they asked me for the spanish copy, what should I do, and how many time would it delay my process?

Sincerely waiting for your prompt response, and please , include my wife, my step son and I in your prays not to get an RFE for this!

We 're kind of stressed about the process, and a RFE would be a cold ice cube over us...

Send the original Spanish copy as well as the certified English translation copy.

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
Posted
4 minutes ago, jakelake said:

Send the original Spanish copy as well as the certified English translation copy.

Well, I'm from now counting me in the RFE blacklist.!!!!UGHHHHH!!!!!

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...