Jump to content

26 posts in this topic

Recommended Posts

Filed: Citizen (pnd) Country: Pakistan
Timeline
Posted

So I know that is is not likely that anyone can answer this question but here it is. My husband is Pakistani, living in Pakistan. My cousin decided to get married in Mexico this July. Although I do not need a visa, my husband does. There is 0% chance he will have his CR1 approved in time. I understand that if he is somehow able to obtain a visit visa to the US, the can travel to Mexico on this visa. So my question is, has anyone successfully gotten a B1/B2 visa, especially with an immigrant visa petition in progress, in order to go to a country other than the US. If anyone can give me pointers on this I would be super appreciative! Or if anyone knows how in the world to get a Mexican visa from Pakistan that would be really helpful! Thanks!

Spoiler

 

Married December 19, 2014

I-130 Petition sent January 14, 2015
NOA1 date January 20, 2015 (NSC)

NOA2 date May 28, 2015 :dance::dance::dance:

Mailed to NVC June 4, 2015

NVC Received June 10, 2015

NVC Case Number Assigned June 23, 2015

NVC AoS Invoice via Mail June 24, 2015

NVC Selected Agent Over Phone June 30, 2015 (Unable to logon to CEAC)

NVC IV Invoice via email received July 1, 2015

NVC AoS/IV Package Mailed July 2, 2015

NVC AoS & IV Fee Paid Online (CEAC is working) July 6. 2015

NVC Document Scan Date July 6, 2015

NCV AoS & IV Fee marked as paid in CEAC July, 7 2015

NVC DS 260 Completed July 8, 2015

NVC CC July 30, 2015 (24 days after scan date, about 2 months post NOA2)

Interview Scheduled on August 26, 2015

Interview P4 Email Received August 27, 2015

Medical in Islamabad September 2, 2015

Interview Date September 22, 2015 CANCELLED (Embassy is Over scheduled) :cry: :cry: :cry: :cry: :cry:

Interview Scheduled on September 10, 2015

Interview Date October 14, 2015 APPROVED

Visa Issued October 16, 2015, 9 months start to finish

POE JFK October 26, 2015

GC in Hand Jan 8, 2016

RoC I-751 NOA1 August 31, 2017 (Vermont Service Center)

Biometrics October 2, 2017

I551 Stamp in Passport August 2, 2018

18 Month Extension Letter August 3, 2018

Applied for Naturalization N-400 Online July 30, 2018

Biometrics August 23, 2018

10 year GC is in production September 17, 2018

 

 
 
 
 
 
 
 
 
 
 
 
 
Filed: K-1 Visa Country: Wales
Timeline
Posted

If he wants to visit Mexico then he should apply for a visa at the mexican consulate.

“If you know the enemy and know yourself, you need not fear the result of a hundred battles. If you know yourself but not the enemy, for every victory gained you will also suffer a defeat. If you know neither the enemy nor yourself, you will succumb in every battle.”

Filed: Citizen (pnd) Country: Pakistan
Timeline
Posted

If he wants to visit Mexico then he should apply for a visa at the mexican consulate.

There is no Mexican consulate or embassy in Pakistan, that is why I asked this question.

Spoiler

 

Married December 19, 2014

I-130 Petition sent January 14, 2015
NOA1 date January 20, 2015 (NSC)

NOA2 date May 28, 2015 :dance::dance::dance:

Mailed to NVC June 4, 2015

NVC Received June 10, 2015

NVC Case Number Assigned June 23, 2015

NVC AoS Invoice via Mail June 24, 2015

NVC Selected Agent Over Phone June 30, 2015 (Unable to logon to CEAC)

NVC IV Invoice via email received July 1, 2015

NVC AoS/IV Package Mailed July 2, 2015

NVC AoS & IV Fee Paid Online (CEAC is working) July 6. 2015

NVC Document Scan Date July 6, 2015

NCV AoS & IV Fee marked as paid in CEAC July, 7 2015

NVC DS 260 Completed July 8, 2015

NVC CC July 30, 2015 (24 days after scan date, about 2 months post NOA2)

Interview Scheduled on August 26, 2015

Interview P4 Email Received August 27, 2015

Medical in Islamabad September 2, 2015

Interview Date September 22, 2015 CANCELLED (Embassy is Over scheduled) :cry: :cry: :cry: :cry: :cry:

Interview Scheduled on September 10, 2015

Interview Date October 14, 2015 APPROVED

Visa Issued October 16, 2015, 9 months start to finish

POE JFK October 26, 2015

GC in Hand Jan 8, 2016

RoC I-751 NOA1 August 31, 2017 (Vermont Service Center)

Biometrics October 2, 2017

I551 Stamp in Passport August 2, 2018

18 Month Extension Letter August 3, 2018

Applied for Naturalization N-400 Online July 30, 2018

Biometrics August 23, 2018

10 year GC is in production September 17, 2018

 

 
 
 
 
 
 
 
 
 
 
 
 
Filed: AOS (apr) Country: Pakistan
Timeline
Posted

Try calling the Mexican embassy here in the US and I am sure they can give the information you need. Here is their number (202) 728-1600.

K-1 I-129F Sent : 2012-04-30

I-129F NOA1 : 2012-05-03

I-129F RFE(s) :NONE!!! Praise GOD!!

I-129F NOA2 : 2012-11-07

NVC Received : 2012-11-13

NVC Left : 2012-11-28

Consulate Received : 2012-12-03

Packet 3 Received : 2012-12-05

Packet 3 Sent : 2012-12-15

Packet 4 Received : 2012-12-20

Interview Date : 2013-01-18

Interview Result : Administrative Review

2013-11-20 Embassy requested new medical, pictures and DS160.2014-02-24 Fingerprints and Oath (But was told AP was still in place).Ceac Status:2014-03-06 Creation date changed and also changed from immigrant to non-immigrant.2014-04-08 and 2014-04-11

Status Updates 2014-04-15 "ISSUED" To God be the glory!!!

2014-04-19 Visa in hand.2014-04-21

POE 2014-06-01 Married!

AOS 2014-07-19 AOS/EAD/AP

Mailed 2014-07-21

NOA 12014-08-18

Biometrics 2014-09-23

EAD/AP Combo Card Received2015-01-03

Received Potencial Interview Waiver Notice2015-05-01

Submitted Service Request2015-05-08 Reponse to Service Request "File is in transit to Washington District office 2015-05-19"

Mailed Renewal of EAD/AP2015-05-26

USCIS Received EAD/AP Applications 2015-06-04

NOA 1 & Biometrics Appointment 2015-06-17

Biometrics 2015-06-09 2nd Service Request (No answer)

2015-07-10 Status of EAD/AP Changed to "Card in production"2015-07-10

3rd Service Request 2015-07-17

Received EAD 2015-07-21

2016-24-07 Still Waiting!!! 2 YEARS!!!!No interview, No Greencard

Filed: Citizen (pnd) Country: Pakistan
Timeline
Posted

Try calling the Mexican embassy here in the US and I am sure they can give the information you need. Here is their number (202) 728-1600.

I already called, they suggested I try to apply for a US visit visa.

Spoiler

 

Married December 19, 2014

I-130 Petition sent January 14, 2015
NOA1 date January 20, 2015 (NSC)

NOA2 date May 28, 2015 :dance::dance::dance:

Mailed to NVC June 4, 2015

NVC Received June 10, 2015

NVC Case Number Assigned June 23, 2015

NVC AoS Invoice via Mail June 24, 2015

NVC Selected Agent Over Phone June 30, 2015 (Unable to logon to CEAC)

NVC IV Invoice via email received July 1, 2015

NVC AoS/IV Package Mailed July 2, 2015

NVC AoS & IV Fee Paid Online (CEAC is working) July 6. 2015

NVC Document Scan Date July 6, 2015

NCV AoS & IV Fee marked as paid in CEAC July, 7 2015

NVC DS 260 Completed July 8, 2015

NVC CC July 30, 2015 (24 days after scan date, about 2 months post NOA2)

Interview Scheduled on August 26, 2015

Interview P4 Email Received August 27, 2015

Medical in Islamabad September 2, 2015

Interview Date September 22, 2015 CANCELLED (Embassy is Over scheduled) :cry: :cry: :cry: :cry: :cry:

Interview Scheduled on September 10, 2015

Interview Date October 14, 2015 APPROVED

Visa Issued October 16, 2015, 9 months start to finish

POE JFK October 26, 2015

GC in Hand Jan 8, 2016

RoC I-751 NOA1 August 31, 2017 (Vermont Service Center)

Biometrics October 2, 2017

I551 Stamp in Passport August 2, 2018

18 Month Extension Letter August 3, 2018

Applied for Naturalization N-400 Online July 30, 2018

Biometrics August 23, 2018

10 year GC is in production September 17, 2018

 

 
 
 
 
 
 
 
 
 
 
 
 
Filed: K-1 Visa Country: Wales
Timeline
Posted

a quick google suggests that there is a consulate in Pakistan.

Usually if a country does not have representation then such issues would be dealt with by consulate in a nearby country.

“If you know the enemy and know yourself, you need not fear the result of a hundred battles. If you know yourself but not the enemy, for every victory gained you will also suffer a defeat. If you know neither the enemy nor yourself, you will succumb in every battle.”

Filed: Lift. Cond. (apr) Country: India
Timeline
Posted (edited)

Mexican Consulate in Karachi, Pakistan Lakson Square, Building # 2
Sarwar Shaheed Road
Karachi 742000
Pakistan Telephone (+92) (21) 3569 8475 Telefax (+92) (21) 3568 3410
(+92) (21) 3568 4336 E-mail sjh@cyber.net.pk

It really bothers me how sometimes people on this website don't even try to google stuff. The closest US embassy to Pakistan is in India.

Edited by Dohan
K-1 Visa

Service Center: Texas Service Center

Transferred? No

Consulate: Mumbai, India

 

Met at University in UK: 2010

Engaged in India: 03/31/2014

I-129F Sent: 06/20/2014

NOA1: 06/25/2014

NOA2: 12/16/2014

NOA2 Hardcopy Received: 12/23/2014

Case Sent to NVC: 12/23/2014

NVC Case Number Assigned: 01/05/2015

Case Sent to Consulate: 01/08/2015

Case "Ready" at Consulate: 01/09/2015

Applied for PCC: 01/20/2015

PCC in hand: 02/23/2015

Medical: 01/23/2015

Completed DS-160 and paid visa fee: 02/20/2015

Interview: 03/13/2015 APPROVED :)--> Same day went into AP

Visa "issued" on CEAC webstie: 03/16/2015

:goofy: :goofy: Visa in hand! 03/18/2015 :goofy::goofy:

POE: 06/04/2015 :dancing: :dancing: :dancing:

AOS Journey

06.11.2015- City Hall Wedding

06.29.2015- Mailed AOS Package

07.01.2015 - Package Delivered at Chicago Lockbox

07.02.2015- Date Received as per USCIS

07.09.2015- NOA1 for EAD/AP

07.24.2015- RFE :ranting:

08.13.2015- USCIS accepted RFE response

09.08.2015- EAD received

Waiting for the interview :clock:

12.19.2015 WE GOT THE GREEN CARD IN THE MAIL!!!!! No interview :)

ROC

10.25.2017 ROC packet received by VT Service Center

11.02.2017- Received NOA dated 10.26.2017

11.29.17- Completed Biometrics

Waiting for the interview :clock:

 

 

Filed: Citizen (pnd) Country: Pakistan
Timeline
Posted

Mexican Consulate in Karachi, Pakistan Lakson Square, Building # 2

Sarwar Shaheed Road

Karachi 742000

Pakistan Telephone (+92) (21) 3569 8475 Telefax (+92) (21) 3568 3410

(+92) (21) 3568 4336 E-mail sjh@cyber.net.pk

It really bothers me how sometimes people on this website don't even try to google stuff. The closest US embassy to Pakistan is in India.

a quick google suggests that there is a consulate in Pakistan.

Usually if a country does not have representation then such issues would be dealt with by consulate in a nearby country.

Ok I did not ask to be insulted, I specifically asked this question hoping to elicit a response from someone who is Pakistani. I have already googled I am quite proficient in it, and despite what the results say there is not an OPEN consulate or embassy in Pakistan for Mexico, they are both closed. I have already confirmed this. There are embassies Iran or India, but then of course he would have to get a visa to go there to apply for another visa! (It says documents need to be dropped off in person) That is why I asked.

Spoiler

 

Married December 19, 2014

I-130 Petition sent January 14, 2015
NOA1 date January 20, 2015 (NSC)

NOA2 date May 28, 2015 :dance::dance::dance:

Mailed to NVC June 4, 2015

NVC Received June 10, 2015

NVC Case Number Assigned June 23, 2015

NVC AoS Invoice via Mail June 24, 2015

NVC Selected Agent Over Phone June 30, 2015 (Unable to logon to CEAC)

NVC IV Invoice via email received July 1, 2015

NVC AoS/IV Package Mailed July 2, 2015

NVC AoS & IV Fee Paid Online (CEAC is working) July 6. 2015

NVC Document Scan Date July 6, 2015

NCV AoS & IV Fee marked as paid in CEAC July, 7 2015

NVC DS 260 Completed July 8, 2015

NVC CC July 30, 2015 (24 days after scan date, about 2 months post NOA2)

Interview Scheduled on August 26, 2015

Interview P4 Email Received August 27, 2015

Medical in Islamabad September 2, 2015

Interview Date September 22, 2015 CANCELLED (Embassy is Over scheduled) :cry: :cry: :cry: :cry: :cry:

Interview Scheduled on September 10, 2015

Interview Date October 14, 2015 APPROVED

Visa Issued October 16, 2015, 9 months start to finish

POE JFK October 26, 2015

GC in Hand Jan 8, 2016

RoC I-751 NOA1 August 31, 2017 (Vermont Service Center)

Biometrics October 2, 2017

I551 Stamp in Passport August 2, 2018

18 Month Extension Letter August 3, 2018

Applied for Naturalization N-400 Online July 30, 2018

Biometrics August 23, 2018

10 year GC is in production September 17, 2018

 

 
 
 
 
 
 
 
 
 
 
 
 
Filed: K-1 Visa Country: Wales
Timeline
Posted

You said there was not one, but I do remember a similar situation, somebody wanted to go to Singapore? and they had to get a visa from the consulate in India.

“If you know the enemy and know yourself, you need not fear the result of a hundred battles. If you know yourself but not the enemy, for every victory gained you will also suffer a defeat. If you know neither the enemy nor yourself, you will succumb in every battle.”

Filed: AOS (apr) Country: Pakistan
Timeline
Posted

I already called, they suggested I try to apply for a US visit visa.

hmm ok. I personally think that is a bit hard for him to get.

K-1 I-129F Sent : 2012-04-30

I-129F NOA1 : 2012-05-03

I-129F RFE(s) :NONE!!! Praise GOD!!

I-129F NOA2 : 2012-11-07

NVC Received : 2012-11-13

NVC Left : 2012-11-28

Consulate Received : 2012-12-03

Packet 3 Received : 2012-12-05

Packet 3 Sent : 2012-12-15

Packet 4 Received : 2012-12-20

Interview Date : 2013-01-18

Interview Result : Administrative Review

2013-11-20 Embassy requested new medical, pictures and DS160.2014-02-24 Fingerprints and Oath (But was told AP was still in place).Ceac Status:2014-03-06 Creation date changed and also changed from immigrant to non-immigrant.2014-04-08 and 2014-04-11

Status Updates 2014-04-15 "ISSUED" To God be the glory!!!

2014-04-19 Visa in hand.2014-04-21

POE 2014-06-01 Married!

AOS 2014-07-19 AOS/EAD/AP

Mailed 2014-07-21

NOA 12014-08-18

Biometrics 2014-09-23

EAD/AP Combo Card Received2015-01-03

Received Potencial Interview Waiver Notice2015-05-01

Submitted Service Request2015-05-08 Reponse to Service Request "File is in transit to Washington District office 2015-05-19"

Mailed Renewal of EAD/AP2015-05-26

USCIS Received EAD/AP Applications 2015-06-04

NOA 1 & Biometrics Appointment 2015-06-17

Biometrics 2015-06-09 2nd Service Request (No answer)

2015-07-10 Status of EAD/AP Changed to "Card in production"2015-07-10

3rd Service Request 2015-07-17

Received EAD 2015-07-21

2016-24-07 Still Waiting!!! 2 YEARS!!!!No interview, No Greencard

Filed: K-1 Visa Country: Wales
Timeline
Posted

Also meaningless as it is Mexico he wants to visit.

Just wondering if there are other complications, how would he get there?

“If you know the enemy and know yourself, you need not fear the result of a hundred battles. If you know yourself but not the enemy, for every victory gained you will also suffer a defeat. If you know neither the enemy nor yourself, you will succumb in every battle.”

Posted

It looks like the closest Mexican embassy for Pakistan is in Iran.

And on their website they say that anyone holding a US visa can enter Mexico as a visitor for business or tourism without a visa.

So his options are:

1. Try for a US visitor visa

2. Hope that the CR1 is through in time

3. Apply and travel to Iran for a Mexican visa.

http://embamex.sre.gob.mx/iran/index.php/en/visa

Filed: Citizen (pnd) Country: Pakistan
Timeline
Posted

Also meaningless as it is Mexico he wants to visit.

Just wondering if there are other complications, how would he get there?

No visa is required for Mexico if you hold a visa for the US. That is why the staff at the Mexican embassy suggested to apply for a US visit visa. How would he get to Mexcio? On the plane of course :)

It looks like the closest Mexican embassy for Pakistan is in Iran.

And on their website they say that anyone holding a US visa can enter Mexico as a visitor for business or tourism without a visa.

So his options are:

1. Try for a US visitor visa

2. Hope that the CR1 is through in time

3. Apply and travel to Iran for a Mexican visa.

http://embamex.sre.gob.mx/iran/index.php/en/visa

Right! That is why I am looking to see if anyone has successfully applied for a US tourist visit to go to a country other than the US, especially with a pending petition! And no there is 0 chance the CR1 will be approved in time, as you can see it was just filed AND sent to NCV (Slooooow).

Thanks!

Spoiler

 

Married December 19, 2014

I-130 Petition sent January 14, 2015
NOA1 date January 20, 2015 (NSC)

NOA2 date May 28, 2015 :dance::dance::dance:

Mailed to NVC June 4, 2015

NVC Received June 10, 2015

NVC Case Number Assigned June 23, 2015

NVC AoS Invoice via Mail June 24, 2015

NVC Selected Agent Over Phone June 30, 2015 (Unable to logon to CEAC)

NVC IV Invoice via email received July 1, 2015

NVC AoS/IV Package Mailed July 2, 2015

NVC AoS & IV Fee Paid Online (CEAC is working) July 6. 2015

NVC Document Scan Date July 6, 2015

NCV AoS & IV Fee marked as paid in CEAC July, 7 2015

NVC DS 260 Completed July 8, 2015

NVC CC July 30, 2015 (24 days after scan date, about 2 months post NOA2)

Interview Scheduled on August 26, 2015

Interview P4 Email Received August 27, 2015

Medical in Islamabad September 2, 2015

Interview Date September 22, 2015 CANCELLED (Embassy is Over scheduled) :cry: :cry: :cry: :cry: :cry:

Interview Scheduled on September 10, 2015

Interview Date October 14, 2015 APPROVED

Visa Issued October 16, 2015, 9 months start to finish

POE JFK October 26, 2015

GC in Hand Jan 8, 2016

RoC I-751 NOA1 August 31, 2017 (Vermont Service Center)

Biometrics October 2, 2017

I551 Stamp in Passport August 2, 2018

18 Month Extension Letter August 3, 2018

Applied for Naturalization N-400 Online July 30, 2018

Biometrics August 23, 2018

10 year GC is in production September 17, 2018

 

 
 
 
 
 
 
 
 
 
 
 
 
Filed: K-1 Visa Country: Wales
Timeline
Posted

That links says you can apply on entry, not that you do not need a visa, if you have a US visa. PR and you do not need a visa.

Pretty sure there are no direct flights which is what I meant.

“If you know the enemy and know yourself, you need not fear the result of a hundred battles. If you know yourself but not the enemy, for every victory gained you will also suffer a defeat. If you know neither the enemy nor yourself, you will succumb in every battle.”

Filed: K-1 Visa Country: Wales
Timeline
Posted

If you are asking has anyone obtained a US visa stating that they do not want to visit the US but need it so they do not have to get a visa in advance to visit somewhere else, then this is a new one.

I can not imagine the US Consulate would issue a visa without assuming you would use it to visit the US.

“If you know the enemy and know yourself, you need not fear the result of a hundred battles. If you know yourself but not the enemy, for every victory gained you will also suffer a defeat. If you know neither the enemy nor yourself, you will succumb in every battle.”

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...