DO NOT DELETE: ***USE MOST RECENT LIST AT THE BOTTOM***



Instructions:
If you want to share your case complete and interview dates:
1. Go to LAST PAGE or before and click "Quote/Reply" on the MOST RECENT LIST.
2. Ask for help only if you will mess up the list
3. Please make sure you are using Rich Text Editor as your message setting(Settings>Posting Settings->Enable visual (RTE))
4. Remove

(top and bottom) around the list by clicking back space just before "do not delete"
5. Always use [Courier New] Font. (It will stay lined up correctly if you use the correct font.)
6. Add in order by NVC case complete date.
7. Add the date you received your interview date so others can see from case complete to assignment time-frame.
8. Please use your VJ member name not the Petitioner/Beneficiary name on your timeline.

March Cases Waiting on Interview:
NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

meltemapo...........03/01/13....05/01/13....06/03/13....IR-1/CR-1....Turkey
FeFrSaKa............03/12/13....04/30/13....06/11/13....IR-1.........Ecuador
martha brown03......03/18/13....05/03/13....06/24/13....IR-1/CR-1....Kenya
Vicki&Nanuka........03/20/13....04/30/13....06/17/13....IR-1/CR-1....Nigeria
lonelyboy2003.......03/29/13....04/30/13....06/11/13....IR-1/CR-1....Vietnam (HCM)


April Cases Waiting on Interview:
NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

Chetsky.............04/02/13....05/01/13....06/03/13....IR-1.........Philippines
romanticminds.......04/03/13....xx/xx/13....xx/xx/13....IR-1.........Cambodia
YA 1127.............04/04/13....05/01/13....06/21/13....IR-1/CR-1....Dominican Rep.
SMANNE..............04/08/13....04/30/13....06/21/13....IR-1/CR-1....Nigeria
srloring13..........04/09/13....04/30/13....06/13/13....IR-1/CR-1....Nigeria
sai.mi28............04/09/13....05/01/13....06/04/13....CR-1.........Philippines
arriyan.............04/10/13....04/29/13....06/21/13....IR-1/CR-1....Singapore
Bishara123..........04/10/13....06/04/13....07/18/13....IR-1/CR-1....Kenya
teysha..............04/12/13....04/30/13....06/27/13....IR-1/CR-1....Haiti
SundayBelinda.......04/12/13....04/30/13....06/06/13....IR-1/CR-1....Nigeria
vanessa27...........04/14/13....06/03/13....07/03/13....CR-1/IR-1....Ecuador
NikiR...............04/15/13....05/01/13....06/03/13....CR-1.........Canada
ErinBeth............04/15/13....04/30/13....06/11/13....CR-1.........Morocco
JandRP..............04/15/13....05/01/13....Got IT!!....IR-1/CR-1....Jamaica
fav13259............04/15/13....04/30/13....06/24/13....IR-1/CR-1....Mexico
Pluis...............04/15/13....04/29/13....06/25/13....IR-1/CR-1....The Netherlands
Jbda................04/16/13....05/01/13....06/24/13....IR-1/CR-1....Turkey
champi..............04/16/13....05/01/13....06/03/13....IR-5.........India
Avram...............04/17/13....04/29/13....06/26/13....IR-1/CR-1....Macedonia
Jonelo..............04/18/13....04/30/13....06/12/13....IR-1/CR-1....Romania
A & C...............04/18/13....05/02/13....06/03/13....CR-1.........Canada
MGRD................04/19/13....04/29/13....06/24/13....IR-1/CR-1....Haiti
Ess.................04/19/13....05/01/13....06/13/13....IR-1/CR-1....Pakistan
shefe...............04/22/13....04/30/13....06/20/13....CR-1/IR-1....Nigeria
Mady................04/22/13....04/29/13....06/04/13....IR-1/CR-1....Egypt
Icede...............04/22/13....05/01/13....06/04/13....IR-1/CR-1....Lithuania
Ludakrishna.........04/23/13....05/01/13....06/12/13....IR-1/CR-1....India
T & P...............04/23/13....05/01/13....06/12/13....IR-1/CR-1....India
Sarsoor............ 04/24/13....04/29/13....06/17/13....IR-1/CR-1....Egypt
coltoasty.......... 04/24/13....05/01/13....06/17/13....CR-1.........Pakistan
hikergirl...........04/25/13....05/01/13....06/19/13....CR-1.........Canada
AnhDoiEm............04/25/13....06/05/13....07/11/13....CR-1/IR-1....Vietnam (HCM)
SerenityNOW.........04/26/13....05/14/13....06/05/13....IR-2.........Bulgaria
lucy................04/29/13....05/10/13....06/05/13....IR-2.........Barbados
daphoknee...........04/30/13....05/01/13....06/17/13....IR-1.........Canada
oldblighty..........04/30/13....05/01/13....06/10/13....IR-1/CR-1....UK
squirrelisan........04/30/13....05/10/13....06/03/13....CR-1.........South Korea
Aball...............04/30/13....05/10/13....06/10/13....IR-1/CR-1....Ireland
LunarStar...........04/30/13....05/13/13....06/10/13....CR-1.........Japan
Endo................04/30/13....06/04/13....07/03/13....IR-1/CR-1....Nigeria
E-A.................04/30/13....06/06/13....07/08/13....CR-1.........Vietnam (HCM)
Ash & Tiffany.......04/30/13....05/01/13....06/18/13....CR-1.........Australia


May cases waiting on interview:
NAME COMPLETE RECEIVED INTERVIEW VISA TYPE EMBASSY
Tanithw.............05/01/13....05/04/13....06/03/13....CR-1.........UK
W&H.................05/01/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Egypt
Zamar...............05/01/13....05/13/13....06/06/13....IR-1/CR-1....India
Esele...............05/01/13....05/31/13....07/23/13....CR-1/IR-1....Nigeria
Eliano..............05/02/13....05/13/13....06/26/13....IR-1/IR-2....Georgia
Ixsa................05/03/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Dominican Republic
ronzkie.............05/03/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Philippines

luvstruk............05/06/13....06/03/13....07/16/13....CR-2/IR-2....Nigeria
mrs behappy.........05/06/13....06/05/13....06/28/13....CR-1/IR-1....Brazil
Speedwell...........05/06/13....05/13/13....06/14/13....CR-1.........UK
ppihtr123...........05/06/13....06/03/13....07/02/13....CR-2/IR-2....Philippines
raosaab0202.........05/06/13....05/13/13....06/20/13....CR-1/IR-1....India
Haksar..............05/06/13....05/13/13....06/28/13....IR-1/CR-1....India
dyno305.............05/06/13....05/10/13....06/06/13....IR-1/CR-1....Cuba
Warrup..............05/07/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Algeria
Amado...............05/07/13....06/04/13....07/29/13....IR-1/CR-1....Dominican Republic
visao...............05/08/13....06/07/13....07/18/13....IR-1/CR-1....Vietnam (HCM)
farawaybuttrue......05/08/13....06/03/13....07/10/13....CR-1/IR-1....Nigeria
civilservant........05/10/13....05/13/13....06/12/13....CR-1.........UK
Zandrao.............05/10/13....05/13/13....06/14/13....IR-1/CR-1....UK
Joel&Michelle.......05/10/13....06/03/13....07/09/13....CR-1.........Philippines
miel0217............05/10/13....06/03/13....07/08/13....IR-2.........Philippines
ainsn...............05/10/13....06/05/13....07/10/13....IR-1.........Bangladesh
mrsaloto............05/10/13....06/04/13....07/24/13....IR-1/CR-1....Kenya
Wakey86.............05/13/13....06/04/13....07/29/13....CR-1/IR-1....Kenya
dsanchez16..........05/13/13....05/14/13....06/04/13....IR-1/CR-1....Mexico
ingrid_rachel.......05/xx/13....05/14/13....06/11/13....IR-1/CR-1....Mexico
Angeljay............05/13/13....06/04/13....07/03/13....CR-1/IR-1....Philippines
Acherugo............05/13/13....05/31/13....07/23/13....CR-1/IR-1....Nigeria
MrsWhite&family.....05/13/13....05/13/13....06/27/13....CR-1.........Jamaica
Mathies_dane....... 05/13/13....06/03/13....07/16/13....CR-1/IR-1....Sweden
noorullah111....... 05/13/13....06/06/13....07/03/13....IR-1/CR-1....Pakistan
tato90..............05/13/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Columbia
David & Zoila.......05/15/13....06/03/13....07/09/13....CR-1.........Philippines
odus blessing.......05/15/13....06/03/13....07/29/13....CR-1/IR-1....Nigeria
LuvStruk............05/15/13....05/31/13....07/16/13....CR-1/IR-1....Nigeria
kcck................05/15/13....06/05/13....07/08/13....CR-1/IR-1....UK
Rivea1979...........05/16/13....06/04/13....07/30/13....CR-1.........Nicaragua
applicantctg........05/16/13....06/05/13....07/07/13....CR-1.........Bangladesh
Lucidsofia..........05/16/13....05/29/13....06/14/13....CR-1.........Spain (Expedited)
KDH.................05/17/13....06/05/13....07/17/13....IR-1.........Canada
Aqid................05/17/13....06/05/13....07/23/13....CR-1.........Netherlands
diht................05/17/13....06/04/13....07/23/13....IR-1.........Ireland
MarysabelYPapito....05/20/13....06/04/13....07/18/13....CR-1.........Dominican Republic
HG&TG...............05/20/13....06/10/13....06/27/13....CR-1/IR-1....Netherlands (interview date moved)

Tllanos.............05/20/13....06/04/13....07/05/13....CR-1/IR-1....Brazil
Noahsmama...........05/21/13....xx/xx/13....xx/xx/13....IR-5.........China
Imara Stringham.....05/21/13....06/05/13....07/30/13....IR-1/CR-1....Nicaragua
NCChina.............05/22/13....xx/xx/13....xx/xx/13....IR-1.........China
J Zhang.............05/22/13....xx/xx/13....xx/xx/13....CR-1.........China
preetygirl..........05/22/13....xx/xx/13....xx/xx/13....CR-1/IR-1....UK
smrowe..............05/22/13....06/05/13....07/09/13....CR-1.........Canada
Shpresa.............05/22/13....xx/xx/13....xx/xx/13....CR-1.........Albania
Mike0109............05/22/13....06/12/13....07/09/13....CR-1/IR-1....Belgium
gen26...............05/22/13....06/07/13....07/09/13....IR-1/CR-1....Philippines
louiep..............05/23/13....06/05/13....07/11/13....CR-1/CR-2....Philippines
Lucas&Lucas.........05/23/13....06/04/13....07/08/13....CR-1/IR-1....Brazil
Clemjam.............05/24/13....06/03/13....06/26/13....IR-1.........France (Expedited)
Apalis..............05/24/13....06/04/13....07/19/13....CR-1/IR-1....Singapore
kne1................05/24/13....05/31/13....07/16/13....CR-1/IR-1....Ghana
looneytunes.........05/25/13....06/06/13....07/11/13....IR-1/CR-1....Philippines
Missingmylove2005...05/27/13....06/07/13....07/22/13....CR-1/IR-1....Canada
Jaison..............05/28/13....06/05/13....07/25/13....CR-1/IR-1....India
iamasking...........05/28/13....06/04/13....07/17/13....CR-1/IR-1....Saudi Arabia
Randazzinator.......05/28/13....06/05/13....07/17/13....IR-1/CR-1....Italy
americanrizvi.......05/29/13....06/06/13....07/23/13....CR-1/IR-1....Pakistan
DemRa...............05/29/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Nepal
ScottieHristina.....05/29/13....06/03/13....07/31/13....CR-1/IR-1....Macedonia
Nick1980............05/29/13....06/04/13....07/30/13....CR-1/IR-1....Serbia
NewportWest.........05/30/13....06/05/13....07/26/13....CR-1/IR-1....Canada
Jeize loves Yalee...05/30/13....06/07/13....07/10/13....CR-1/IR-1....London
Robert&Denia........05/30/13....06/07/13....07/08/13....CR-1/IR-1....El Salvador
Vishal Dude.........05/30/13....xx/xx/13....xx/xx/13....CR-1/IR-1....India
nazet...............05/31/13....06/04/13....07/17/13....CR-1/IR-1....Saudi Arabia
Ali.Cha.............05/31/13....06/06/13....07/09/13....CR-1/IR-1....Kazakhstan
JBoss.............. 05/31/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Pakistan



June cases waiting on interview:
NAME COMPLETE RECEIVED INTERVIEW VISA TYPE EMBASSY

Barbara360..........06/04/13....06/06/13....07/23/13....IR-1/CR-1....Italy
MrsFrancia..........06/04/13....xx/xx/13....xx/xx/13.....IR-1/CR-1...Dominican Republic
bsd058..............06/05/13....06/07/13....07/17/13....IR-1/CR-1....Canada
dragonfly928........06/05/13....06/10/13....07/30/13....IR-1/CR-1....Malaysia

braminc.............06/06/13....06/13/13....xx/xx/13....CR-1.........Lebanon
lilb1985............06/07/13....06/07/13....07/11/13....IR-1/CR-1....Sri Lanka
Anil2013............06/07/13....xx/xx/13....xx/xx/13....IR-1/CR-1....South Africa
P & K...............06/10/13....xx/xx/13....xx/xx/13....IR-1/CR-1....South Africa
D.& M...............06/10/13....06/10/13....07/03/13....IR-1/CR-1....Germany
DFrancis............06/11/13....06/11/13....07/16/13....IR-1/CR-1....Bahamas
Apapaia.............06/11/13....06/11/13....07/16/13....IR-1/CR-1....Italy
izabela.............06/12/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Serbia

Summer777...........06/12/13....xx/xx/13....xx/xx/13....IR-1/CR-1....UK
Nicole Johns........06/13/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Canada
Pookah..............06/13/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Scotland
jaysha79............06/13/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Philippines
tsukiyomii100.......06/13/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Bangladesh

Da_Ladybug .........06/13/13....xx/xx/13....07/18/13....IR-1/IR-2....Philippines

Cha n Nel...........06/14/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Philippines
Stubby & Rio........06/14/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Canada

sharaby03...........06/16/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Egypt

Al3jandro89.........06/18/13....xx/xx/13....xx/xx/13....IR-1/CR-1....El Salvador

jthoby..............06/19/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Dominican Republic

dubaiguy............06/19/13....xx/xx/13....xx/xx/13....IR-1.........Abu Dhabi UAE

Darnell.............06/20/13....xx/xx/13....xx/xx/13....IR-1.........China

Moudyan.............06/20/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Nairobi

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

Okay people its the 24th. The last week of June. I am counting on NVC to start August Interview scheduling Thursday and Friday.

Lets hope they are on the same wave length.

Here's to all on this list getting interviews, especially romanicminds. It's on!!

Edited by dwheels76

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Turkey
Timeline

The website says we got AP :( waiting for my husband to get back to the hotel so I can find out if we know why.


USCIS - 66 days ROC - 139 days from sent to approved
12/3/2012 - I-130 delivered to Chicago 5/20/15: mailed I-751 package to California office
12/4/2012 - NOA1 NBC (Missouri Service Center MSC) 5/22/15: Date on NOA1
12/6/2012 - Check cashed 8/26/15: Bio appointment

12/8/2012 - Received paper NOA1 10/06/15: Received Email card was being processed
12/20/2012 - Case number showed up on USCIS website
1/29/2013 - Called USCIS and case is still at NBC
2/8/2013 - Received an Email that we were approved on 2/7/13
3/5/2013 - Told file may have been "misplaced" to email NOA2 to NCVresearch
3/7/2013 - ISO at the USCIS opened a service request to try to track down
if and when the file was shipped. Should hear something before 3/26 ( so she said)

NVC - 119 days NVC to Visa in hand
03/11/2013: NVC received (31 days from NOA2 at USCIS till received at NVC )
03/25/2013: NVC Case no. assigned
03/27/2013: Paid AOS fee (shows paid 3/29/13)
04/01/2013: AOS Sent
03/27/2013: Received IV Bill
03/27/2013: Paid IV Bill (shows paid 3/29/13)
04/01/2013: Sent IV Packet
04/02/2013:IV Packet Delivered
04/16/2013: Case Complete (37 days from received to case complete)
04/16/2013: Received Case Complete Email

05/13/2013: NVC status "In Transit"

051/20/2013: NVC status "Ready"
06/24/2013: Interview date - Orange card... wanted copy of USC passport

07/08/2013: Visa received in the mail

08/03/2013: POE



1XJBm5.png

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Turkey
Timeline

The website says we got AP sad.png waiting for my husband to get back to the hotel so I can find out if we know why.

Ohhh Thank God not normal AP!!!!

Husband got an Orange card and was told to send a copy his passport and both mine and send the copies back with his passport. He said the person wrote approved on the file. And as soon as we send everything he will get his visa.

So....I just need to copy my passports and email them to my husband to showing I was actually there in Turkey. I guess my plane tickets and pictures of us were not enough to prove I was really there 2 times :( Hello we were married in Turkey . How could I get married there if I never went?

I'm stressed but at least its not normal AP. I hate that the website says it is.


USCIS - 66 days ROC - 139 days from sent to approved
12/3/2012 - I-130 delivered to Chicago 5/20/15: mailed I-751 package to California office
12/4/2012 - NOA1 NBC (Missouri Service Center MSC) 5/22/15: Date on NOA1
12/6/2012 - Check cashed 8/26/15: Bio appointment

12/8/2012 - Received paper NOA1 10/06/15: Received Email card was being processed
12/20/2012 - Case number showed up on USCIS website
1/29/2013 - Called USCIS and case is still at NBC
2/8/2013 - Received an Email that we were approved on 2/7/13
3/5/2013 - Told file may have been "misplaced" to email NOA2 to NCVresearch
3/7/2013 - ISO at the USCIS opened a service request to try to track down
if and when the file was shipped. Should hear something before 3/26 ( so she said)

NVC - 119 days NVC to Visa in hand
03/11/2013: NVC received (31 days from NOA2 at USCIS till received at NVC )
03/25/2013: NVC Case no. assigned
03/27/2013: Paid AOS fee (shows paid 3/29/13)
04/01/2013: AOS Sent
03/27/2013: Received IV Bill
03/27/2013: Paid IV Bill (shows paid 3/29/13)
04/01/2013: Sent IV Packet
04/02/2013:IV Packet Delivered
04/16/2013: Case Complete (37 days from received to case complete)
04/16/2013: Received Case Complete Email

05/13/2013: NVC status "In Transit"

051/20/2013: NVC status "Ready"
06/24/2013: Interview date - Orange card... wanted copy of USC passport

07/08/2013: Visa received in the mail

08/03/2013: POE



1XJBm5.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Okay people its the 24th. The last week of June. I am counting on NVC to start August Interview scheduling Thursday and Friday.

Lets hope they are on the same wave length.

Here's to all on this list getting interviews, especially romanicminds. It's on!!

OMG my fingers are crossed !! I am hoping for the first two weeks of August - .... rolls dice...... :)

07-18-12 - Married
10-26-12 - NOA1 sent
10-29-12 - NOA1 received
03-11-13 - NOA2 approved
04-03-13 - NVC received
04-10-13 - NVC case number assigned
04-19-13 - AOS/IV paid

04-22-13 - AOS/IV cleared

06-07-13 - Case Complete

09-03-13 - Medical

09-25-13 - Interview

10-01-13 - Picked up Visa

10-02-13 - POE Queenston-Lewiston

10-11-13 - SSN arrived

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

Is it normal to receive a confirmation email from the Embassy prior to the interview? I just got it... Wasnt expecting that at all.

With the email, they asked for three different things that were missing from the package:

The medical ( Obviously )

My passport ( Makes sense )

Police Certificate of the state Im currently living in ( When I sent the package I hadnt fully completed 6 months of residence in this state, so that makes sense too )

I managed to get the police certificate for the state of Rio Grande do Norte after I sent in my IV package. ( I figured they would ask for it at some point, which they obviously just did )

Is a police certificate dated April 30th, for a July 5th interview still valid? Would I need to get an updated PC?

Please Advise,

Thalita

P.S: Thanks for any feedback guys...

Hey Thalita .... I received my confirmation email from the Embassy prior to the interview today !!!!

This email is to confirm your immigrant visa interview scheduled for July 08th at the U.S. Consulate Rio de Janeiro.

After a preliminary review of your file, we noticed that some documents are missing; please bring them on your interview date.

Pending document(s):

Administrative

( X ) Passport (with at least 8 months of validity remaining) ( Makes sense )

( X ) Medical Exam ( Obviously )

( X ) Proof that marriage was consummate before interview ( Makes sense )

I was married by proxy... Well I hope my 7 months pregnancy belly help ... LOL, But I'll bring hotel receipts, my hubby passport stamps... and all my pre natal docs too...

Look what my hubby said about it: Proof that marriage was consummate before interview ... Lol u have proof?? Hahahahaha

Good lucky for us !!!

Is it normal to receive a confirmation email from the Embassy prior to the interview? I just got it... Wasnt expecting that at all.

With the email, they asked for three different things that were missing from the package:

The medical ( Obviously )

My passport ( Makes sense )

Police Certificate of the state Im currently living in ( When I sent the package I hadnt fully completed 6 months of residence in this state, so that makes sense too )

I managed to get the police certificate for the state of Rio Grande do Norte after I sent in my IV package. ( I figured they would ask for it at some point, which they obviously just did )

Is a police certificate dated April 30th, for a July 5th interview still valid? Would I need to get an updated PC?

Please Advise,

Thalita

P.S: Thanks for any feedback guys...

Hey Thalita .... I received my confirmation email from the Embassy prior to the interview today !!!!

This email is to confirm your immigrant visa interview scheduled for July 08th at the U.S. Consulate Rio de Janeiro.

After a preliminary review of your file, we noticed that some documents are missing; please bring them on your interview date.

Pending document(s):

Administrative

( X ) Passport (with at least 8 months of validity remaining) ( Makes sense )

( X ) Medical Exam ( Obviously )

( X ) Proof that marriage was consummate before interview ( Makes sense )

I was married by proxy... Well I hope my 7 months pregnancy belly help ... LOL, But I'll bring hotel receipts, my hubby passport stamps... and all my pre natal docs too...

Look what my hubby said about it: Proof that marriage was consummate before interview ... Lol u have proof?? Hahahahaha

Good lucky for us !!!

rBHLm8.png

6VHxm8.png

Link to comment
Share on other sites

Filed: Country: Nepal
Timeline

Question:

Hello everybody!

In interview if I have to resubmit my I864 and DS230 for some reason, say my income has changed, then does embassy will going to take some times to re-evaluate the form?? Hope I don't have to wait again after interview too!!!???

Also at POE can we request for change of address in case I moved to different place by the time???

Thank you.

as1cJKgNw000000MDAzMTUwc3w1MjYyODMxc3xXZ

03/22/2011: NOA 1

03/20/2013: NOA 2

04/15/2013: Case number

04/15/2013: DS3032 emailed

04/19/2013: AOS paid

04/26/2013: DS3032 accepted

04/29/2013: IV paid

04/29/2013: AOS package submitted (Resubmitted: 05/13/2013)

05/02/2013: IV package submitted (Resubmitted: 05/16/2013)

05/24/2013: AOS accepted

05/28/2013: IV accepted

05/28/2013: Case complete

*****************************************

08/22/2013: Visa Approved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

Hey Thalita .... I received my confirmation email from the Embassy prior to the interview today !!!!

This email is to confirm your immigrant visa interview scheduled for July 08th at the U.S. Consulate Rio de Janeiro.

After a preliminary review of your file, we noticed that some documents are missing; please bring them on your interview date.

Pending document(s):

Administrative

( X ) Passport (with at least 8 months of validity remaining) ( Makes sense )

( X ) Medical Exam ( Obviously )

( X ) Proof that marriage was consummate before interview ( Makes sense )

I was married by proxy... Well I hope my 7 months pregnancy belly help ... LOL, But I'll bring hotel receipts, my hubby passport stamps... and all my pre natal docs too...

Look what my hubby said about it: Proof that marriage was consummate before interview ... Lol u have proof?? Hahahahaha

Good lucky for us !!!

Hey Thalita .... I received my confirmation email from the Embassy prior to the interview today !!!!

This email is to confirm your immigrant visa interview scheduled for July 08th at the U.S. Consulate Rio de Janeiro.

After a preliminary review of your file, we noticed that some documents are missing; please bring them on your interview date.

Pending document(s):

Administrative

( X ) Passport (with at least 8 months of validity remaining) ( Makes sense )

( X ) Medical Exam ( Obviously )

( X ) Proof that marriage was consummate before interview ( Makes sense )

I was married by proxy... Well I hope my 7 months pregnancy belly help ... LOL, But I'll bring hotel receipts, my hubby passport stamps... and all my pre natal docs too...

Look what my hubby said about it: Proof that marriage was consummate before interview ... Lol u have proof?? Hahahahaha

Good lucky for us !!!

Im so glad to hear that! One thing is for sure... if THAT isnt proof, I dont know what is! :-D

Amazing to think our interviews are in less than two weeks!

04-16-2011: Started Dating

08-30 2012: We got married


10-22-2012: I130 registered at the USCIS

02-02-2013: I130 approved


02-27-2013: Petition registered at NVC

05-20-2013: NVC Case complete

05-27-2013: Received email NVC Case complete

06-04-2013: Called NVC - Interview scheduled for 07-05-2013

06-04-2013: Confirmation from NVC by email


06-06-2013: Left NVC

06-10-2013: Arrived at Rio de Janeiro Embassy - CEAC website shows case as "Ready"

06-19-2013: Recieved confirmation email from the Rio de Janeiro Embassy

07-02-2013: Medical

07-05-2013: Interview


07-25-2013: I-601 Waiver received in NSC

02-07-2014: NSC sent an RFE

04-16-2014: I-601 Approved

05-19-2014: Visa in Hands

06-06-2014: POE - JFK


Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

Hi DHWHEELS76

do u think i would get an interview for august?

Well you are in the queue. But its all about how many are before you and how many slots are available. DR is one busy embassy. ll you can do is pray and hope for the best.

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

Question:

Hello everybody!

In interview if I have to resubmit my I864 and DS230 for some reason, say my income has changed, then does embassy will going to take some times to re-evaluate the form?? Hope I don't have to wait again after interview too!!!???

Also at POE can we request for change of address in case I moved to different place by the time???

Thank you.

I would only give new I-864 if they ask. If they ask for it give to them. Shouldn't take extra time unless its something so crazy they need to investigate. Should be taken then and that's it.

And make sure POE has your most updated address to send the green card. You can let them know yes.

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

( X ) Proof that marriage was consummate before interview

Okay please someone tell me how the heck do you prove you had sex before the interview?

Are they serious?

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

Im so glad to hear that! One thing is for sure... if THAT isnt proof, I dont know what is! :-D

Amazing to think our interviews are in less than two weeks!

Amazing ??? Yes... Sometimes I have to read things again... just to believe !!

Your interview will be friday... I am going to Rio at sunday, post your embassy review... so I can read before my interview at monday .... ;)

rBHLm8.png

6VHxm8.png

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...