Jump to content

23 posts in this topic

Recommended Posts

Hi,

We got approved on the 26th Feb 09. It has been two weeks today and the NVC has not received our file !!!! I have used the recorded service and spoken to an operator. Today she told me it could take up to 90 days for the USCIS to mail it to them - Can someone tell me how do they send it - On the back of a Snail across America????

USCIS JOURNEY

14-Sep-08 Sent I-130

23-Sep-08 Recieved NOA1

28-Oct-08 Received NOA1

09-Feb-09 Received RFE for I-130

16-Feb-09 Sent Evidence for I-130

26-Feb-09 Received email NOA2 Approved!

28-Feb-09 Received Approval notice for I-130

NVC JOURNEY

12-Mar-09 NVC Received File

17-Mar-09 Emailed DS 3032 to NVC

28-Mar-09 Received DS3032 and AOS Bill via email

28-Mar-09 Paid AOS Bill online - Status = In Process

29-Mar-09 Emailed scanned DS3032 & posted via snail mail

30-Mar-09 Received email that DS3032 was received by NVC and that IV Bill will be sent

31-Mar-09 Paid IV Bill

31-Mar-09 AOS Bill Status = PAID !!!

06-Apr-09 Hubby posted DS230 and AOS priority and certified

08-Apr-09 @11:04am - Item Delivered PORTSMOUTH NH 03801 04/08/09 11:02am

10-Apr-09 NVC AVR states documents received

17-Apr-09 AVR states Case Complete at NVC!!!

21-Apr-09 Expedite request approved

24-Apr-09 Case sent from NVC to Sydney Consulate

29-Apr-09 Medical Appointment - Passed, YIPPEE and Thank You God !

05-May-09 Interview scheduled at Sydney Consulate APPROVED!!!

16-May-09 - Arrived in USA!!!!

20-May-09 Got my SSN.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
Hi,

We got approved on the 26th Feb 09. It has been two weeks today and the NVC has not received our file !!!! I have used the recorded service and spoken to an operator. Today she told me it could take up to 90 days for the USCIS to mail it to them - Can someone tell me how do they send it - On the back of a Snail across America????

I've been approved since the 20th of Feb and am still waiting...you're not the only one

Link to comment
Share on other sites

Hi,

We got approved on the 26th Feb 09. It has been two weeks today and the NVC has not received our file !!!! I have used the recorded service and spoken to an operator. Today she told me it could take up to 90 days for the USCIS to mail it to them - Can someone tell me how do they send it - On the back of a Snail across America????

I've been approved since the 20th of Feb and am still waiting...you're not the only one

I know I am not the only one.... I just can't wait anymore. I am over it! But thanks for replying. Really appreciate it. Keep in touch and let me know how when you know NVC have received yours, I too will let you know. Cheers!

USCIS JOURNEY

14-Sep-08 Sent I-130

23-Sep-08 Recieved NOA1

28-Oct-08 Received NOA1

09-Feb-09 Received RFE for I-130

16-Feb-09 Sent Evidence for I-130

26-Feb-09 Received email NOA2 Approved!

28-Feb-09 Received Approval notice for I-130

NVC JOURNEY

12-Mar-09 NVC Received File

17-Mar-09 Emailed DS 3032 to NVC

28-Mar-09 Received DS3032 and AOS Bill via email

28-Mar-09 Paid AOS Bill online - Status = In Process

29-Mar-09 Emailed scanned DS3032 & posted via snail mail

30-Mar-09 Received email that DS3032 was received by NVC and that IV Bill will be sent

31-Mar-09 Paid IV Bill

31-Mar-09 AOS Bill Status = PAID !!!

06-Apr-09 Hubby posted DS230 and AOS priority and certified

08-Apr-09 @11:04am - Item Delivered PORTSMOUTH NH 03801 04/08/09 11:02am

10-Apr-09 NVC AVR states documents received

17-Apr-09 AVR states Case Complete at NVC!!!

21-Apr-09 Expedite request approved

24-Apr-09 Case sent from NVC to Sydney Consulate

29-Apr-09 Medical Appointment - Passed, YIPPEE and Thank You God !

05-May-09 Interview scheduled at Sydney Consulate APPROVED!!!

16-May-09 - Arrived in USA!!!!

20-May-09 Got my SSN.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Morocco
Timeline
Hi,

We got approved on the 26th Feb 09. It has been two weeks today and the NVC has not received our file !!!! I have used the recorded service and spoken to an operator. Today she told me it could take up to 90 days for the USCIS to mail it to them - Can someone tell me how do they send it - On the back of a Snail across America????

I've been approved since the 20th of Feb and am still waiting...you're not the only one

I know I am not the only one.... I just can't wait anymore. I am over it! But thanks for replying. Really appreciate it. Keep in touch and let me know how when you know NVC have received yours, I too will let you know. Cheers!

same here I have been approved the same day as yours 26th of Feb, still waiting.

2006-01-06: Marriage

2008-12-05: I-130 Sent

2008-12-16: I-130 NOA1

2009-02-26: I-130 Approved ::::::::::: APPROVED :::

2009-03-13: NVC Received Case # Assigned (yes Friday the 13th)

2009-03-16: emailed ds-3032

2009-03-27: DS-3032 accepted

2009-03-28: AOS bill generated finally !!! by Email

2009-03-29: Pay I-864 Bill online

2008-03-31: Return Completed I-864

2009-03-31: AOS satus PAID

2009-03-31: Receive IV Bill

2009-03-31: Pay IV Bill

2009-04-01: IV Bill satus PAID

2009-04-02: Return completed DS-230 with documents

2009-04-05: NVC received I-864

2009-04-06: NVC received DS-230

2009-04-29 : Case completed

2009-05-21: medical exam

2009-05-27 : The Interview was .:: APPROVED ::.ALHAMDO LILLAH الحمد لله

2009-05-28: pick up a visa

2009-05-29: I'm flying to morocco

2009-06-10: US Entry Alhamdo LILLAH

( ومن آياته أن خلق لكم من أنفسكم أزواجا لتسكنوا إليها وجعل بينكم مودة ورحمة إن في ذلك لآيات لقوم يتفكرون )

Link to comment
Share on other sites

Hi,

We got approved on the 26th Feb 09. It has been two weeks today and the NVC has not received our file !!!! I have used the recorded service and spoken to an operator. Today she told me it could take up to 90 days for the USCIS to mail it to them - Can someone tell me how do they send it - On the back of a Snail across America????

I've been approved since the 20th of Feb and am still waiting...you're not the only one

I know I am not the only one.... I just can't wait anymore. I am over it! But thanks for replying. Really appreciate it. Keep in touch and let me know how when you know NVC have received yours, I too will let you know. Cheers!

same here I have been approved the same day as yours 26th of Feb, still waiting.

Cool. Well keep in touch and let us know when yours arrives at NVC and I will do the same.

Cheers!

USCIS JOURNEY

14-Sep-08 Sent I-130

23-Sep-08 Recieved NOA1

28-Oct-08 Received NOA1

09-Feb-09 Received RFE for I-130

16-Feb-09 Sent Evidence for I-130

26-Feb-09 Received email NOA2 Approved!

28-Feb-09 Received Approval notice for I-130

NVC JOURNEY

12-Mar-09 NVC Received File

17-Mar-09 Emailed DS 3032 to NVC

28-Mar-09 Received DS3032 and AOS Bill via email

28-Mar-09 Paid AOS Bill online - Status = In Process

29-Mar-09 Emailed scanned DS3032 & posted via snail mail

30-Mar-09 Received email that DS3032 was received by NVC and that IV Bill will be sent

31-Mar-09 Paid IV Bill

31-Mar-09 AOS Bill Status = PAID !!!

06-Apr-09 Hubby posted DS230 and AOS priority and certified

08-Apr-09 @11:04am - Item Delivered PORTSMOUTH NH 03801 04/08/09 11:02am

10-Apr-09 NVC AVR states documents received

17-Apr-09 AVR states Case Complete at NVC!!!

21-Apr-09 Expedite request approved

24-Apr-09 Case sent from NVC to Sydney Consulate

29-Apr-09 Medical Appointment - Passed, YIPPEE and Thank You God !

05-May-09 Interview scheduled at Sydney Consulate APPROVED!!!

16-May-09 - Arrived in USA!!!!

20-May-09 Got my SSN.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Morocco
Timeline
Hi,

We got approved on the 26th Feb 09. It has been two weeks today and the NVC has not received our file !!!! I have used the recorded service and spoken to an operator. Today she told me it could take up to 90 days for the USCIS to mail it to them - Can someone tell me how do they send it - On the back of a Snail across America????

I've been approved since the 20th of Feb and am still waiting...you're not the only one

I know I am not the only one.... I just can't wait anymore. I am over it! But thanks for replying. Really appreciate it. Keep in touch and let me know how when you know NVC have received yours, I too will let you know. Cheers!

same here I have been approved the same day as yours 26th of Feb, still waiting.

Cool. Well keep in touch and let us know when yours arrives at NVC and I will do the same.

Cheers!

how we're going to send DS-3032 be Email ??

2006-01-06: Marriage

2008-12-05: I-130 Sent

2008-12-16: I-130 NOA1

2009-02-26: I-130 Approved ::::::::::: APPROVED :::

2009-03-13: NVC Received Case # Assigned (yes Friday the 13th)

2009-03-16: emailed ds-3032

2009-03-27: DS-3032 accepted

2009-03-28: AOS bill generated finally !!! by Email

2009-03-29: Pay I-864 Bill online

2008-03-31: Return Completed I-864

2009-03-31: AOS satus PAID

2009-03-31: Receive IV Bill

2009-03-31: Pay IV Bill

2009-04-01: IV Bill satus PAID

2009-04-02: Return completed DS-230 with documents

2009-04-05: NVC received I-864

2009-04-06: NVC received DS-230

2009-04-29 : Case completed

2009-05-21: medical exam

2009-05-27 : The Interview was .:: APPROVED ::.ALHAMDO LILLAH الحمد لله

2009-05-28: pick up a visa

2009-05-29: I'm flying to morocco

2009-06-10: US Entry Alhamdo LILLAH

( ومن آياته أن خلق لكم من أنفسكم أزواجا لتسكنوا إليها وجعل بينكم مودة ورحمة إن في ذلك لآيات لقوم يتفكرون )

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: India
Timeline
Cool. Well keep in touch and let us know when yours arrives at NVC and I will do the same.

Cheers!

corinne from oz,

I hear you and feel the pain...After initial excitement of getting approved quickly, the whole attitude has died down for me. One of the VJ member who is also approved in first week of March posted that his lawyer said he'll hear back from NVC in April. I am still secretly hoping that we'll hear from NVC soon but not holding my breath anymore and working towards being patient and calm now :)

So, count me in :) Good luck to all...

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

it takes like a month and half to receive ur packet 4 once u get approved well thats what happened to meour case was approved in dec and got packet four like the 3rd week of jan and got interview in feb!

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: India
Timeline
it takes like a month and half to receive ur packet 4 once u get approved well thats what happened to meour case was approved in dec and got packet four like the 3rd week of jan and got interview in feb!

mina saini,

I think most of us are not even at that point. We're just waiting to get a case # assigned so we can start with DS-3032 and AOS stuff..

IR-5 - for Mom
------------
08/27/2012 - Sent Application
08/28/2012 - NOA1 date
08/31/2012 - Received email from USCIS saying the package is accepted
09/11/2012 - Received a letter saying case transferred Lee's Summit, MO
02/15/2013 - Received an email saying case is approved
02/22/2013 - I-130 NOA2 hard copy received

NVC Journey
--------------
02/18/2013 - NVC received the case
03/11/2013 - NVC case # assigned
03/12/2013 - Petitioners' email corrected, Beneficiary's email added
03/13/2013 - DS3032 received
03/13/2013 - DS3032 email sent (was sent before the we received the DS3032)
03/13/2013 - AOS fee invoiced and Paid (shows In Progress)
03/14/2013 - AOS fee shows PAID
03/14/2013 - AOS package sent (overnight next-day delivery)
03/15/2013 - AOS package delivered to NVC on 03/15/2013 at 10:06:00
03/19/2013 - Re-sent DS-3032 email with Supervisor Review on subject
03/21/2013 - DS-3032 accepted
03/22/2013 - IV fee invoiced and paid
03/25/2013 - IV fee shows PAID
03/25/2013 - IV package sent (overnight next-day delivery)
03/26/2013 - IV package delivered to NVC on 03/26/2013 at 10:04am
03/27/2013 - AOS accepted
04/08/2013 - IV checklist found out by phone - NVC lost our marriage certificate sad.png
04/09/2013 - IV checklist email received
04/16/2013 - IV Checklist response mailed - new Marriage Certificate

04/16/2013 - Case Complete (they found our first marriage certificate during supervisor review??)
04/17/2013 - NVC received IV Checklist response
04/23/2013 - Case Complete email from NVC

05/13/2013 - Medical

06/03/2013 - Interview

Thank you God!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

oops my bad! for some reason i thought the case was approved and was going to the beneficiary. well u should get that within 2 weeks for it to be send home. i got mine within a week including weekends. best of luck all!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

Mine was approved FEB 19th and I recieved the letter about 3 or 4 days later from the NVC. I have how ever sent in the DS-3032 two weeks ago and have no heard a thing from them . So who knows if they even got it

Link to comment
Share on other sites

Hi,

We got approved on the 26th Feb 09. It has been two weeks today and the NVC has not received our file !!!! I have used the recorded service and spoken to an operator. Today she told me it could take up to 90 days for the USCIS to mail it to them - Can someone tell me how do they send it - On the back of a Snail across America????

I've been approved since the 20th of Feb and am still waiting...you're not the only one

I know I am not the only one.... I just can't wait anymore. I am over it! But thanks for replying. Really appreciate it. Keep in touch and let me know how when you know NVC have received yours, I too will let you know. Cheers!

same here I have been approved the same day as yours 26th of Feb, still waiting.

Cool. Well keep in touch and let us know when yours arrives at NVC and I will do the same.

Cheers!

how we're going to send DS-3032 be Email ??

here you go.

http://www.visajourney.com/wiki/index.php/Jame%27s_Shortcut

I-130 Journey

USCIS

06-15-2008 : Marriage

08-16-2008 : I-130 Sent

08-18-2008 : I-130 Received

08-22-2008 : I-130 NOA1

02-02-2009 : I-130 NOA2 Approved 164 days from NOA1

NVC

02-04-2009 : Visited my wife for 2 weeks. 02-22-2009 come back to US

02-11-2009 : Received package from NVC

02-23-2009 : AOS Paid $70 (Online)

02-23-2009 : DS-3032 sent (by email)

02-25-2009 : Payment Received from my bank (AOS)

03-04-2009 : NVC has received the Choice of Agent DS-3032 (Online)

03-04-2009 : IV Application Processing Fees $400 (Online)

03-05-2009 : Payment Received from my bank (IV APS)

03-07-2009 : DS-230, and I-864 Sent (by USPS)

03-12-2009 : USPS confirm arrived at NVC for DS-230, & I-864

03-13-2009 : NVC received DS-230, & I-864 (Case in progress)

03-20-2009 : NVC case completed in 1 week NVC completed 03-20-2009.

04-02-2009 : NVC Left to HCM city

04-22-2009 : Medical Passed

05-12-2009 : Received a package IV from HCM Consulate by email

05-18-2009 : My wife got Pink.. yeah..

05-26-2009 : Visa received

06-18-2009 : US Entry!!! Yeah, my wife finally here.

06-29-2009 : Received SSN from snail mail

07-20-2009 : Green card received by mail

09-15-2009 : Writting test from DVM.

11-03-2009 : Driving Test.

01-20-2010 : Working.

04-20-2011 : Submit I751

04-26-2011 : Received I-797 NOA with Receipt Number

05-11-2011 : Received ASC Appointment Notice

06-03-2011 : Biometrics Apts @ 11:00 AM

10-11-2011 : Submit more evidence.

Link to comment
Share on other sites

things you can do while waiting for your case number to be assigned is to download the AOS( I-864) the DS-230 and get those filled out and start collecting the needed documents. It will help you fly through NVC and gives you something to do instead of watching the mail box. That is best suggestion i can give. Review the short cuts listed on the wiki link

IR-1 / CR-1 Visa

Event Date

Service Center : California Service Center

Consulate : Manila, Philippines

Marriage : 2007-05-10

I-130 Sent : 2008-06-30

I-130 NOA1 : 2008-07-09

I-130 Approved : 2009-01-27

NVC Received : 2009-02-02

Received DS-3032 / I-864 Bill : 2009-02-11

DS-3032 E-Mail accepted: 2009-02-11

Pay I-864 Bill 2009-02-14

Receive I-864 Package : 2009-02-14

Return Completed I-864 : 2009-02-18

Return Completed DS-3032 : 2009-02-11

IV Bill generated: 2009-02-11

Receive IV Bill : 2009-02-14

Pay IV Bill : 2009-02-14

Receive Instruction Package : 2009-02-18

NVC received both packages: 2009-02-20

DS-230 & I-864 scanned NVC: 2009-02-23

Case Completed at NVC : 2009-02-26

Interview confirmed: 2009-02-27

NVC Left : 2009-03-06

Consulate Received : 2009-03-09

Medical completed: 2009-03-20

Interview Date : 2009-04-03

Visa Received : 2009-04-07

US Entry : 2009-05-10

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

Remember they got snowed in a few days!!!

USCIS

12/03/2008...Sent I-130 form

12/04/2008...Papers reached Chicago LockBox (1Day)

12/11/2008...NOA1 (7days)

12/22/2008...NOA1 hard copy received (11 days ~ Heavy Snowfall Delayed Mail)

03/14/2009...NOA2 (92 days from NOA1)

03/24/2009...NOA2 Hard copy received (No touches or web approval)

NVC

04/06/2009...Received by NVC (23 days from NOA2)

DreAlphaBettas@aol.com

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...