Jump to content
desotoman

NVC slow as molasses

 Share

Trick the NVC  

18 members have voted

  1. 1. The NVC says I must wait 90 days before they will look for my approved application. It was sent to them over 6 weeks ago and it is still not in their computer. Should I tell them the receipt date is over 90 days old so they will look for it?

    • Tell them the date is earlier to get the ball rolling and hope they don't punish me later.
      4
    • Be patient and hope the application is just in the middle of a large stack.
      14


24 posts in this topic

Recommended Posts

Filed: K-1 Visa Country: China
Timeline

i got my NOA2 about my K1 Fiance(e) visa from the USCIS over 6 weeks ago and everyday i call the NVC, they still have no record of my case. Everytime they say they must wait 90 days before they can take action. If they really have no record of my case, i can tell them the receipt date was 90 days ago, then they will actually start to look for it. I asked the last operator i talked to about this. I said, "so, if i call back next week and say it has been 90 days, what will happen?" she replied that as long as the receipt date is over 90 days ago, they will start to look for the case. but, the only thing i am worried about is after they track it down, they put a hold on it when they realized i lied about the date.

i'll actually be in china when the 90 days are up, and won't be able to make a long-distance call to america or come back to america until another 60 days. maybe they will and maybe they won't screw me over if i trick them. what does everybody think about this? according to everyone else's timeline, my file should already be in china, and maybe at my fiance(e)'s place 6 weeks after the NOA2. let's hear some opinions.

K1 Visa dates

03-06-2005 received first e-mail from girl asking if i can speak chinese

05-19-2005 met her while in china

12-12-2005 returned to propose to her in china

01-20-2006 I-129F Sent to TSC (then forwarded to CSC)

01-23-2006 I-129F NOA1

04-14-2006 I-129F NOA2

07-07-2006 Received and processed by NVC and sent to Guangzhou same day

09-15-2006 P3 received at apartment

09-18-2006 P3 sent off

09-20-2006 P3 received at embassy

10-20-2006 P4 received

11-22-2006 Interview passed and visa received

Link to comment
Share on other sites

Have you called the 1800 # for USCIS....not that you will likely get any better of a response. But keep on them.

You can find me on FBI

An overview of Security Name Checks And Administrative Review at Service Center, NVC & Consulate levels.

Detailed Review USCIS Alien Security Checks

fb2fc244.gif72c97806.gif4d488a91.gif

11324375801ij.gif

View Timeline HERE

I am but a wench not a lawyer. My advice and opinion is just that. I read, I research, I learn.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Brazil
Timeline

It's work days.



* K1 Timeline *
* 04/07/06: I-129F Sent to NSC
* 10/02/06: Interview date - APPROVED!
* 10/10/06: POE Houston
* 11/25/06: Wedding day!!!

* AOS/EAD/AP Timeline *
*01/05/07: AOS/EAD/AP sent
*02/19/08: AOS approved
*02/27/08: Permanent Resident Card received

* LOC Timeline *
*12/31/09: Applied Lifting of Condition
*01/04/10: NOA
*02/12/10: Biometrics
*03/03/10: LOC approved
*03/11/10: 10 years green card received

* Naturalization Timeline *
*12/17/10: package sent
*12/29/10: NOA date
*01/19/11: biometrics
*04/12/11: interview
*04/15/11: approval letter
*05/13/11: Oath Ceremony - Officially done with Immigration.

Complete Timeline

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Brazil
Timeline

You have to keep calling and saying how long it's been and if please they'd look into it.

(Puerto Rico) Luis & Laura (Brazil) K1 JOURNEY
04/11/2006 - Filed I-129F.
09/29/2006 - Visa in hand!

10/15/2006 - POE San Juan
11/15/2006 - MARRIAGE

AOS JOURNEY
01/05/2007 - AOS sent to Chicago.
03/26/2007 - Green Card in hand!

REMOVAL OF CONDITIONS JOURNEY
01/26/2009 - Filed I-751.
06/22/2009 - Green Card in hand!

NATURALIZATION JOURNEY
06/26/2014 - N-400 sent to Nebraska
07/02/2014 - NOA
07/24/2014 - Biometrics
10/24/2014 - Interview (approved)

01/16/2015 - Oath Ceremony


*View Complete Timeline

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Russia
Timeline

I'm curious and wonder if you'd share some info.

Your I-129F went first to the TSC.

Did they transfer it to the CSC?

How does your I-767C read at the bottom? From California or Texas?

And your I-767, the NOA2?

Above your Fiancee's name is there an "A" number [the Alien Number] assigned?

I assume you press number 2 for K visas when calling the NVC 603-334-0700 and wait for a live operator.

They ask you for your Receipt number, right? Not the automated system; that doesn't work for K visas; you must speak to a live person.

Six weeks should be about right for China to have it.

You'd not be the first who posted here about no info and then it shows up at the fiance(e)'s mail with Packet 3.

I hope that's your case!

Larry and Maria

Link to comment
Share on other sites

Filed: K-1 Visa Country: Switzerland
Timeline
I'm curious and wonder if you'd share some info.

Your I-129F went first to the TSC.

Did they transfer it to the CSC?

How does your I-767C read at the bottom? From California or Texas?

And your I-767, the NOA2?

Above your Fiancee's name is there an "A" number [the Alien Number] assigned?

I assume you press number 2 for K visas when calling the NVC 603-334-0700 and wait for a live operator.

They ask you for your Receipt number, right? Not the automated system; that doesn't work for K visas; you must speak to a live person.

Six weeks should be about right for China to have it.

You'd not be the first who posted here about no info and then it shows up at the fiance(e)'s mail with Packet 3.

I hope that's your case!

First, did the NVC received it?? if not, then it might be the same problem we got with out petition, we are waiting since 5 weeks that the petition is at the NVC!! what u can do, i e mailed to the CSC, it will be as well the CSC with u, and sent them a e mail to ask where is our petition, and told them the NVC was asking the exact date when it was sent to them.... finally, after sending 3 emails to them, and after alot of usless replies, i got the answer, that the petitons are sent in big bulks, so it can take long sometimes until they send them away... he promised me to look for our petition, and check what date it was sent to NVC. so i guess its best to start from the service center, to find out, when it has left there.. then, step by step. Good luck!

K1 TIMELINE

2/10/2006 I-129f sent to TSC

2/13/2006 they received it

2/16/2006 guess it was fowarded to CA, so they got it that date

2/21/2006 check finally cashed

2/23/2006 NOA1 received

5/01/2006 NOA2

5/30/2006 e mail from CSC: petition was requested for review!! ????

5/31/2006 another e mail reply: petition was approved but has not been fowarded yet

6/15/2006 finally!!!! Petition received by NVC!

6/16/2006 left NVC

6/22/2006 US Embassy in Bern, Swiss rec'd petition

6/28/2006 rec'd paket 3

6/29/2006 sent paket 3 back

7/13/2006 got interview date!!

7/27/2006 Interview! APPROVED!!!!! YEAH!

9/18/2006 Planed flight to Raleigh/ NC........

11/18/2006 WEDDING DAY!

AOS

12/14/2006 AOS receipt date

01/18/2007 Biometrics in Charlotte

01/16/2007 Sent additional information (proof of income, ect) for AOS

01/29/2007 Case has been transfered to CSC ( in order to speed up processing.....)

02/17/2007 E mail from CSC... they received case...!!!??? (wooow....long journey..)

02/26/2007 E mail notification: Card production ordered! YEAH!

02/27/2007 E mail notification: Notice mailed welcoming the new resident!!GRATE!and without

interview!!!!!

03/04/2007 GREENCARD IN MAIL, YEAH!!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Canada
Timeline

  • I'm in the same situation, and it's becoming very frustrating.
    Out of the 72 K-1's with NOA2s after April 1st, 2006 here at VisaJourney, here is a table of all the ones who have yet to hear anything after the NOA2 stage (provided everyone has updated their timelines).
    names9tb.jpg
    (It is sorted in order of NOA2 date.)
    My fiance and I take turns calling the NVC every day. (603-334-0700)
    I have had them search using my CIS number (starts with WAC...)
    I have had them search using the applicant and beneficiary names.
    I've asked them what their procedures are when receiving mail. (And was told that the barcode gets scanned as soon as it arrives, but that doesn't sound right, according to what some others here at VisaJourney have said.)
    Today is Day 47 since our NOA2, so we are half-way to that magical number of 90 days.
    (I still hold out hope that packet 3 will arrive at my door miraculously, without prior notice.)
    What makes no sense is that even if they are sent in batches, these lost Visas above are spread out pretty well.
    Goldie, please PM me and let us know when you hear anything back from that person.
    Anyone on that list who has advanced in the process but forgotten to fill in their timeline, please do so.

Edited by JEDI

  • adamlovesamber4ha.gif

Timeline

--------------------

January 19 2006 I-129F sent to TSC (Day 1)

- (Subsequently transferred to CSC)

January 27 2006-NOA1 (Day 9)

January to April - Tried to keep her patient and calm as we waited!

April 17 2006 - NOA2 (Day 89)

... 91 days ...

July 17 2006 - NVC ~ After 91 days, FINALLY received by NVC! (Day 180)

July 21 to August 8 2006 - Flew down to visit Amber in Florida (ZERO problems at border)

Jul 25 2006 - Packet 3 received

August - ABANDONED PROCESS

How many DAYS has it been since you sent in your application?

Find out here: http://www.timeanddate.com/date/duration.html

Link to comment
Share on other sites

Filed: K-1 Visa Country: Switzerland
Timeline
  • I'm in the same situation, and it's becoming very frustrating.
    Out of the 72 K-1's with NOA2s after April 1st, 2006 here at VisaJourney, here is a table of all the ones who have yet to hear anything after the NOA2 stage (provided everyone has updated their timelines).
    names9tb.jpg
    (It is sorted in order of NOA2 date.)
    My fiance and I take turns calling the NVC every day. (603-334-0700)
    I have had them search using my CIS number (starts with WAC...)
    I have had them search using the applicant and beneficiary names.
    I've asked them what their procedures are when receiving mail. (And was told that the barcode gets scanned as soon as it arrives, but that doesn't sound right, according to what some others here at VisaJourney have said.)
    Today is Day 47 since our NOA2, so we are half-way to that magical number of 90 days.
    (I still hold out hope that packet 3 will arrive at my door miraculously, without prior notice.)
    What makes no sense is that even if they are sent in batches, these lost Visas above are spread out pretty well.
    Goldie, please PM me and let us know when you hear anything back from that person.
    Anyone on that list who has advanced in the process but forgotten to fill in their timeline, please do so.

Oh my God, that sucks... they say realy 90 days?? are they mad in their brains? after waiting so long time just ot get NOA2, now another 3 month wait??? no! :crying:

i dont know why i am not in the list there, tony and sibylle, beneficary switzerland, NOA2 on the 1. of may...

JEDI, as soon i will hear from this magical person at the service center, i will post it to u and all. i somehow have the feeling he just told me this to shut me up... then, i wonder.... how long does it take, just to check in a pc when a petition has left the center????? :blink:

well, maybee all those petitions are just forgotten at the service center.. it doesnt make any sense, why only some few ones remain there and are not sent away... no sense at all!!!!! :(

K1 TIMELINE

2/10/2006 I-129f sent to TSC

2/13/2006 they received it

2/16/2006 guess it was fowarded to CA, so they got it that date

2/21/2006 check finally cashed

2/23/2006 NOA1 received

5/01/2006 NOA2

5/30/2006 e mail from CSC: petition was requested for review!! ????

5/31/2006 another e mail reply: petition was approved but has not been fowarded yet

6/15/2006 finally!!!! Petition received by NVC!

6/16/2006 left NVC

6/22/2006 US Embassy in Bern, Swiss rec'd petition

6/28/2006 rec'd paket 3

6/29/2006 sent paket 3 back

7/13/2006 got interview date!!

7/27/2006 Interview! APPROVED!!!!! YEAH!

9/18/2006 Planed flight to Raleigh/ NC........

11/18/2006 WEDDING DAY!

AOS

12/14/2006 AOS receipt date

01/18/2007 Biometrics in Charlotte

01/16/2007 Sent additional information (proof of income, ect) for AOS

01/29/2007 Case has been transfered to CSC ( in order to speed up processing.....)

02/17/2007 E mail from CSC... they received case...!!!??? (wooow....long journey..)

02/26/2007 E mail notification: Card production ordered! YEAH!

02/27/2007 E mail notification: Notice mailed welcoming the new resident!!GRATE!and without

interview!!!!!

03/04/2007 GREENCARD IN MAIL, YEAH!!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: China
Timeline

well, on one of my routine calls to the damn NVC, of which i get new information each time, i was told that there is really not a chance that the NVC has my case yet, even though it has been 7 weeks since the NOA2 date. This operator told me that as soon as the cases come in, which is by bulk, they are entered into the computer and processed that same day. This is contrary to what I have been told before, but makes more sense than my case has been sitting on someone's desk for over a month now.

She also told me that after the mandatory 90 day waiting period for missing cases, the only action taken is a letter to the service station who originally processed my case notifying them that it has been 90 days and the NVC has not received my case yet. So, after the 90 day period, of which i will be out of the country for that and the two following months, i have to fax the NVC my NOA2 letter and then they will send that and a letter confirming it back to the original service center, whether it is California or Texas, since i think my case got transferred to california from texas.

Now i'm just really pissed off. and i just called the 1-800 USCIS customer service hotline, and because the wait is more than 30 minutes, they hung up on me and told me to call back. I would say that i could wait 30 minutes on the phone for the most important thing in my life if i have been waiting almost 5 months already. jerks.

does anybody else just have a hopeless feeling??? my NOA2 date was April 14, 2006 and my application is lost :(

K1 Visa dates

03-06-2005 received first e-mail from girl asking if i can speak chinese

05-19-2005 met her while in china

12-12-2005 returned to propose to her in china

01-20-2006 I-129F Sent to TSC (then forwarded to CSC)

01-23-2006 I-129F NOA1

04-14-2006 I-129F NOA2

07-07-2006 Received and processed by NVC and sent to Guangzhou same day

09-15-2006 P3 received at apartment

09-18-2006 P3 sent off

09-20-2006 P3 received at embassy

10-20-2006 P4 received

11-22-2006 Interview passed and visa received

Link to comment
Share on other sites

Filed: K-1 Visa Country: Switzerland
Timeline
well, on one of my routine calls to the damn NVC, of which i get new information each time, i was told that there is really not a chance that the NVC has my case yet, even though it has been 7 weeks since the NOA2 date. This operator told me that as soon as the cases come in, which is by bulk, they are entered into the computer and processed that same day. This is contrary to what I have been told before, but makes more sense than my case has been sitting on someone's desk for over a month now.

She also told me that after the mandatory 90 day waiting period for missing cases, the only action taken is a letter to the service station who originally processed my case notifying them that it has been 90 days and the NVC has not received my case yet. So, after the 90 day period, of which i will be out of the country for that and the two following months, i have to fax the NVC my NOA2 letter and then they will send that and a letter confirming it back to the original service center, whether it is California or Texas, since i think my case got transferred to california from texas.

Now i'm just really pissed off. and i just called the 1-800 USCIS customer service hotline, and because the wait is more than 30 minutes, they hung up on me and told me to call back. I would say that i could wait 30 minutes on the phone for the most important thing in my life if i have been waiting almost 5 months already. jerks.

does anybody else just have a hopeless feeling??? my NOA2 date was April 14, 2006 and my application is lost :(

well, we are totaly in the same f....ed up boat.... eveni am so damn pissed off.. sorry.. but even our petiton was over 6 weeks ago approved.. and then NVC has not got it up to now.. what a hell is this country! the world power USA! where people are not even able to make a damn call to a worker and ask whats going on! even in the deepest bush in africa, u can get information.. wow. yes, am pissed of like hell. am just not usedand will never be, to be treated like a peace of s.... if it wouldnt be love, i would leave this world power continent since long time by side, and would go on with my at least understanding life here in switzerland. sorry, this is just not how people should be treated! i ve wrote yesterday again another e mail to the CSC to this misterious mr mc clellan... i begged him, i asked him thousand times for help, just to find out for me, when the petition has been sent, or if it has never been sent.. only this.. a work of 1 minute to check in the computer. now, i got another answer, after he promised me last week, to make a so called system check.. WOW!! :thumbs: all he wrote me was, he hasnt got yet the answer from the system check, and then:PLEASE ALLOW 30 DAYS FOR THIS ACTION TO OCCUR!!!!!!!!!! oh my Godness! 30 days, for only check into the computer if or when this or that petiton has left the csc!!!!!! soon they can bring me to a mad house. very soon......... i cant beleive, i think am in a very very wrong movie, in a very horrible dream, a nightmare. i guess i will leave how things are, i will give up, whatever, when then NVC will get the petition, or never, pufff... no chance, no help. maybee in 1 month, 1 year, or never... all to hell in this service centers.. and no sorry this time. :dead:

only sorry if somebody is shocked with my writings..

K1 TIMELINE

2/10/2006 I-129f sent to TSC

2/13/2006 they received it

2/16/2006 guess it was fowarded to CA, so they got it that date

2/21/2006 check finally cashed

2/23/2006 NOA1 received

5/01/2006 NOA2

5/30/2006 e mail from CSC: petition was requested for review!! ????

5/31/2006 another e mail reply: petition was approved but has not been fowarded yet

6/15/2006 finally!!!! Petition received by NVC!

6/16/2006 left NVC

6/22/2006 US Embassy in Bern, Swiss rec'd petition

6/28/2006 rec'd paket 3

6/29/2006 sent paket 3 back

7/13/2006 got interview date!!

7/27/2006 Interview! APPROVED!!!!! YEAH!

9/18/2006 Planed flight to Raleigh/ NC........

11/18/2006 WEDDING DAY!

AOS

12/14/2006 AOS receipt date

01/18/2007 Biometrics in Charlotte

01/16/2007 Sent additional information (proof of income, ect) for AOS

01/29/2007 Case has been transfered to CSC ( in order to speed up processing.....)

02/17/2007 E mail from CSC... they received case...!!!??? (wooow....long journey..)

02/26/2007 E mail notification: Card production ordered! YEAH!

02/27/2007 E mail notification: Notice mailed welcoming the new resident!!GRATE!and without

interview!!!!!

03/04/2007 GREENCARD IN MAIL, YEAH!!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: China
Timeline

AH!!!

I got a hold after waiting half an hour with a USCIS operator, they said the I129F Fiance visas are supposed to go straight to the embassy and the letter i got from them was wrong. I told her she must be mistaken, but then she told me she had been working there for 3 years and that was standard procedure. Now I don't know what to think, but it does remind me of people saying they were surprised that their application was suddenly received at their embassy. I'll just call Guangzhou tomorrow, or later tonight and find out what the hell. Maybe all this worrying should have been directed in china's general direction and not at the incompetency of US government workers.

K1 Visa dates

03-06-2005 received first e-mail from girl asking if i can speak chinese

05-19-2005 met her while in china

12-12-2005 returned to propose to her in china

01-20-2006 I-129F Sent to TSC (then forwarded to CSC)

01-23-2006 I-129F NOA1

04-14-2006 I-129F NOA2

07-07-2006 Received and processed by NVC and sent to Guangzhou same day

09-15-2006 P3 received at apartment

09-18-2006 P3 sent off

09-20-2006 P3 received at embassy

10-20-2006 P4 received

11-22-2006 Interview passed and visa received

Link to comment
Share on other sites

Filed: K-1 Visa Country: Switzerland
Timeline
AH!!!

I got a hold after waiting half an hour with a USCIS operator, they said the I129F Fiance visas are supposed to go straight to the embassy and the letter i got from them was wrong. I told her she must be mistaken, but then she told me she had been working there for 3 years and that was standard procedure. Now I don't know what to think, but it does remind me of people saying they were surprised that their application was suddenly received at their embassy. I'll just call Guangzhou tomorrow, or later tonight and find out what the hell. Maybe all this worrying should have been directed in china's general direction and not at the incompetency of US government workers.

no, i beleive what this lady told u is not correct at all!! even if shes there for 3 or 20 years. ALL THE PETITIONS OF K1 have to go to theNVC first! there they get a case number. even the NVC centers know this and are aware about. this peoples on the service centers have acctually no clue about how things work. only if u e mail them, u will get a real worker. those on phone are only there for common questions. so, still a whole mess all this...... and no solution at all.

K1 TIMELINE

2/10/2006 I-129f sent to TSC

2/13/2006 they received it

2/16/2006 guess it was fowarded to CA, so they got it that date

2/21/2006 check finally cashed

2/23/2006 NOA1 received

5/01/2006 NOA2

5/30/2006 e mail from CSC: petition was requested for review!! ????

5/31/2006 another e mail reply: petition was approved but has not been fowarded yet

6/15/2006 finally!!!! Petition received by NVC!

6/16/2006 left NVC

6/22/2006 US Embassy in Bern, Swiss rec'd petition

6/28/2006 rec'd paket 3

6/29/2006 sent paket 3 back

7/13/2006 got interview date!!

7/27/2006 Interview! APPROVED!!!!! YEAH!

9/18/2006 Planed flight to Raleigh/ NC........

11/18/2006 WEDDING DAY!

AOS

12/14/2006 AOS receipt date

01/18/2007 Biometrics in Charlotte

01/16/2007 Sent additional information (proof of income, ect) for AOS

01/29/2007 Case has been transfered to CSC ( in order to speed up processing.....)

02/17/2007 E mail from CSC... they received case...!!!??? (wooow....long journey..)

02/26/2007 E mail notification: Card production ordered! YEAH!

02/27/2007 E mail notification: Notice mailed welcoming the new resident!!GRATE!and without

interview!!!!!

03/04/2007 GREENCARD IN MAIL, YEAH!!!!!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline
AH!!!

I got a hold after waiting half an hour with a USCIS operator, they said the I129F Fiance visas are supposed to go straight to the embassy and the letter i got from them was wrong. I told her she must be mistaken, but then she told me she had been working there for 3 years and that was standard procedure. Now I don't know what to think, but it does remind me of people saying they were surprised that their application was suddenly received at their embassy. I'll just call Guangzhou tomorrow, or later tonight and find out what the hell. Maybe all this worrying should have been directed in china's general direction and not at the incompetency of US government workers.

Many people have been told this by uninformed USCIS employees. But I can guarantee you, regardless of what the USCIS misinformation line person told you, I-129F's DO go through the NVC.

Link to comment
Share on other sites

Filed: K-1 Visa Country: United Kingdom
Timeline

AH!!!

I got a hold after waiting half an hour with a USCIS operator, they said the I129F Fiance visas are supposed to go straight to the embassy and the letter i got from them was wrong. I told her she must be mistaken, but then she told me she had been working there for 3 years and that was standard procedure. Now I don't know what to think, but it does remind me of people saying they were surprised that their application was suddenly received at their embassy. I'll just call Guangzhou tomorrow, or later tonight and find out what the hell. Maybe all this worrying should have been directed in china's general direction and not at the incompetency of US government workers.

no, i beleive what this lady told u is not correct at all!! even if shes there for 3 or 20 years. ALL THE PETITIONS OF K1 have to go to theNVC first! there they get a case number. even the NVC centers know this and are aware about. this peoples on the service centers have acctually no clue about how things work. only if u e mail them, u will get a real worker. those on phone are only there for common questions. so, still a whole mess all this...... and no solution at all.

Not sure if this works for all embassies but for London (I would assume is same for all) that once you get your NOA2 the hard copy of your packet goes to NCS and a electronic version goes to the embassy. The embassy will send out packet 3 based on that notification. Once they get the hard copy and your return required paperwork they then schedule interview and send out packet 4

June 05 Lisa and I fall in love

15 Mar 06 I-129F received at CSC NOA1

5 Aug 06 NOA2 after 143 days in CSC purgatory

20 Oct 06 Interview Date

16 Feb 07 Denial Letter received

12 Mar 07 Motion to reconsider submitted

10 Sep 07 Motion to Reconsider denied

9 May 08 Lisa and Married in United Kingdom

23 May 08 I-130 filed

Oct 08 NOA-2 received

May 7 09 Lisa's Interview I 601 filed

29 Jul 09 I-601 waiver approved

18 Aug 09 Passport to London Embassy

20 Aug 09 Tickets purchased for 10 Sep 09

WE HAVE FINALLY WON, OUR LONG AND HARD JOURNEY IS COMPLETE!!!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Canada
Timeline

Right.

The K-1's HAVE to go through NVC.

NVC assigns the case number based on which consulate they will ship it to.

That is why some Canadaians end up with numbers starting with MON instead of VAN, because NVC sends them to MONtreal instead of VANcouver. But then Montreal transfers them to Vancouver, only they keep the same number.

By coincidence, I also called the NVC about my case earlier today, and was told, for the FIRST time, exactly what they told you. I asked them "What happens after 90 days, meaning that if I call on day 91, and say it has been 91 days already, what happens next?". The operator told me that I would be asked to fax them my approval notice, and that they would start to "look for it". Ridiculous.

I mean, we all KNOW that it is supposed to be around 2 to 4 weeks, and that it can SOMETIMES take 90 days, but there are so many of us now that I am starting to think that there is a box in the CSC mailroom that they are using as a footstool, that contains all our applications.

I am a very patient person, and even I am starting to become frustrated.

I think we might have spoken to the same lady, because she ALSO told me that I should be able to check my case status through the automated system BEFORE it gets processed, because they enter the CIS numbers as soon as the applications are received, before processing. (But I find it hard to believe her after what everyone else here has been through. Still, maybe it is a recent change?)

Alright, everybody, I know it will be hard, but STAY POSITIVE, ok?!

  • adamlovesamber4ha.gif

Timeline

--------------------

January 19 2006 I-129F sent to TSC (Day 1)

- (Subsequently transferred to CSC)

January 27 2006-NOA1 (Day 9)

January to April - Tried to keep her patient and calm as we waited!

April 17 2006 - NOA2 (Day 89)

... 91 days ...

July 17 2006 - NVC ~ After 91 days, FINALLY received by NVC! (Day 180)

July 21 to August 8 2006 - Flew down to visit Amber in Florida (ZERO problems at border)

Jul 25 2006 - Packet 3 received

August - ABANDONED PROCESS

How many DAYS has it been since you sent in your application?

Find out here: http://www.timeanddate.com/date/duration.html

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...