Jump to content
sgr

DONOT RELY ON AVR (nvc ) MESSAGES

 Share

17 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: India
Timeline

hey guys I was going through NVC journey since 8/13/08.Today I paid IV fee bill status changed from 'invoiced" to IN PROCESS" .but still AVR says they received aos fee bill "no messages of generation of forms".please look at my NVC journey i just followed my best guess by using LOTO 's guide and talking to live reps on phone which will save lot of time rather waiting for AVR messages'

1) when can i mail DS230 with documents ? is it ok mail 1-2 days after online IV fee bill status changed to "paid"

11/25/07 Marriage

Vermont Service center

USCIS Journey CR1/IR1

01/06/08 Sent I-130

01/08/08 I-130 received at chicago lock box (USPS)

02/08/08 NOA1 Notice Date

02/12/08 Received NOA1 hardcopy

08/11/08 Received approval email (after 7 months and 3 days...Waiting)

08/15/08 Received NOA2 hardcopy

NVC Journey

08/13/08 NVC case# assigned

08/19/08 DS-3032 e mail sent and got auto response

08/20/08 Received IIN#(one nice rep gave me number)

08/22/08 paid I-864 bill online

08/23/08 I-864 bill status "PAID" online(saturday) but AVR message says " case number assigned ....blah

08/23/08 Printed out I-864 package online and Barcode sheet

08/25/08 I-864 package sent overnight

08/25/08 DS3032 Hardcopy sent by express mail (Hopefully they accept it ..But AVR says AOS fee received/paid on 08/23/08)

08/26/08 I-864 package received per USPS

08/28/08 I-864 package entered into NVC system

08/27/08 NVC accepted DS-3032 (But AVR does not say that)

08/28/08 IV bill generated ( still AVR does NOT say that) but online INVOICE says "NOT PAID"

08/28/08 IV bill paid online "IN PROCESS" status

08/29/08 IV bill "PAID" status (AVR says , they received DS3032)

08/29/08 DS-230 generated

09/02/08 DS-230 and required documents mailed

09/03/08 DS-230 form arrives at NVC per usps

09/04/08 DS-230 information entered into NVC system

09/15/08 CASE COMPLETE(32 days no RFE)

10/15/08 sent to consulate

11/10/08 Medical PASSED

11/18/08 Interview....VISA GRANTED ...

US..

11/29/08 ..POE at Houston

12/15/08 ..Welcome letter

12/16/08 ..SSN received

12/29/08 Green card received

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Colombia
Timeline
hey guys I was going through NVC journey since 8/13/08.Today I paid IV fee bill status changed from 'invoiced" to IN PROCESS" .but still AVR says they received aos fee bill "no messages of generation of forms".please look at my NVC journey i just followed my best guess by using LOTO 's guide and talking to live reps on phone which will save lot of time rather waiting for AVR messages'

1) when can i mail DS230 with documents ? is it ok mail 1-2 days after online IV fee bill status changed to "paid"

You can send the DS-230 with the required documents when the NVC, either IVR, live rep or online, says that the DS-230 has been generated. You should never send anything ahead of time because it will cause delays in your process.

Diana

CR-1

02/05/07 - I-130 sent to NSC

05/03/07 - NOA2

05/10/07 - NVC receives petition, case # assigned

08/08/07 - Case Complete

09/27/07 - Interview, visa granted

10/02/07 - POE

11/16/07 - Received green card and Welcome to America letter in the mail

Removing Conditions

07/06/09 - I-751 sent to CSC

08/14/09 - Biometrics

09/27/09 - Approved

10/01/09 - Received 10 year green card

U.S. Citizenship

03/30/11 - N-400 sent via Priority Mail w/ delivery confirmation

05/12/11 - Biometrics

07/20/11 - Interview - passed

07/20/11 - Oath ceremony - same day as interview

Link to comment
Share on other sites

Filed: Other Country: Japan
Timeline

Like much of this process, the AVR is little more than a 'bad joke'.

It can NOT be relied upon.

They've generated and received our COA (DS-3032)

They've generated our IV bill

I've paid the AOS and IV bill

System still has the original message, "Your case was entered..."

If you want everything to take 4 to 6 weeks, then wait for the AVR updates.

If you want to move a little faster, talk to an operator.

If you want to fly through NVC, checkout James or Lotto's shortcuts (Links in the Wiki which is linked a the top of every page on VJ).

If you want to shoot yourself in the foot, start sending documents or payments out of sequence, before they've been generated, or incomplete.

Good luck and be careful out there.

LingChe NVC Guide

Using this guide may allow you to fly through NVC in as little as 11 days.

visajourney.com/wiki/index.php/LingChe_NVC_ShortCut

--------------------

Our Visa Journey

2006-11-01: Met online through common interest in music - NOT Dating Service

2007-01-28: Met in person in Paris

2007-10-02: Married in Tokyo

2008-07-05: I-130 Sent

2008-08-13: NOA2 I-130

2008-10-02: Case Complete at NVC

2008-11-04: Interview - CR-1 Visa APPROVED

2008-12-11: POE - Chicago

2009-01-12: GC and Welcome Letter

2010-09-01: Preparing I-751 Removal of Conditions

2011-03-22: Card Production Ordered

2011-03-30 10 Year Card Received DONE FOR 10 YEARS

Standard Disclaimer (may not be valid in Iowa or Kentucky, please check your local laws): Any information given should not be considered legal advice,

and is based on personal experience or personal knowledge. Sometimes there might not be any information at all in my posts. Sometimes it might just

be humor or chit-chat, or nonsense. Deal with it. If you can read this...you're too close. Step away from the LingLing

YES WE DID!

And it appears to have made very little difference.

.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline
hey guys I was going through NVC journey since 8/13/08.Today I paid IV fee bill status changed from 'invoiced" to IN PROCESS" .but still AVR says they received aos fee bill "no messages of generation of forms".please look at my NVC journey i just followed my best guess by using LOTO 's guide and talking to live reps on phone which will save lot of time rather waiting for AVR messages'

1) when can i mail DS230 with documents ? is it ok mail 1-2 days after online IV fee bill status changed to "paid"

I received 2 identical IV bills in the mail. One generated 8-16, another 8-18.

Both of them have IIN in them, online payment instructions, and state, that if I will pay online I have to wait until it changes from "in process" to "paid", then print cover page and mail 230 with docs immediately.

I never heard that 230 has to be generated prior to be send. But IV fee has to be paid and accepted, that is the only requirement.

Also this IV fee mail has instructions to pay by mail, and in this case you would have to send fee to St.Louis with the included payment coupon, then wait for a reply in the mail, only after that you can send 230.

So, the answer is you should send 230 as soon as you can print cover page online.

Do not wait. Nobody knows when or if you will get anything in the mail from them. Phone service rep told me I will not be getting anything in the mail because we paid AOS and IV fees online.

And AVR system is a joke, still says IV fee bill was generated on ... It does not update when they get 864 or IV fee. I guess next time they update is when they process and accept all docs, so I was told here on VJ.

Marriage : 2001-09-26

CSC:

I-130 Sent : 2008-03-01

I-130 NOA1 : 2008-03-12

I-130 Approved : 2008-07-24

NVC:

NVC Received: 2008-07-30

DS-3032 and AOS bill generated: 2008-08-04

DS-3032 e-mailed (with autoreply): 2008-08-05

AOS fee paid online: 2008-08-06

AOS fee received in AVR and online: 2008-08-07

DS-3032 accepted with e-mail notice: 2008-08-15

IV fee bill paid online: 2008-08-16

IV fee bill generated in AVR: 2008-08-18

IV fee bill Accepted (PAID online): 2008-08-19

I-864 Express Mailed: 2008-08-19

IV fee and 864 received at NVC, called to confirm: 2008-08-22

DS-230 Express Mailed to NVC: 2008-08-25

RFE issued (864): 2008-09-2, sent correction: 2008-09-03

RFE Checklist received: 2008-09-08

Case Complete: 2008-09-16

Link to comment
Share on other sites

Filed: Other Country: Japan
Timeline
hey guys I was going through NVC journey since 8/13/08.Today I paid IV fee bill status changed from 'invoiced" to IN PROCESS" .but still AVR says they received aos fee bill "no messages of generation of forms".please look at my NVC journey i just followed my best guess by using LOTO 's guide and talking to live reps on phone which will save lot of time rather waiting for AVR messages'

1) when can i mail DS230 with documents ? is it ok mail 1-2 days after online IV fee bill status changed to "paid"

I received 2 identical IV bills in the mail. One generated 8-16, another 8-18.

Both of them have IIN in them, online payment instructions, and state, that if I will pay online I have to wait until it changes from "in process" to "paid", then print cover page and mail 230 with docs immediately.

I never heard that 230 has to be generated prior to be send. But IV fee has to be paid and accepted, that is the only requirement.

Also this IV fee mail has instructions to pay by mail, and in this case you would have to send fee to St.Louis with the included payment coupon, then wait for a reply in the mail, only after that you can send 230.

So, the answer is you should send 230 as soon as you can print cover page online.

Do not wait. Nobody knows when or if you will get anything in the mail from them. Phone service rep told me I will not be getting anything in the mail because we paid AOS and IV fees online.

And AVR system is a joke, still says IV fee bill was generated on ... It does not update when they get 864 or IV fee. I guess next time they update is when they process and accept all docs, so I was told here on VJ.

When we speak of the DS-230 being generated, if you pay online we mean that you have paid the IV bill, system says "paid", you printed out the barcode cover letter, and the system is ready to accept the DS-230.

If you pay the IV bill through the mail, they do actually generate a DS-230 package which includes the barcode cover letter and DS-230 instructions.

So again, it's probably not a good idea to send the DS-230 before it's been generated...but absolutely as soon as it's been generated (assuming you have all the supporting documents).

LingChe NVC Guide

Using this guide may allow you to fly through NVC in as little as 11 days.

visajourney.com/wiki/index.php/LingChe_NVC_ShortCut

--------------------

Our Visa Journey

2006-11-01: Met online through common interest in music - NOT Dating Service

2007-01-28: Met in person in Paris

2007-10-02: Married in Tokyo

2008-07-05: I-130 Sent

2008-08-13: NOA2 I-130

2008-10-02: Case Complete at NVC

2008-11-04: Interview - CR-1 Visa APPROVED

2008-12-11: POE - Chicago

2009-01-12: GC and Welcome Letter

2010-09-01: Preparing I-751 Removal of Conditions

2011-03-22: Card Production Ordered

2011-03-30 10 Year Card Received DONE FOR 10 YEARS

Standard Disclaimer (may not be valid in Iowa or Kentucky, please check your local laws): Any information given should not be considered legal advice,

and is based on personal experience or personal knowledge. Sometimes there might not be any information at all in my posts. Sometimes it might just

be humor or chit-chat, or nonsense. Deal with it. If you can read this...you're too close. Step away from the LingLing

YES WE DID!

And it appears to have made very little difference.

.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline

Just called NVC operator. She said "I am not sure how AVR works or how and when it updates, or what is says.." ..

Nice :bonk:

But at she was able to confirm that both fees were accepted as of last week (paid online), and both packages were received (864 and 230) and "undergoing the review process which will take up to 2-4 weeks".

And again, conflicting info. Last week operator told me if there is any RFE or any communication needed I will get it via e-mail. The lady today said no, if anything needed I will get info by mail. Which scares me, since I never got anything from them until IV bill, which they generated twice, and I got two of them within 2 days.

At least now I can confirm that online payments even before they were generated in AVR, and sending docs immediately after "paid" works fine.

So for now another wait.

Anyone has any idea when and how they send RFE if any? If 864 was received at NVC and week passed, does it mean it's accepted without any problems or rfe? Kind of worried since I had to use assets and lots of paper....

Marriage : 2001-09-26

CSC:

I-130 Sent : 2008-03-01

I-130 NOA1 : 2008-03-12

I-130 Approved : 2008-07-24

NVC:

NVC Received: 2008-07-30

DS-3032 and AOS bill generated: 2008-08-04

DS-3032 e-mailed (with autoreply): 2008-08-05

AOS fee paid online: 2008-08-06

AOS fee received in AVR and online: 2008-08-07

DS-3032 accepted with e-mail notice: 2008-08-15

IV fee bill paid online: 2008-08-16

IV fee bill generated in AVR: 2008-08-18

IV fee bill Accepted (PAID online): 2008-08-19

I-864 Express Mailed: 2008-08-19

IV fee and 864 received at NVC, called to confirm: 2008-08-22

DS-230 Express Mailed to NVC: 2008-08-25

RFE issued (864): 2008-09-2, sent correction: 2008-09-03

RFE Checklist received: 2008-09-08

Case Complete: 2008-09-16

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

I got an RFE for my DS230 Wednesday I found out about it on the IVR. IVR says it was mailed to me...I can't be bothered to wait for them to mail it and me to receive it. So I spoke with operator to find out what it was. Then express mailed it Thursday. The IVR is "slow" this week...I think a day off. It didn't update until late in the day Wednesday and I didn't make it to the post office in time. *(#(*#$#(* But I express mailed the document and it is 1/2 way to Portsmouth as we speak...should be there by 10 am Friday morning. Hopefully I will have case complete by end of next week!

"Haters are confused admirers, they can’t be or figure you out so negativity comes out [their] mouth.”

-Chad Ochocinco "85" - WR Cincinnati Bengals

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline
I got an RFE for my DS230 Wednesday I found out about it on the IVR. IVR says it was mailed to me...I can't be bothered to wait for them to mail it and me to receive it. So I spoke with operator to find out what it was. Then express mailed it Thursday. The IVR is "slow" this week...I think a day off. It didn't update until late in the day Wednesday and I didn't make it to the post office in time. *(#(*#$#(* But I express mailed the document and it is 1/2 way to Portsmouth as we speak...should be there by 10 am Friday morning. Hopefully I will have case complete by end of next week!

So I guess it takes a week for them to get to the docs and review and generate possible rfe..

Just got an AVR message saying they received the documents, 3 hours ago AVR did not have it yet, but the operator did.

You are hoping for case complete end of next week, is it just your optimism or is it based on experience or facts?

I hope so too, but somehow doubt. Still hope for an Oct interview date in any case.

Marriage : 2001-09-26

CSC:

I-130 Sent : 2008-03-01

I-130 NOA1 : 2008-03-12

I-130 Approved : 2008-07-24

NVC:

NVC Received: 2008-07-30

DS-3032 and AOS bill generated: 2008-08-04

DS-3032 e-mailed (with autoreply): 2008-08-05

AOS fee paid online: 2008-08-06

AOS fee received in AVR and online: 2008-08-07

DS-3032 accepted with e-mail notice: 2008-08-15

IV fee bill paid online: 2008-08-16

IV fee bill generated in AVR: 2008-08-18

IV fee bill Accepted (PAID online): 2008-08-19

I-864 Express Mailed: 2008-08-19

IV fee and 864 received at NVC, called to confirm: 2008-08-22

DS-230 Express Mailed to NVC: 2008-08-25

RFE issued (864): 2008-09-2, sent correction: 2008-09-03

RFE Checklist received: 2008-09-08

Case Complete: 2008-09-16

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I got RFE on my I864. Called NVC on Wednesday morning (8/27) and the AVR's message was....your documents have been reviewed and found information missing in Financial Support papers. I call the Operator and find out what is missing. I called three times just to confirm. I express mailed the I864 on the same day and it was received by NVC on 8/28. The AVR has been updated to....your checklist letter has been received on 8/28 and to wait 6-8 weeks for review. I call the NVC Operator to confirm and and ask about my ds230. I was told that the I864 and the ds230 are under the same review. So I assume one person is reviewing both. Since the AVR on Wednesday (8/27) stated that your documents have been reviewed I assume that the ds230 has been reviewed and everything must be ok with it. Per the Operator, my I864 is under review. Hopefully by end of next week I may also hear some good news....fingers crossed.........I am also hoping for an October interview.

California Service Center:

05/09/08: Sent I-130

05/16/08: NOA1

07/23/08: NOA2

NVC :

07/29/08: NVC case received

09/05/08: CASE COMPLETED

Embassy:

10/20/08: Interview/VISA Approved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline
I got RFE on my I864. Called NVC on Wednesday morning (8/27) and the AVR's message was....your documents have been reviewed and found information missing in Financial Support papers. I call the Operator and find out what is missing. I called three times just to confirm. I express mailed the I864 on the same day and it was received by NVC on 8/28. The AVR has been updated to....your checklist letter has been received on 8/28 and to wait 6-8 weeks for review. I call the NVC Operator to confirm and and ask about my ds230. I was told that the I864 and the ds230 are under the same review. So I assume one person is reviewing both. Since the AVR on Wednesday (8/27) stated that your documents have been reviewed I assume that the ds230 has been reviewed and everything must be ok with it. Per the Operator, my I864 is under review. Hopefully by end of next week I may also hear some good news....fingers crossed.........I am also hoping for an October interview.

I just got RFE in AVR.. did your RFE say specifically "found information missing in Financial Support papers.." ?

Mine does not say financial, just says "nvc has reviewed your packet of forms and found information missing or incomplete.."

Would like to know if they do have different avr rfe messages for 864 rfe and 230 rfe.

They received my 864 Aug.21 and 230 on 27th.

Anyone has any ideas if it's on 230 or 864 ?

Marriage : 2001-09-26

CSC:

I-130 Sent : 2008-03-01

I-130 NOA1 : 2008-03-12

I-130 Approved : 2008-07-24

NVC:

NVC Received: 2008-07-30

DS-3032 and AOS bill generated: 2008-08-04

DS-3032 e-mailed (with autoreply): 2008-08-05

AOS fee paid online: 2008-08-06

AOS fee received in AVR and online: 2008-08-07

DS-3032 accepted with e-mail notice: 2008-08-15

IV fee bill paid online: 2008-08-16

IV fee bill generated in AVR: 2008-08-18

IV fee bill Accepted (PAID online): 2008-08-19

I-864 Express Mailed: 2008-08-19

IV fee and 864 received at NVC, called to confirm: 2008-08-22

DS-230 Express Mailed to NVC: 2008-08-25

RFE issued (864): 2008-09-2, sent correction: 2008-09-03

RFE Checklist received: 2008-09-08

Case Complete: 2008-09-16

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

We are in the same boat. It was the DS230 packet supporting documents. Check this site to see if you forgot somthing.... http://travel.state.gov/visa/immigrants/info/info_3176.html

http://travel.state.gov/visa/frvi/reciproc...ocity_3656.html

Edited by LuLu

"Haters are confused admirers, they can’t be or figure you out so negativity comes out [their] mouth.”

-Chad Ochocinco "85" - WR Cincinnati Bengals

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline
We are in the same boat. It was the DS230 packet supporting documents. Check this site to see if you forgot somthing.... http://travel.state.gov/visa/immigrants/info/info_3176.html

http://travel.state.gov/visa/frvi/reciproc...ocity_3656.html

Seems like we had everything..

Did your RFE AVR message say "missing or incomplete supporting documents" or just "missing or incomplete information" ?

Marriage : 2001-09-26

CSC:

I-130 Sent : 2008-03-01

I-130 NOA1 : 2008-03-12

I-130 Approved : 2008-07-24

NVC:

NVC Received: 2008-07-30

DS-3032 and AOS bill generated: 2008-08-04

DS-3032 e-mailed (with autoreply): 2008-08-05

AOS fee paid online: 2008-08-06

AOS fee received in AVR and online: 2008-08-07

DS-3032 accepted with e-mail notice: 2008-08-15

IV fee bill paid online: 2008-08-16

IV fee bill generated in AVR: 2008-08-18

IV fee bill Accepted (PAID online): 2008-08-19

I-864 Express Mailed: 2008-08-19

IV fee and 864 received at NVC, called to confirm: 2008-08-22

DS-230 Express Mailed to NVC: 2008-08-25

RFE issued (864): 2008-09-2, sent correction: 2008-09-03

RFE Checklist received: 2008-09-08

Case Complete: 2008-09-16

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

Just listened to it again.....

The NVC has reviewed your packet of forms and has found imformation missing or iincomplete. The NVC mailed a

letter on August 28, 2008 indicating which documentation is missing or incomplete. ......Please return this information to NVC in Portmouth NH.......

[\Quote]

Funny thing is that the AVR had this information on it on Wednesday....but I cannot remember what it said about NVC mailing a letter........

"Haters are confused admirers, they can’t be or figure you out so negativity comes out [their] mouth.”

-Chad Ochocinco "85" - WR Cincinnati Bengals

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline
Just listened to it again.....

The NVC has reviewed your packet of forms and has found imformation missing or iincomplete. The NVC mailed a

letter on August 28, 2008 indicating which documentation is missing or incomplete. ......Please return this information to NVC in Portmouth NH.......

Funny thing is that the AVR had this information on it on Wednesday....but I cannot remember what it said about NVC mailing a letter........

Thanks, mine says exactly same thing.. except "send a letter on Aug. 29.."

But they only received 230 Aug.28th.. And when I spoke to the operator Aug.28 she could not even say what was it that they received, just saw some packet was received 28th.

Well, it's a mystery until Tuesday I guess. Can not think of anything that might be wrong. Maybe false rfe and waiting for 230 processing as some on VJ write, maybe some real rfe.

At least I think it's not 864, in which case avr says "missing or incomplete financial information"..

Marriage : 2001-09-26

CSC:

I-130 Sent : 2008-03-01

I-130 NOA1 : 2008-03-12

I-130 Approved : 2008-07-24

NVC:

NVC Received: 2008-07-30

DS-3032 and AOS bill generated: 2008-08-04

DS-3032 e-mailed (with autoreply): 2008-08-05

AOS fee paid online: 2008-08-06

AOS fee received in AVR and online: 2008-08-07

DS-3032 accepted with e-mail notice: 2008-08-15

IV fee bill paid online: 2008-08-16

IV fee bill generated in AVR: 2008-08-18

IV fee bill Accepted (PAID online): 2008-08-19

I-864 Express Mailed: 2008-08-19

IV fee and 864 received at NVC, called to confirm: 2008-08-22

DS-230 Express Mailed to NVC: 2008-08-25

RFE issued (864): 2008-09-2, sent correction: 2008-09-03

RFE Checklist received: 2008-09-08

Case Complete: 2008-09-16

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×