Hi to all members!

May VB is already out and cut off for F2A category is September 1, 2013. Now, what are your predictions for JUNE VISA BULLETIN? Share you got feeling guys! Thank you and goodluck to all of us.

Edited by Mockingjay

Visa Category: F2A

Country: Philippines

Lockbox: Chicago Lockbox

USCIS Service Center: California Service Center

I-130 Sent: November 5, 2013

NOA 1: November 8, 2013

NOA 2: February 5, 2014

Date Received by NVC: February 15, 2014

Case Number and IIN: April 2, 2014

DS-261/AOS Invoice Email: February 19, 2015

Paid AOS Fee: February 21, 2015

Link to comment
Share on other sites

September 1- 8, 2018

Priority Date - December 2, 2013

USCIS -

12/02/13 : NOA1 (Priority Date)

03/24/15 : Case Transferred from VSC to CSC

03/28/15 : Hard copy of transfer received in mail

04/14/15 : NOA2 ( I-130 Approved) - finally! (informed via text on 4/16/2015)

NVC -

04/29/15 : NVC received the case (informed during phone call to NVC on 5/01/2015

05/08/15 : Case number assigned and IIN (received via phone call on 5/14/2015)

05/12/15 : NVC Welcome letter mailed

05/19/15 : NVC Welcome received in mail

05/29/15 : DS-261 Finally Available on CEAC and completed

05/29/15 : AOS bill Available on CEAC and paid (status: IN PROCESS)

06/02/15 : AOS bill status: PAID

06/15/15 : IV invoice generated (notified by email) but unable to pay on CEAC...waiting...

07/05/15 : IV bill Finally Available on CEAC and paid (status: IN PROCESS)

07/08/15 : IV bill status: PAID

07/08/15 : DS-260 Available

07/12/15 : DS-260 completed and submitted

07/13/15 : AOS and IV package mailed to NVC

07/14/15 : AOS and IV package received by NVC

07/16/15 : Scan Date

07/28/15 : CASE COMPLETE - NO checklist! :dancing::dancing::dancing:London...here we come...!!

08/04/15 : CC Email received...waiting for Interview Letter....

08/11/15 : Interview letter (IL/P4) received ...interview date 9/11/2015! :dancing: :dancing::dancing:

EMBASSY -

08/11/15 : Case Shipped to embassy

08/12/15 : Case Arrived in UK (tracked on DHL website)

08/12/15 : Medical completed

08/14/15 : CEAC showing IN TRANSIT

08/18/15 : CEAC showing READY

09/11/15 : Interview date (initial)

09/08/15 : Interview date (rescheduled on 8/18/2015) - APPROVED :)

xx/xx/15 : Visa in hand
xx/xx/15 : POE....Dulles airport!

Link to comment
Share on other sites

Would be nice if it progresses at least 4 weeks but ideally I would love to see 6 weeks movement next month and the month after. Scheduling started really early last time. So most likely not next week but the week after we should start seeing sept filers receive their interview letters.

F2A JOURNEY STATUS

COMPLETE

USCIS

Vermont Service Center

01/17/14 : NOA1 (Priority Date)

03/24/15 : NOA-T (Electronic Transfer notice to California Service Center)

03/28/15 : NOA-T (Hard Copy of Transfer notice received in mail)

03/30/15 : NOA2 ( I-130 Approved) Electronic confirmation

04/03/15 : NOA2 Hard Copy received in mail

NVC

http://www.visajourn...php/NVC_Process

04/16/15 : NVC Received Case (Phone call with CSR confirmed)

04/24/15 : Case number and IIN assigned (Phone Call)

04/27/15 : NVC Welcome Letter received via Email

04/27/15 : DS-261 Waived and AOS & IV bill invoiced

04/28/15 : AOS & IV bill paid (Status: IN PROCESS)

04/29/15 : AOS & IV bill paid (Status: PAID)

04/29/15 : DS-260 Available online

04/30/15 : DS-260 Completed

05/08/15 : AOS and IV Package mailed to NVC

05/26/15 : NVC Scan Date (CSR confirmed)

06/17/15 : Case Complete

07/29/15 : Interview Date Received Sep 2nd! (CSR confirmed) :dancing:

07/30/15 : Interview Letter email received (P4)

07/31/15 : NVC shipped out case to London Embassy

Embassy

07/30/15 : Medical Completed

08/01/15 : CEAC status "In Transit"

08/03/15 : Package received at London Embassy

08/05/15 : CEAC status "Ready"

09/02/15 : Interview

09/02/15 : Interview Result: APPROVED!!

09/03/15 : CEAC status changed to "Administrative Processing"

09/04/15 : CEAC status changed to "Issued " :dancing:

09/10/15 : Visa in hand!!

09/11/15 : POE

Link to comment
Share on other sites

well I hope you realized I was sleeping when I wrote 2018!!!! of course, I mean September 1-8, 2013.

Priority Date - December 2, 2013

USCIS -

12/02/13 : NOA1 (Priority Date)

03/24/15 : Case Transferred from VSC to CSC

03/28/15 : Hard copy of transfer received in mail

04/14/15 : NOA2 ( I-130 Approved) - finally! (informed via text on 4/16/2015)

NVC -

04/29/15 : NVC received the case (informed during phone call to NVC on 5/01/2015

05/08/15 : Case number assigned and IIN (received via phone call on 5/14/2015)

05/12/15 : NVC Welcome letter mailed

05/19/15 : NVC Welcome received in mail

05/29/15 : DS-261 Finally Available on CEAC and completed

05/29/15 : AOS bill Available on CEAC and paid (status: IN PROCESS)

06/02/15 : AOS bill status: PAID

06/15/15 : IV invoice generated (notified by email) but unable to pay on CEAC...waiting...

07/05/15 : IV bill Finally Available on CEAC and paid (status: IN PROCESS)

07/08/15 : IV bill status: PAID

07/08/15 : DS-260 Available

07/12/15 : DS-260 completed and submitted

07/13/15 : AOS and IV package mailed to NVC

07/14/15 : AOS and IV package received by NVC

07/16/15 : Scan Date

07/28/15 : CASE COMPLETE - NO checklist! :dancing::dancing::dancing:London...here we come...!!

08/04/15 : CC Email received...waiting for Interview Letter....

08/11/15 : Interview letter (IL/P4) received ...interview date 9/11/2015! :dancing: :dancing::dancing:

EMBASSY -

08/11/15 : Case Shipped to embassy

08/12/15 : Case Arrived in UK (tracked on DHL website)

08/12/15 : Medical completed

08/14/15 : CEAC showing IN TRANSIT

08/18/15 : CEAC showing READY

09/11/15 : Interview date (initial)

09/08/15 : Interview date (rescheduled on 8/18/2015) - APPROVED :)

xx/xx/15 : Visa in hand
xx/xx/15 : POE....Dulles airport!

Link to comment
Share on other sites

Filed: F-2A Visa Country: Nigeria
Timeline

I think the June VB cut off date would be 01 Oct,2013. My only reason for predicting this is the current thrend, maybe it might advance more than 4 weeks but I doubt if it would move only for few days, 8 days movement is never going to happen. I pray it advances beyond 01, Oct 2013. Once NVC starts scheduling we can be able to tell how far it might advance. Good luck to us all.

Month/Day/Year 09/24/2013 - Priority Date09/26/2013 - NOA112/18/2013 - NOA2 - Approved01/06/2014 - NVC Received my case02/13/2015 - Received email to pay AOS/ DS-261 WAIVED02/14/2015 - AOS & IV Fees Paid03/06/2015 - Financial Documents and Civil documents sent to NVC03/09/2015 - NVC Received03/09/2015 - NVC Scan Date03/09/2015 - Ds260 completed and submitted03/11/2015 - NVC sent confirmation via email04/04/2015 - AOS Checklist 04/06/2015 -Response to Checklist04/07/2015 - New Scan Date04/30/2015 - Case complete confirmation via phone05/07/2015 - Received case complete confirmation mail06/02/2015 - Interview Date ( 2nd July 2015) over the phone 06/08/2015 - Interview Letter arrived via Email 06/15/2015 - Medical Test Completed06/10/2015 - Case shows READY at CEAC portal<p>Visa Approved, waiting to pick up passport :)
Link to comment
Share on other sites

As a result of the unprecedented action of the VB becoming current back in the summer of 2013, there was a very, very heavy number of applicants from August - December 2013. We are just now hitting that bottleneck.....

So this bottleneck will slow the VB down for the next couple of months because of the number of applicants from September/October. (if you draw a graph of the applicants from that time, I bet you, you will see the curve peak in Sept and Oct months.)

HOWEVER, in addition to the bottleneck,....there is another problem that further exacerbates things; namely, that a certain percentage of those applicants have only just received their NOA2 in the last few weeks and days and their cases have not even reached NVC, talk less of being CC!!!

The only logical way I can see DOS overcoming this problem (assuming, of course, that they care if all the visas from the F2A category are used up or not) is to substantially jump the VB ahead. So in the last quarter of this fiscal year, the VB will at mid 2014 - but it will move slowly for the next couple of months because of the large number of September and October filers.

IMHO and Speculation! LOL!

Priority Date - December 2, 2013

USCIS -

12/02/13 : NOA1 (Priority Date)

03/24/15 : Case Transferred from VSC to CSC

03/28/15 : Hard copy of transfer received in mail

04/14/15 : NOA2 ( I-130 Approved) - finally! (informed via text on 4/16/2015)

NVC -

04/29/15 : NVC received the case (informed during phone call to NVC on 5/01/2015

05/08/15 : Case number assigned and IIN (received via phone call on 5/14/2015)

05/12/15 : NVC Welcome letter mailed

05/19/15 : NVC Welcome received in mail

05/29/15 : DS-261 Finally Available on CEAC and completed

05/29/15 : AOS bill Available on CEAC and paid (status: IN PROCESS)

06/02/15 : AOS bill status: PAID

06/15/15 : IV invoice generated (notified by email) but unable to pay on CEAC...waiting...

07/05/15 : IV bill Finally Available on CEAC and paid (status: IN PROCESS)

07/08/15 : IV bill status: PAID

07/08/15 : DS-260 Available

07/12/15 : DS-260 completed and submitted

07/13/15 : AOS and IV package mailed to NVC

07/14/15 : AOS and IV package received by NVC

07/16/15 : Scan Date

07/28/15 : CASE COMPLETE - NO checklist! :dancing::dancing::dancing:London...here we come...!!

08/04/15 : CC Email received...waiting for Interview Letter....

08/11/15 : Interview letter (IL/P4) received ...interview date 9/11/2015! :dancing: :dancing::dancing:

EMBASSY -

08/11/15 : Case Shipped to embassy

08/12/15 : Case Arrived in UK (tracked on DHL website)

08/12/15 : Medical completed

08/14/15 : CEAC showing IN TRANSIT

08/18/15 : CEAC showing READY

09/11/15 : Interview date (initial)

09/08/15 : Interview date (rescheduled on 8/18/2015) - APPROVED :)

xx/xx/15 : Visa in hand
xx/xx/15 : POE....Dulles airport!

Link to comment
Share on other sites

Filed: F-2A Visa Country: Jamaica
Timeline

As a result of the unprecedented action of the VB becoming current back in the summer of 2013, there was a very, very heavy number of applicants from August - December 2013. We are just now hitting that bottleneck.....

So this bottleneck will slow the VB down for the next couple of months because of the number of applicants from September/October. (if you draw a graph of the applicants from that time, I bet you, you will see the curve peak in Sept and Oct months.)

HOWEVER, in addition to the bottleneck,....there is another problem that further exacerbates things; namely, that a certain percentage of those applicants have only just received their NOA2 in the last few weeks and days and their cases have not even reached NVC, talk less of being CC!!!

The only logical way I can see DOS overcoming this problem (assuming, of course, that they care if all the visas from the F2A category are used up or not) is to substantially jump the VB ahead. So in the last quarter of this fiscal year, the VB will at mid 2014 - but it will move slowly for the next couple of months because of the large number of September and October filers.

IMHO and Speculation! LOL!

Hmmm - very salient logical points, hopefully this is the case but you never know with DOS. :dancing:

F-2A Visa

Service Center : California Service Center

Marriage (if applicable): 2013-07-20

Priority Date: 2013-09-23

I-130 Approved : 2013-10-23

Received DS-261 / AOS Bill : 2015-02-12

Pay AOS Bill : 2015-02-12

Send AOS\IV Package : 2015-03-10

Send Joint Sponsor AOS Package : 2015-04-13

1st Checklist : 2015-04-16

AOS Checklist response sent : 2015-04-17

New Scan Date: 2015-04-20

2nd Checklist : 2015-05-04

AOS Checklist response sent : 2015-05-05

New Scan Date: 2015-05-11

Case Completed at NVC : 2015-06-09 (Confirmed on 2015-06-15)

Interview Date : 2015-08-19 (Confirmed by IL)

Interview Result : Approved :dancing:

Visa Status : Issued (on CEAC Site)

Link to comment
Share on other sites

Filed: F-2A Visa Country: Nigeria
Timeline

Hmmm - very salient logical points, hopefully this is the case but you never know with DOS. :dancing:

Brilliant points. Especially when you consider the retardation of the movement from 6 to 5 to 4 weeks in recent months. But truly, I've been on the queue for long enough to think anyone can predict DOS.

I-130 (California Service Center)

Category: F2A (Nigeria)

2013-08-03:Got Marriedrose.gif

2013-09-06 : I-130 Sent

Priority Date: 9th Sep 2013

2013-09-07: I-130 Received
2013-09-11: NOA-1

2013-09-13: NOA1 (Hard copy)smile.png

2013-10-21 NOA2dancin5hr.gif

2013-11-04 Case arrived at NVC

2013-11-24 AOS fee billed and paid

2014-01-02 AOS package sent to NVC

2014-01-03 IV fee paid.

2014-01-06 AOS package delivered (USPS.com)

2014-01-08 IV DS260 filled and submitted

2014-01-29 False DS260 Checklistno0pb.gif

2014-02-18 Case Complete through phone

2014-02-26 Case Complete Email

2015-05-01 Interview Date ( 11th June 2015) over the phone :D

2015-05-07 Interview Letter arrived via Email :dancing:

2015-05-09 Medical Test Completed

2015-05-12 Case shows READY at CEAC portal

2015-06-11 Visa Approved!!! :energy:

2015-07-01 Picked up the Passport with visa!!!

2015-07-04 POE( Smooth Entry, no question asked)

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

How catagory being current increases number off applicants. Bottleneck theory is all wrong because it became current then no movement and then retrogress. It all got corrected now.

11/27/2013 - Priority Date

04/01/2015 - I-130 Approved

04/21/2015 - NVC received Case

04/29/2015 - DS261 filled

05/02/2015 - Case under CSPA review

06/04/2015 - Supervisor review Initiated-Wait 42 days

Link to comment
Share on other sites

we shall see....LOL!

Priority Date - December 2, 2013

USCIS -

12/02/13 : NOA1 (Priority Date)

03/24/15 : Case Transferred from VSC to CSC

03/28/15 : Hard copy of transfer received in mail

04/14/15 : NOA2 ( I-130 Approved) - finally! (informed via text on 4/16/2015)

NVC -

04/29/15 : NVC received the case (informed during phone call to NVC on 5/01/2015

05/08/15 : Case number assigned and IIN (received via phone call on 5/14/2015)

05/12/15 : NVC Welcome letter mailed

05/19/15 : NVC Welcome received in mail

05/29/15 : DS-261 Finally Available on CEAC and completed

05/29/15 : AOS bill Available on CEAC and paid (status: IN PROCESS)

06/02/15 : AOS bill status: PAID

06/15/15 : IV invoice generated (notified by email) but unable to pay on CEAC...waiting...

07/05/15 : IV bill Finally Available on CEAC and paid (status: IN PROCESS)

07/08/15 : IV bill status: PAID

07/08/15 : DS-260 Available

07/12/15 : DS-260 completed and submitted

07/13/15 : AOS and IV package mailed to NVC

07/14/15 : AOS and IV package received by NVC

07/16/15 : Scan Date

07/28/15 : CASE COMPLETE - NO checklist! :dancing::dancing::dancing:London...here we come...!!

08/04/15 : CC Email received...waiting for Interview Letter....

08/11/15 : Interview letter (IL/P4) received ...interview date 9/11/2015! :dancing: :dancing::dancing:

EMBASSY -

08/11/15 : Case Shipped to embassy

08/12/15 : Case Arrived in UK (tracked on DHL website)

08/12/15 : Medical completed

08/14/15 : CEAC showing IN TRANSIT

08/18/15 : CEAC showing READY

09/11/15 : Interview date (initial)

09/08/15 : Interview date (rescheduled on 8/18/2015) - APPROVED :)

xx/xx/15 : Visa in hand
xx/xx/15 : POE....Dulles airport!

Link to comment
Share on other sites

Filed: F-2A Visa Country: Togo
Timeline

I guess there's no logical explanation for any retrogression in next VBs because many applicants had been waiting for over two years. DOS will create new available visas and palliate to any potential lack of visas for f2a. I hope so.

Link to comment
Share on other sites

  • 3 months later...

"....So in the last quarter of this fiscal year, the VB will at mid 2014..."

Almost there!

Priority Date - December 2, 2013

USCIS -

12/02/13 : NOA1 (Priority Date)

03/24/15 : Case Transferred from VSC to CSC

03/28/15 : Hard copy of transfer received in mail

04/14/15 : NOA2 ( I-130 Approved) - finally! (informed via text on 4/16/2015)

NVC -

04/29/15 : NVC received the case (informed during phone call to NVC on 5/01/2015

05/08/15 : Case number assigned and IIN (received via phone call on 5/14/2015)

05/12/15 : NVC Welcome letter mailed

05/19/15 : NVC Welcome received in mail

05/29/15 : DS-261 Finally Available on CEAC and completed

05/29/15 : AOS bill Available on CEAC and paid (status: IN PROCESS)

06/02/15 : AOS bill status: PAID

06/15/15 : IV invoice generated (notified by email) but unable to pay on CEAC...waiting...

07/05/15 : IV bill Finally Available on CEAC and paid (status: IN PROCESS)

07/08/15 : IV bill status: PAID

07/08/15 : DS-260 Available

07/12/15 : DS-260 completed and submitted

07/13/15 : AOS and IV package mailed to NVC

07/14/15 : AOS and IV package received by NVC

07/16/15 : Scan Date

07/28/15 : CASE COMPLETE - NO checklist! :dancing::dancing::dancing:London...here we come...!!

08/04/15 : CC Email received...waiting for Interview Letter....

08/11/15 : Interview letter (IL/P4) received ...interview date 9/11/2015! :dancing: :dancing::dancing:

EMBASSY -

08/11/15 : Case Shipped to embassy

08/12/15 : Case Arrived in UK (tracked on DHL website)

08/12/15 : Medical completed

08/14/15 : CEAC showing IN TRANSIT

08/18/15 : CEAC showing READY

09/11/15 : Interview date (initial)

09/08/15 : Interview date (rescheduled on 8/18/2015) - APPROVED :)

xx/xx/15 : Visa in hand
xx/xx/15 : POE....Dulles airport!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...