Jump to content
Amy and Nick

October/November 2010 Immigrant Visa filers (CR-1/IR-1)

 Share

1,589 posts in this topic

Recommended Posts

Congrats to those who have gotten approval and best of luck on the next phase =)

Question though: What is this "time line" everyone keeps referring to? Where does it show that?

Married: 09-24-2010

I-130 Process

I-130 Sent: 10-29-2010

1-130 Received: 10-31-2010

NOA1 Received (Electronic): 11-03-2010

NOA1 Received (Hard Copy): 11-08-2010

NOA2 Received (Electronic): 03-11-2011

NOA2 Received (Hard Copy): 03-17-2011

NVC Process

Applied/Opt-In E-Processing: 03-28-2011

NVC Case Number Assigned: 03-30-2011

AOS Fee Paid: 03-30-2011

Submitted COA Form/Approved: 03-30-2011

Approved for E-Processing: 04-09-2011

DS-260 Fee Paid: 04-09-2011

DS-260 Supporting Documents Submitted/Rec'd: 04-09-2011

Affidavit of Support Submitted/Rec'd: 04-26-2011

Checklist Letters for Support Docs/AOS Rec'd: 05-04-2011

Re-submitted AOS/Supporting Docs: 05-04-2011

NVC Case Complete: 06-13-2011

Montreal Interview: 08-08-2011 - Approved!

Passport/Visa Rec'd: 08-10-2011!

75 Days Total at the NVC

Check Out Our Story:

bloggraphic.jpg

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Congrats to those who have gotten approval and best of luck on the next phase =)

Question though: What is this "time line" everyone keeps referring to? Where does it show that?

You can find all info here

Basically You can create a timeline and track your case (as well as get estimated approval dates and much more

USCIS journey:

07/25/2010 - Nikah Day

11/10/2010 - sent I-130

11/15/2010- Priority Date

11/18/2010- Notice Date

03/16/2011- Case has been updated on website

04/20/2011- Received NOA2 approval email (Finally)

153 days from our NOA1 to NOA2 .

NVC Journey

04/05/2011: Received NVC Case #

05/30/2011 - Emailed DS3032 ( moving at snail's pace i know )

06/03/2011 - AOS fee Paid

06/03/2011 - Acceptance of DS3032

Link to comment
Share on other sites

Question though: What is this "time line" everyone keeps referring to? Where does it show that?

You know the timeline you filled out with all of the information regarding your case (name, country of beneficiary, service center, NOA 1 date, RFE date, etc)...on the very bottom it gives an estimate of when your case could be adjucated based on recent approvals from your service center.

If your case is at VSC there is a good chance it won't say anything, but if you are at CSC it will probably give you an estimate. Hope this helps.

My Case Timeline (I-130)

03/19/07: We met

01/03/09: He proposed =D

07/17/10: Married, yay!

USCIS: VSC (188 days)

10/04/10: Sent I-130

10/12/10: NOA1 (Received text/email with receipt #)

10/14/10: "Touched"

10/16/10: NOA1 (Received hard copy I-797C)

04/18/11: NOA2 (Received text/email):D

04/22/11: NOA2 (Received hard copy I-797C)

NVC

04/25/11: NVC received my original petition

05/05/11: Received NVC Case # and IIN; gave them our emails

05/07/11: Sent DS 3032 email

05/07/11: AOS fee invoiced and paid

05/09/11: NVC accepts husband's DS-3032 email

05/10/11: AOS fee shows up as paid

05/10/11: IV fee invoiced and paid

05/11/11: Sent AOS package via overnight mail

05/12/11: IV fee shows up as paid

05/12/11: AOS package delivered (per usps tracking website)

05/14/11: Sent IV package via overnight mail

05/16/11: IV package delivered (per usps tracking website)

05/20/11: AOS package reviewed

05/25/11: IV package reviewed

05/26/11: SIF!!!

05/26/11: CC!!!

06/10/11: NVC schedules interview date

Consulate

06/27/11: Medical Exam

07/11/11: Interview: Approved!

Link to comment
Share on other sites

You can find all info here

Basically You can create a timeline and track your case (as well as get estimated approval dates and much more

Oops, didn't realize you had already answered the question... :blush:

My Case Timeline (I-130)

03/19/07: We met

01/03/09: He proposed =D

07/17/10: Married, yay!

USCIS: VSC (188 days)

10/04/10: Sent I-130

10/12/10: NOA1 (Received text/email with receipt #)

10/14/10: "Touched"

10/16/10: NOA1 (Received hard copy I-797C)

04/18/11: NOA2 (Received text/email):D

04/22/11: NOA2 (Received hard copy I-797C)

NVC

04/25/11: NVC received my original petition

05/05/11: Received NVC Case # and IIN; gave them our emails

05/07/11: Sent DS 3032 email

05/07/11: AOS fee invoiced and paid

05/09/11: NVC accepts husband's DS-3032 email

05/10/11: AOS fee shows up as paid

05/10/11: IV fee invoiced and paid

05/11/11: Sent AOS package via overnight mail

05/12/11: IV fee shows up as paid

05/12/11: AOS package delivered (per usps tracking website)

05/14/11: Sent IV package via overnight mail

05/16/11: IV package delivered (per usps tracking website)

05/20/11: AOS package reviewed

05/25/11: IV package reviewed

05/26/11: SIF!!!

05/26/11: CC!!!

06/10/11: NVC schedules interview date

Consulate

06/27/11: Medical Exam

07/11/11: Interview: Approved!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Albania
Timeline

Hi There!! We got APPROVED yesterday !!! does anyone know what will happen now? we are in post descision activity and filed on the 18th Oct thanks!!! Good luck to everyone!!

Good Luck on your NVC stage...Congrats!! :dance: :dance:

event.png

preg.png

ENGAGED AUGUST 18, 2010

MARRIED OCT 21, 2010

FILED I-130 NOV 13,2010

NOA 1 NOV 15, 2010

NOA 2 JUNE 15, 2011

CASE # JULY 13,2011

DS3032 ACCEPTED JULY 18, 2011

AOS paid JULY 20, 2011

Sent AOS JULY 23, 2011

IV paid JULY 25, 2011

IV sent JULY 28, 2011

CASE CLOSED AUG 8, 2011

INTERVIEW DATE OCT 13, 2011

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Albania
Timeline

I am also October 2010 filer, I got my approval for I 130 and I129F on 1st Feb, my congrats to everyone who got their approval, my good luck for rest.

If you want to add me as u r friend, any of u please do so. Thanks.

congrats!! I wish you luck with NVC!! :dance: :dance: added u as friend:)

event.png

preg.png

ENGAGED AUGUST 18, 2010

MARRIED OCT 21, 2010

FILED I-130 NOV 13,2010

NOA 1 NOV 15, 2010

NOA 2 JUNE 15, 2011

CASE # JULY 13,2011

DS3032 ACCEPTED JULY 18, 2011

AOS paid JULY 20, 2011

Sent AOS JULY 23, 2011

IV paid JULY 25, 2011

IV sent JULY 28, 2011

CASE CLOSED AUG 8, 2011

INTERVIEW DATE OCT 13, 2011

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Romania
Timeline

It would be nice if we could get 2 June, July, August applications approved in one day.

I think all you September and October filers should be sending us thank you notes for letting you cut in line.

I agree, not really fair but the latest records of aprovals show that's not really a fast lane towards the NVC for them!:)Not even one got NVC# yet!;) Hopefully they will realize that before senting sep.oct. fillers off to the NVC they will first get done w/jun.july.aug. However this case with "post decision activity" does not mean aproved, Trust me! Me and a few others (july/aug) have the same and STILL waiting , this case has to take a no. :)

The best thing you should do is call them every other day but don't stop @ the first pers. ask to talk to a supervisor(officer)!! get an info pass online(you do quilify since you are over the 5 months)write to your congressman/woman, senator.

Hi There!! We got APPROVED yesterday !!! does anyone know what will happen now? we are in post descision activity and filed on the 18th Oct thanks!!! Good luck to everyone!!

read carefully! "post decision activity" does NOT really mean "aproved" isn't it?!It's either one or the other ;) The notice (NOA2) must simply say: your petiton # is "aproved" than you wait to be fwd. to the NVC! Hopefully after the July/Aug fillers ;) good luck!

USCIS journey:

02/11/2010 - got married

06/28/2010 - sent I-130

06/29/2010 - received by uscis

07/06/2010 - notice NOA1

07/08/2010 - updated

07/10/2010 - got NOA1 hard copy in the mail

11/01/2010 - moved from CSC to TSC

11/02/2010 - updated

11/03/2010 - updated

11/23/2010 - updated (post decision activity)

02/09/2011 - notification moved from TSC (back to initial review :o )

02/10/2011 - confirmation TSC back to CSC!

02/16/2011 - APROVED!!!!!

NVC journey:

02/25/2011 - we're IN :)) case # Emailed DS 3032. Paid AOS Fee.

03/01/2011 - DS 3032 approved (confirmation by email)

03/02/2011 - AOS shows paied -> AOS packet mailed out

03/04/2011 - AOS received

03/07/2011 - IV generated & paid

03/09/2011 - IV paid! mailed out->

03/14/2011 - IV received

03/31/2011 - Case complete @ NVC!!!

Link to comment
Share on other sites

I agree, not really fair but the latest records of aprovals show that's not really a fast lane towards the NVC for them!:)Not even one got NVC# yet!;) Hopefully they will realize that before senting sep.oct. fillers off to the NVC they will first get done w/jun.july.aug. However this case with "post decision activity" does not mean aproved, Trust me! Me and a few others (july/aug) have the same and STILL waiting , this case has to take a no. :)

The best thing you should do is call them every other day but don't stop @ the first pers. ask to talk to a supervisor(officer)!! get an info pass online(you do quilify since you are over the 5 months)write to your congressman/woman, senator.

read carefully! "post decision activity" does NOT really mean "aproved" isn't it?!It's either one or the other ;)The notice (NOA2) must simply say: your petiton # is "aproved" than you wait to be fwd. to the NVC! Hopefully after the July/Aug fillers ;) good luck!

There seem to be a lot of people here who see the view the more recent filers who have gotten approved before the 5 month timeframe as the "enemy". I'm sure there isn't a single Sept/Oct filer that is happy about what has happened with the June/July/August filers, yet, in your post you seem to be clearly glad that a lot of the recently approved Sept/Oct filers have yet to receive an NVC number.

People, please don't forget that we are all here with a common goal in mind...to bring our loved ones to the USA. The recent filers are not at fault for the CSC to TSC drama/injustice. Why should their cases be put at a standstill until all of the remaining June/July/August cases are approved? If they were approved then they deserve to move on to the NVC and Consulate stages.

I bet that if things were different...if it had been the March/April/May filers who had been screwed over, while the June/July/August filers were breezing by, you wouldn't want them to put your case on hold after it had been approved, just so that the filers before you could catch up...why?...because it clearly would not have been your fault that you got approved before they did...only the USCIS is to blame :bonk:

My Case Timeline (I-130)

03/19/07: We met

01/03/09: He proposed =D

07/17/10: Married, yay!

USCIS: VSC (188 days)

10/04/10: Sent I-130

10/12/10: NOA1 (Received text/email with receipt #)

10/14/10: "Touched"

10/16/10: NOA1 (Received hard copy I-797C)

04/18/11: NOA2 (Received text/email):D

04/22/11: NOA2 (Received hard copy I-797C)

NVC

04/25/11: NVC received my original petition

05/05/11: Received NVC Case # and IIN; gave them our emails

05/07/11: Sent DS 3032 email

05/07/11: AOS fee invoiced and paid

05/09/11: NVC accepts husband's DS-3032 email

05/10/11: AOS fee shows up as paid

05/10/11: IV fee invoiced and paid

05/11/11: Sent AOS package via overnight mail

05/12/11: IV fee shows up as paid

05/12/11: AOS package delivered (per usps tracking website)

05/14/11: Sent IV package via overnight mail

05/16/11: IV package delivered (per usps tracking website)

05/20/11: AOS package reviewed

05/25/11: IV package reviewed

05/26/11: SIF!!!

05/26/11: CC!!!

06/10/11: NVC schedules interview date

Consulate

06/27/11: Medical Exam

07/11/11: Interview: Approved!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Romania
Timeline

People, please don't forget that we are all here with a common goal in mind...to bring our loved ones to the USA. The recent filers are not at fault for the CSC to TSC drama/injustice. Why should their cases be put at a standstill until all of the remaining June/July/August cases are approved? If they were approved then they deserve to move on to the NVC and Consulate stages.

Yes, we all want that, but ALL of us have to go through a process that doesn't need to be postpone for months, only for them to use their time working on petitions that were filed WAY later!!! I didn't say that your "special" case should be put on standstill but to be put in # line!! SImple as that! I just hope that after the noise that we will make together (July & Aug.) they will wake up and straight thigs up!!!!

"DRAMA"...?!!?? Are you calling this a "DRAMA" ?! I hope you will have a taste of this drama yourself! Wait 7 months and than tell me and other fillers like me if you liked it!!

USCIS journey:

02/11/2010 - got married

06/28/2010 - sent I-130

06/29/2010 - received by uscis

07/06/2010 - notice NOA1

07/08/2010 - updated

07/10/2010 - got NOA1 hard copy in the mail

11/01/2010 - moved from CSC to TSC

11/02/2010 - updated

11/03/2010 - updated

11/23/2010 - updated (post decision activity)

02/09/2011 - notification moved from TSC (back to initial review :o )

02/10/2011 - confirmation TSC back to CSC!

02/16/2011 - APROVED!!!!!

NVC journey:

02/25/2011 - we're IN :)) case # Emailed DS 3032. Paid AOS Fee.

03/01/2011 - DS 3032 approved (confirmation by email)

03/02/2011 - AOS shows paied -> AOS packet mailed out

03/04/2011 - AOS received

03/07/2011 - IV generated & paid

03/09/2011 - IV paid! mailed out->

03/14/2011 - IV received

03/31/2011 - Case complete @ NVC!!!

Link to comment
Share on other sites

Yes, we all want that, but ALL of us have to go through a process that doesn't need to be postpone for months, only for them to use their time working on petitions that were filed WAY later!!! I didn't say that your "special" case should be put on standstill but to be put in # line!! SImple as that! I just hope that after the noise that we will make together (July & Aug.) they will wake up and straight thigs up!!!!

"DRAMA"...?!!?? Are you calling this a "DRAMA" ?! I hope you will have a taste of this drama yourself! Wait 7 months and than tell me and other fillers like me if you liked it!!

These folks have gotten an NOA2 and are moving on to the NVC, and the NVC is -probably- handling cases in the order they are received. The TSC cases, as sad as they are, have NOT received an NOA2 and moved on to the NVC. I feel very sad for anyone who is waiting longer than the already lengthy process requires, but I feel like your being a bit harsh on folks. Delay of your case, and others, is no reason to hope for delay of other folks' cases. We're all here for a common goal, and I'm sure the good people who have gotten their NOA2s would gladly wait their turn if you were at the NVC in front of them, but it seems a bit odd to be angry at them for moving on to NVC only because there is a group of people who have suffered the at the TSC. Your complaints would perhaps seem a bit more logical if these October filers were receiving their NOA2s from the TSC, while other TSC folks from June/July/August were not, but thats simply not the case here.

Good luck to you and your spouse, I hope your approved today and that you get to the NVC ahead of me, honestly. But I don't wish anyone to wait a day longer than they have to, and I hope the folks who got their NOA2s today and yesterday fly through the NVC at warp-speed.

-Jim

-Jim

Met: 01/27/2010 in Haiti on an emergency medical team trip after the earthquake.

Married: 11/23/2010 in USA

USCIS Stage (144 Days):

I-130 Petition Sent: 11/24/2010

NOA1 Received: 12/03/2010, CSC

Touched: 3/23/2011

Went gray from stress of waiting: 4/23/2011

Senator Toomey-R getting in touch with USCIS: 4/26/2011

NOA2: 4/26/2011

NOA2 Hardcopy: 4/30/2011

NVC Stage (35 Days):

Case # and IIN Received: 05/06/2011

DS3032 E-mail sent: 05/06/2011

AOS Fee invoiced and paid: 05/10/2011

DS3032 E-mail accepted, and Name-Change e-mail accepted: 05/11/2011

AOS Shows Paid, AOS Packaged overnighted: 05/11/2011

IV Fee invoiced and paid: 05/13/201

IV Fee shows Paid, IV Package Sent overnight: 05/16/2011

IV Package Delivered: 05/17/2011

Recieved False RFE for both packages: 5/24/2011

Confirmed with operator that packages were received, AVR updates that checklist is 'received': 5/24/2011

Received False RFE for I-864 and marriage certificate from operator: 5/26/2011

Confirmed with operator that I-864 package was reviewed and complete, but marriage certificate had not been found yet. 5/31/2011

Recieved False RFE for entire IV package: 6/2/2011

AVR Updates Case Closed, SIF, Operator Confirmed: 6/4/2011

Interview Scheduled: 6/10/11

Medical / US Consulate / POE:

Medical Appointment: 6/8/2011

Interview: 07/25/2011

POE:

POE: Detroit, 8/8/11

Link to comment
Share on other sites

Yes, we all want that, but ALL of us have to go through a process that doesn't need to be postpone for months, only for them to use their time working on petitions that were filed WAY later!!! I didn't say that your "special" case should be put on standstill but to be put in # line!! SImple as that! I just hope that after the noise that we will make together (July & Aug.) they will wake up and straight thigs up!!!!

"DRAMA"...?!!?? Are you calling this a "DRAMA" ?! I hope you will have a taste of this drama yourself! Wait 7 months and than tell me and other fillers like me if you liked it!!

I guess I misread your post. The way I understood it, I thought you were saying that those cases that were approved should not be forwarded to the NVC until the June/July/Aug petitions are approved. I've re-read your post and want to know if what you really mean is that the recently approved Sept/Oct cases should be put in line, and that the recently approved June/July/Aug cases be forwarded to the NVC first? If that is the case, I agree, but only, and I repeat ONLY if they were approved first, because the way the system should work is "first come first served". What I had a problem with was the idea that the cases which have been approved be made to wait until all the other pending cases are approved. Do you see what I mean?

I apologize for using the word drama. I did not mean to imply that you guys are making a drama about it...you have every right to complain...I sure as hell would too if I were in that situation. That's the first word that popped into my head for some reason and reading it now I see why it has upset you, because that was not the proper word to use. If I could edit that post I would replace it with an accurate synonym for injustice.

My Case Timeline (I-130)

03/19/07: We met

01/03/09: He proposed =D

07/17/10: Married, yay!

USCIS: VSC (188 days)

10/04/10: Sent I-130

10/12/10: NOA1 (Received text/email with receipt #)

10/14/10: "Touched"

10/16/10: NOA1 (Received hard copy I-797C)

04/18/11: NOA2 (Received text/email):D

04/22/11: NOA2 (Received hard copy I-797C)

NVC

04/25/11: NVC received my original petition

05/05/11: Received NVC Case # and IIN; gave them our emails

05/07/11: Sent DS 3032 email

05/07/11: AOS fee invoiced and paid

05/09/11: NVC accepts husband's DS-3032 email

05/10/11: AOS fee shows up as paid

05/10/11: IV fee invoiced and paid

05/11/11: Sent AOS package via overnight mail

05/12/11: IV fee shows up as paid

05/12/11: AOS package delivered (per usps tracking website)

05/14/11: Sent IV package via overnight mail

05/16/11: IV package delivered (per usps tracking website)

05/20/11: AOS package reviewed

05/25/11: IV package reviewed

05/26/11: SIF!!!

05/26/11: CC!!!

06/10/11: NVC schedules interview date

Consulate

06/27/11: Medical Exam

07/11/11: Interview: Approved!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Taiwan
Timeline

I am happy for anyone that gets approved. This process is difficult even if you didn't have to wait.

I just think the Sept/Oct filers should be thanking us or the USCIS for transferring us to TSC. Because had we stayed in CSC all of the Sept/Oct approvals that you are seeing would actually be the June/July/Aug approvals and you guys wouldn't be seeing anything until April/May. So I guess when USCIS transferred us the intent was to speed up the process and it certainly did for some people.

It is disheartening to see someone who filed 3 months and 5 days after we did get approved before us.

Hopefully, the NVC is processing on the initial priority dates and not the order received.

Link to comment
Share on other sites

Filed: Timeline

I am happy for anyone that gets approved. This process is difficult even if you didn't have to wait.

I just think the Sept/Oct filers should be thanking us or the USCIS for transferring us to TSC. Because had we stayed in CSC all of the Sept/Oct approvals that you are seeing would actually be the June/July/Aug approvals and you guys wouldn't be seeing anything until April/May. So I guess when USCIS transferred us the intent was to speed up the process and it certainly did for some people.

It is disheartening to see someone who filed 3 months and 5 days after we did get approved before us.

Hopefully, the NVC is processing on the initial priority dates and not the order received.

logically thinking NVC would i guess process them as they receive them irrespective of priority date, i guess the priority date is important during the NOA1 to NOA2 step but at NVC stage i don't think so but i could be wrong, i don't see a reason why they will hold the approved petitions which will in turn cause another backlog.

just my two cents...

Link to comment
Share on other sites

I am happy for anyone that gets approved. This process is difficult even if you didn't have to wait.

I just think the Sept/Oct filers should be thanking us or the USCIS for transferring us to TSC. Because had we stayed in CSC all of the Sept/Oct approvals that you are seeing would actually be the June/July/Aug approvals and you guys wouldn't be seeing anything until April/May. So I guess when USCIS transferred us the intent was to speed up the process and it certainly did for some people.

It is disheartening to see someone who filed 3 months and 5 days after we did get approved before us.

Hopefully, the NVC is processing on the initial priority dates and not the order received.

I can't speak for everyone else here with any authority at all, but I've been reading these forums every day and I'd be very surprised if there was more than a -very- small minority of people who are 'happy' or 'thankful' for the horrible situation you folks that got transferred to TSC have to put up. I can't imagine how hard it is, and I really do hope you all get approved immediately. Had any of us been given the choice of 'speeding up' our process by relegating those that went before us to some interminable TSC wait, I'm positive that the vast majority of people would have waited in line --- everyone on VJ has already demonstrated their willingness to wait and do the right thing merely by going through the I-130 process as opposed to breaking the law.

All that being said, I hope that this recent increase of "I just saw another October filer get approved, #######!, those jerks!" posts die down. If we could make the system right, we would. Nobody here wanted the TSC group to go through extra wait, we didn't ask to have a more efficient process at your loss, and its certainly not my desire to cut in line. I imagine it must be disheartening to see someone who filed later approved before you --- I would be disheartened too, honestly. But the injustice is from the USCIS, not from the Oct/Nov/Dec filers, and I think most of us would like the TSC group very much to get approved and move on to happy lives together with their spouses.

I really, honestly, wish that you all get approved immediately. And if you and I got approved today, I'd hope they'd start on your file first. I also hope that everyone in this mess of a process roots for one another, we should all be happy to see anyone approved. At the most selfish, its at least one more file off of someone's desk so ours can be there, at best, its another person we've been in the trenches with that has won the war.

-Jim

-Jim

Met: 01/27/2010 in Haiti on an emergency medical team trip after the earthquake.

Married: 11/23/2010 in USA

USCIS Stage (144 Days):

I-130 Petition Sent: 11/24/2010

NOA1 Received: 12/03/2010, CSC

Touched: 3/23/2011

Went gray from stress of waiting: 4/23/2011

Senator Toomey-R getting in touch with USCIS: 4/26/2011

NOA2: 4/26/2011

NOA2 Hardcopy: 4/30/2011

NVC Stage (35 Days):

Case # and IIN Received: 05/06/2011

DS3032 E-mail sent: 05/06/2011

AOS Fee invoiced and paid: 05/10/2011

DS3032 E-mail accepted, and Name-Change e-mail accepted: 05/11/2011

AOS Shows Paid, AOS Packaged overnighted: 05/11/2011

IV Fee invoiced and paid: 05/13/201

IV Fee shows Paid, IV Package Sent overnight: 05/16/2011

IV Package Delivered: 05/17/2011

Recieved False RFE for both packages: 5/24/2011

Confirmed with operator that packages were received, AVR updates that checklist is 'received': 5/24/2011

Received False RFE for I-864 and marriage certificate from operator: 5/26/2011

Confirmed with operator that I-864 package was reviewed and complete, but marriage certificate had not been found yet. 5/31/2011

Recieved False RFE for entire IV package: 6/2/2011

AVR Updates Case Closed, SIF, Operator Confirmed: 6/4/2011

Interview Scheduled: 6/10/11

Medical / US Consulate / POE:

Medical Appointment: 6/8/2011

Interview: 07/25/2011

POE:

POE: Detroit, 8/8/11

Link to comment
Share on other sites

I am happy for anyone that gets approved. This process is difficult even if you didn't have to wait.

I just think the Sept/Oct filers should be thanking us or the USCIS for transferring us to TSC. Because had we stayed in CSC all of the Sept/Oct approvals that you are seeing would actually be the June/July/Aug approvals and you guys wouldn't be seeing anything until April/May. So I guess when USCIS transferred us the intent was to speed up the process and it certainly did for some people.

It is disheartening to see someone who filed 3 months and 5 days after we did get approved before us.

Hopefully, the NVC is processing on the initial priority dates and not the order received.

Thanks for clarifying. I agree that the transfer must have seemed like a good way for them to speed things along for everyone but boy did they do a royal job of screwing that up! It sucks that the transfer only worked to the advantage of one particular group, but since nobody asked for this I think the USCIS would be the only ones to "thank" because they're the ones who created this mess in the first place.

I just sincerely hope that they will straighten it out soon because it sucks to see people be treated this way when they have taken the extra steps to do everything legally.

My Case Timeline (I-130)

03/19/07: We met

01/03/09: He proposed =D

07/17/10: Married, yay!

USCIS: VSC (188 days)

10/04/10: Sent I-130

10/12/10: NOA1 (Received text/email with receipt #)

10/14/10: "Touched"

10/16/10: NOA1 (Received hard copy I-797C)

04/18/11: NOA2 (Received text/email):D

04/22/11: NOA2 (Received hard copy I-797C)

NVC

04/25/11: NVC received my original petition

05/05/11: Received NVC Case # and IIN; gave them our emails

05/07/11: Sent DS 3032 email

05/07/11: AOS fee invoiced and paid

05/09/11: NVC accepts husband's DS-3032 email

05/10/11: AOS fee shows up as paid

05/10/11: IV fee invoiced and paid

05/11/11: Sent AOS package via overnight mail

05/12/11: IV fee shows up as paid

05/12/11: AOS package delivered (per usps tracking website)

05/14/11: Sent IV package via overnight mail

05/16/11: IV package delivered (per usps tracking website)

05/20/11: AOS package reviewed

05/25/11: IV package reviewed

05/26/11: SIF!!!

05/26/11: CC!!!

06/10/11: NVC schedules interview date

Consulate

06/27/11: Medical Exam

07/11/11: Interview: Approved!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...