Filed: Timeline
2 minutes ago, B & G said:

No approval letter yet, but I wasn't expecting one so soon. 

Only realized my case status was updated to 'new card is being produced' because of an app I have on my phone which tracks updates.

9/9/2016 Is yr NOA1 date or 751 date. Asking because NOA1 Dates are generally 2-3 days from sent date but yr NOA1 date is 17th which is little far.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Greece
Timeline
14 minutes ago, DD1 said:

Which app?

It's called USCIS case. Just add your case number. It has push notifications.

CR1 Visa

USCIS
08/13/2013 -- I130 Sent
08/14/2013 -- I130 NOA1 (email)

02/20/2014 -- I130 NOA2 (189 days - email)

NVC

02-28-2014 -- NVC received
04-03-2014 -- NVC case number assigned

05-22-2014 -- Case completed!!!!!!!
05-30-2014 -- Interview scheduled for July 16th 2014 08:30am

05-31-2014 -- Interview Letter received
Embassy
06-24-2014 -- Medical

07-16-2014 -- Interview Approved!!!!!
07-21-2014 -- Visa in hand
09-24-2014 -- POE

 

ROC
09-09-2016 -- I-751 sent
09-17-2016 -- NOA received

10-14-2016 -- Biometric appointment

08-07-2017 -- New card ordered
08-10-2017 -- New card mailed ( still no approval letter)

Link to comment
Share on other sites

Filed: Timeline
20 minutes ago, B & G said:

No approval letter yet, but I wasn't expecting one so soon. 

Only realized my case status was updated to 'new card is being produced' because of an app I have on my phone which tracks updates.

9/9/2016 Is yr NOA1 date or 751 date. Asking because NOA1 Dates are generally 2-3 days from sent date but yr NOA1 date is 17th which is little far.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Greece
Timeline
15 minutes ago, DD1 said:

9/9/2016 Is yr NOA1 date or 751 date. Asking because NOA1 Dates are generally 2-3 days from sent date but yr NOA1 date is 17th which is little far.

Paperwork was sent Sep 9th 2016.

Case received Sep 13th 2016.

NOA1 received Sep 17th 2016.

CR1 Visa

USCIS
08/13/2013 -- I130 Sent
08/14/2013 -- I130 NOA1 (email)

02/20/2014 -- I130 NOA2 (189 days - email)

NVC

02-28-2014 -- NVC received
04-03-2014 -- NVC case number assigned

05-22-2014 -- Case completed!!!!!!!
05-30-2014 -- Interview scheduled for July 16th 2014 08:30am

05-31-2014 -- Interview Letter received
Embassy
06-24-2014 -- Medical

07-16-2014 -- Interview Approved!!!!!
07-21-2014 -- Visa in hand
09-24-2014 -- POE

 

ROC
09-09-2016 -- I-751 sent
09-17-2016 -- NOA received

10-14-2016 -- Biometric appointment

08-07-2017 -- New card ordered
08-10-2017 -- New card mailed ( still no approval letter)

Link to comment
Share on other sites

Congrats! I told y'all Sept approvals gonna be rolling in this month. Now I feel elated and hopeful

I-130 PROCESS

01/17/2014 (Day 0): mailed I-130 to Chicago Lockbox

01/21/2014 (Day 4): I-130 delivered signed by R. Mercado.

01/23/2014 (Day 6): email NOA (case transferred to TSC)

01/27/2014 (Day 10): NOA 1 received (PD 01/21/2014)

05/30/2014 (Day 134): I-30 APPROVED, email NOA 2

06/05/2014 (Day 140): APPROVAL LETTER RECEIVED!!!!

I-485 AOS

06/10/2014 (Day 0): mailed AOS packet to Chicago Lockbox

06/11/2014 (Day 1): I-485 delivered signed by R.Mercado

06/16/2014 (Day 5): received email NOA for all forms (I-485 transferred to NSC; I-131 & I-765 processed at NBC)

06/17/2014 (Day 6): check cashed

06/21/2014 (Day 10): received hard copy NOA1 for all forms

06/23/2014 (Day 12): received biometric appointment letter 

07/11/2014 (Day 30): BIOMETRICS COMPLETED

07/14/2014 (Day 33): requested Expedite processing I-765

07/17/2014 (Day 36): request for evidence for expedite

07/23/2014 (Day 42): faxed in documents to USCIS

07/25/2014 (Day 44): e-notification, EAD/AP APPROVED!! 

07/29/2014 (Day 48): Status change “Testing and Interview"

07/31/2014 (Day 50): online status update "EAD card mailed

08/01/2014 (Day 51): EAD/AP CARD RECEIVED

08/13/2014 (Day 63): status change interview scheduled

08/15/2014 (Day 65): interview mail (9/18/14 @11:15AM)

09/18/2014 (Day 99): INTERVIEW APPROVED ON SPOT

09/22/2014 (Day 103): I-485 approval notice received

09/24/2014 (Day 105): Status change Green card mailed

09/27/2014 (Day 108): 2YRS GREEN CARD RECEIVED!!!!

I-751 ROC

09/15/2016 (Day 0): mailed ROC with divorce waiver

09/16/2016 (Day 1): delivered VSC, signed by L. Zuckowski

09/21/2016 (Day 5): check cashed

09/24/2016 (Day 8): received EXTENSION letter in the mail

10/06/2016 (Day 20): biometrics mail received (09/30/16)

10/17/2016 (Day 31): biometrics completed

09/11/2017 (Day 361): I-751 APPROVED

09/15/2017 (Day 365): Approval notice received in the mail

09/26/2017 (Day 376): Status change card in production

09/29/2017 (Day 379): Status change card mailed on 09/28

10/02/2017 (DAY 382): 10YRS GREEN CARD DELIVERED

Link to comment
Share on other sites

19 hours ago, dudeinTriBeCa said:

Congrats! I told y'all Sept approvals gonna be rolling in this month. Now I feel elated and hopeful

You think?  

What makes you think they are going to drop the second half of June, most of July and August and start pumping out September  approvals this month?  

I only mention because half of June CSC have yet to be approved and most of July. 

 

Realistically I think September 2016 should be looking at November earliest for approvals.  Sad -  but probably true.  

Edited by Teknodude
Got my month the wrong way round!

⬇️ Immigration/Visa experience ⬇️

 

ESTA 

ESTA revoked

H1B for 2 years

B2 - Denied

B2 - Successful

AoS

Green Card

Green Card ROC

Naturalization

 

(AoS & GC via same sex marriage if it helps) 

 

So plenty experience to draw on to help you all out on......  

Link to comment
Share on other sites

Filed: K-1 Visa Country: Australia
Timeline

I was thinking October too, based on the processing times... But I'll be honest, when they have a pile of files to go through, they are going to start picking the 'neatest' and most organized files out of that pile to do... That's human nature. So while the 2 recent approvals are maybe lucky dips from that pile, it still means that September files are in the pot for picking now! Just my opinion.. While I still think there's a wait, it could also be any day now! 

11/06/2012 - First met online

05/28/2013 - First met physically

10/15/2013 - Proposed :wub:

01/25/2014 - I-129F application lodged

*NO RFE! Thanks VJ* good.gif

05/27/2014 - Interview - Approved

06/18/2014 - Visa in hand

06/24/2014 - Arrived in the United States on the K1 visa!

07/01/2014 - Got married! (L)

08/06/2014 - Mailed AOS application

09/10/2014 - Biometrics appt

11/21/2014 - EAD and AP combo card in hand

12/16/2014 - Interview attended and application approved! :thumbs:

12/26/2014 - Green card in hand

09/27/2016 - Mailed ROC application

09/29/2016 - ROC application received by USCIS

10/03/2016 - NOA in hand! :)

11/07/2016 - Biometrics completed

03/15/2018 - ROC Approved! *No RFE or Interview! Thanks VJ* :thumbs:

04/06/2018 - 10 year GC in hand (With incorrect 'Resident Since' date - Filed SR online 'Typographical Error' with USCIS)

04/19/2018 - Email received from USCIS instructing me to return my GC for expedited correction - Mailed out today

Thank you VJ and all of the active posters... You guys have helped, and continue to help us so much! :thumbs:

Link to comment
Share on other sites

Still waiting on the ROC, but we just mailed in our N-400 yesterday. 

05/14: We were married!!

06/04/14: Finally marriage license was recorded & we got a copy

06/05/14: AOS package mailed via Fed Ex overnight to USCIS Chicago Lockbox

06/06/14: (Day 00) Confirmation of delivery & receipt date recorded by USCIS

06/11/14: (Day 05) NOA 1 Hard copy of receipt received

06/13/14: (Day 07) Form I-797C received, Biometrics appointment scheduled for July 8

07/01/14: RFE for co-sponsor salary and tax info, which was already sent with original package. Resent a copy on 07/08/14.

07/08/14: (Day 32) Biometrics appt.

08/10/14: (Day 65) Noticed that USCIS status has changed from Initial Review to Testing & Interview!

08/21/14: (Day 76) Received EAD/AP in the mail!

09/25/14: (Day 111) Email notice with interview date set for OCT. 29!

10/29/14: (Day 145) Interview day - APPROVED!!!

09/21/16: Mailed in I-751 Removal of Conditions

10/14/16: Biometrics appointment

8/8/17: Mailed N-400 Naturalization Application

8/15/17: USCIS texted that they've received N-400

9/8/17: Scheduled for biometrics 

10/11/17: In Line to be Scheduled for N-400 Interview
6/23/18: N400 Interview (recommended for approval pending I751)

8/1/18: I751 Interview - approved

 

Link to comment
Share on other sites

1 hour ago, Teknodude said:

You think?  

What makes you think they are going to drop the second half of June, most of July and August and start pumping out September  approvals this month?  

I only mention because half of June CSC have yet to be approved and most of July. 

 

Realistically I think September 2016 should be looking at November earliest for approvals.  Sad -  but probably true.  

I agree! I mean it'd be amazing to have our cases approved but what about June and July and august filers?? LoL

Does this mean that they were looking into up to June 15th filers and now all of a sudden they're looking into July, August and September filers at the same time? weird?!!!?!

I hope we all get approved asap but I'm still setting November as min bar for approvals. It's just me, I always take the ultimate scenario..

Edited by darnit
Link to comment
Share on other sites

My prediction only applies to VSC applicants, unfortunately CSC is on a whole new level altogether. As I said earlier, Sept 16 filers would see approvals in August or September latest. We'll see how all this unfolds

I-130 PROCESS

01/17/2014 (Day 0): mailed I-130 to Chicago Lockbox

01/21/2014 (Day 4): I-130 delivered signed by R. Mercado.

01/23/2014 (Day 6): email NOA (case transferred to TSC)

01/27/2014 (Day 10): NOA 1 received (PD 01/21/2014)

05/30/2014 (Day 134): I-30 APPROVED, email NOA 2

06/05/2014 (Day 140): APPROVAL LETTER RECEIVED!!!!

I-485 AOS

06/10/2014 (Day 0): mailed AOS packet to Chicago Lockbox

06/11/2014 (Day 1): I-485 delivered signed by R.Mercado

06/16/2014 (Day 5): received email NOA for all forms (I-485 transferred to NSC; I-131 & I-765 processed at NBC)

06/17/2014 (Day 6): check cashed

06/21/2014 (Day 10): received hard copy NOA1 for all forms

06/23/2014 (Day 12): received biometric appointment letter 

07/11/2014 (Day 30): BIOMETRICS COMPLETED

07/14/2014 (Day 33): requested Expedite processing I-765

07/17/2014 (Day 36): request for evidence for expedite

07/23/2014 (Day 42): faxed in documents to USCIS

07/25/2014 (Day 44): e-notification, EAD/AP APPROVED!! 

07/29/2014 (Day 48): Status change “Testing and Interview"

07/31/2014 (Day 50): online status update "EAD card mailed

08/01/2014 (Day 51): EAD/AP CARD RECEIVED

08/13/2014 (Day 63): status change interview scheduled

08/15/2014 (Day 65): interview mail (9/18/14 @11:15AM)

09/18/2014 (Day 99): INTERVIEW APPROVED ON SPOT

09/22/2014 (Day 103): I-485 approval notice received

09/24/2014 (Day 105): Status change Green card mailed

09/27/2014 (Day 108): 2YRS GREEN CARD RECEIVED!!!!

I-751 ROC

09/15/2016 (Day 0): mailed ROC with divorce waiver

09/16/2016 (Day 1): delivered VSC, signed by L. Zuckowski

09/21/2016 (Day 5): check cashed

09/24/2016 (Day 8): received EXTENSION letter in the mail

10/06/2016 (Day 20): biometrics mail received (09/30/16)

10/17/2016 (Day 31): biometrics completed

09/11/2017 (Day 361): I-751 APPROVED

09/15/2017 (Day 365): Approval notice received in the mail

09/26/2017 (Day 376): Status change card in production

09/29/2017 (Day 379): Status change card mailed on 09/28

10/02/2017 (DAY 382): 10YRS GREEN CARD DELIVERED

Link to comment
Share on other sites

11 hours ago, darnit said:

I agree! I mean it'd be amazing to have our cases approved but what about June and July and august filers?? LoL

Does this mean that they were looking into up to June 15th filers and now all of a sudden they're looking into July, August and September filers at the same time? weird?!!!?!

I hope we all get approved asap but I'm still setting November as min bar for approvals. It's just me, I always take the ultimate scenario..

I love your optimism sir!!  I had a bit of that, about 6 months ago! Aha.  

I'm a mid June filer and I'm still waiting.  Hey ho.  Good luck to you! 

16 minutes ago, dudeinTriBeCa said:

My prediction only applies to VSC applicants, unfortunately CSC is on a whole new level altogether. As I said earlier, Sept 16 filers would see approvals in August or September latest. We'll see how all this unfolds

CSC is on a whole different planet, let alone a different level - We shall see how it unfolds.  I remember when VSC was the bad boy, going slow, lagging way behind CSC.  Maybe they moved staff from one to the other, and the balance tilted dramatically the other way. Who knows how they run these places. 

I hope they get a sudden surge and start clearing their backlog soon! Good luck! 

⬇️ Immigration/Visa experience ⬇️

 

ESTA 

ESTA revoked

H1B for 2 years

B2 - Denied

B2 - Successful

AoS

Green Card

Green Card ROC

Naturalization

 

(AoS & GC via same sex marriage if it helps) 

 

So plenty experience to draw on to help you all out on......  

Link to comment
Share on other sites

Lmfaooo @ whole different planet 😂🤣😂😂😂 that had me rolling and dying 😂😂😂. But hey you never know, things can go 360 and you'd surprised CSC starts pumping out approvals here and there. Then we're gonna have to sit back comfortably and eat our own words haha. Thanks and good luck to you too @Teknodude

I-130 PROCESS

01/17/2014 (Day 0): mailed I-130 to Chicago Lockbox

01/21/2014 (Day 4): I-130 delivered signed by R. Mercado.

01/23/2014 (Day 6): email NOA (case transferred to TSC)

01/27/2014 (Day 10): NOA 1 received (PD 01/21/2014)

05/30/2014 (Day 134): I-30 APPROVED, email NOA 2

06/05/2014 (Day 140): APPROVAL LETTER RECEIVED!!!!

I-485 AOS

06/10/2014 (Day 0): mailed AOS packet to Chicago Lockbox

06/11/2014 (Day 1): I-485 delivered signed by R.Mercado

06/16/2014 (Day 5): received email NOA for all forms (I-485 transferred to NSC; I-131 & I-765 processed at NBC)

06/17/2014 (Day 6): check cashed

06/21/2014 (Day 10): received hard copy NOA1 for all forms

06/23/2014 (Day 12): received biometric appointment letter 

07/11/2014 (Day 30): BIOMETRICS COMPLETED

07/14/2014 (Day 33): requested Expedite processing I-765

07/17/2014 (Day 36): request for evidence for expedite

07/23/2014 (Day 42): faxed in documents to USCIS

07/25/2014 (Day 44): e-notification, EAD/AP APPROVED!! 

07/29/2014 (Day 48): Status change “Testing and Interview"

07/31/2014 (Day 50): online status update "EAD card mailed

08/01/2014 (Day 51): EAD/AP CARD RECEIVED

08/13/2014 (Day 63): status change interview scheduled

08/15/2014 (Day 65): interview mail (9/18/14 @11:15AM)

09/18/2014 (Day 99): INTERVIEW APPROVED ON SPOT

09/22/2014 (Day 103): I-485 approval notice received

09/24/2014 (Day 105): Status change Green card mailed

09/27/2014 (Day 108): 2YRS GREEN CARD RECEIVED!!!!

I-751 ROC

09/15/2016 (Day 0): mailed ROC with divorce waiver

09/16/2016 (Day 1): delivered VSC, signed by L. Zuckowski

09/21/2016 (Day 5): check cashed

09/24/2016 (Day 8): received EXTENSION letter in the mail

10/06/2016 (Day 20): biometrics mail received (09/30/16)

10/17/2016 (Day 31): biometrics completed

09/11/2017 (Day 361): I-751 APPROVED

09/15/2017 (Day 365): Approval notice received in the mail

09/26/2017 (Day 376): Status change card in production

09/29/2017 (Day 379): Status change card mailed on 09/28

10/02/2017 (DAY 382): 10YRS GREEN CARD DELIVERED

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

July filers list on visajourney for CSC is so long it's almost 80 people...... why's that?

Compare it to other months list of CSC.

Were there huge number of folks who filed in July?  in July some thing happened and might have led to flooding of petitions.

------------------------

17 APRIL 2013 : NOA1 Priority date
27 NOV: TSC; Transfered from NBC

3 Feb : NOA2 ( 296 days)

4 March: Shipped to NVC

11 March : Received at NVC

11 April: Case # assigned

18 April: paid both fees

9May: mailed AOS & IV packages

8May: DS260 completed

16May: packets scanned in NVC system

13 June: check list : missing page 7 of i864.

25 June : scan date AOS checklist

7 Aug: Case Complete...... BIG ACCOMPLISHMENT

14 Aug: interview date assigned

16 Aug: Email interview appointment received

18 Aug: Medical completed

23 Aug: biometric done,DS260 stamped, fingerprints taken.

10 Sep: interview day; interview took 511 days from I-130 NOA1

====================================================

11. 9/17/2016: I-751 packet received by CSC

12.Check Cashed : 9/21/2016

13. NOA1: 9/23/2016

14. BIOMETRICS : 10/12/2016

---------------------------

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...