Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for April: 71000: 2 Approvals (0 new / 2 in progress) 72000: 1 Approval, 1 Withdrawal (1 new / 1 in progress) 72500: 1 Approval (0 new / 1 in progress) 73000: 3 Approvals (0 new / 3 in progress) 73500: 1 Approval (0 new / 1 in progress) 74000: 1 Other (Document Was Returned To USCIS) (0 new / 1 in progress) 74500: 1 Approval (1 new / 0 in progress) 75000: 1 Approval (0 new / 1 in progress) 77000: 1 Denial (0 new / 1 in progress) 79000: 1 Approval (0 new / 1 in progress) 79500: 1 Approval (0 new / 1 in progress) 80000: 3 Approvals (0 new / 3 in progress) 07/18/22: 18 Total Updates: 15 Approvals, 1 Denial, 1 Withdrawal, 1 Other (Document Was Returned To USCIS) March (5) + April (18) = 23 updates -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
April updates: 69000: 1 Approval (0 new / 1 in progress) 72000: 1 RFER (0 new / 1 in progress) 72500: 1 RFER (0 new / 1 in progress) 73000: 1 RFER (0 new / 1 in progress) 73500: 1 Approval (0 new / 1 in progress) 74000: 1 Approval (0 new / 1 in progress) 74500: 1 Approval, 1 RFER (0 new / 2 in progress) 75000: 1 Approval, 1 RFER (1 new / 1 in progress) 76000: 3 Approvals (1 new / 2 in progress) 76500: 3 Approvals (0 new / 3 in progress) 77500: 1 RFER (0 new / 1 in progress) 78000: 1 RFER (0 new / 1 in progress) 78500: 1 RFES (1 new / 0 in progress) 81000: 2 Approvals, 1 RFES (1 new / 2 in progress) 81500: 1 RFER (0 new / 1 in progress) 07/15/22: 23 Total Updates: 13 Approvals, 2 RFESs, 8 RFERs March(4) + April(23) = 27 updates -
JUNE 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Yeah it is late May / Early June. The updates are posted in the June fliers group. -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for April: 69500: 1 Approval (0 new / 1 in progress) 70000: 1 Approval (0 new / 1 in progress) 72000: 1 Approval (0 new / 1 in progress) 73000: 1 Approval (0 new / 1 in progress) 74000: 1 RFER (0 new / 1 in progress) 74500: 1 RFES (1 new / 0 in progress) 76000: 1 RFES (0 new / 1 in progress) 76500: 1 RFER (0 new / 1 in progress) 79000: 1 RFER (0 new / 1 in progress) 80000: 1 Approval, 1 RFER (0 new / 2 in progress) 80500: 1 RFER (0 new / 1 in progress) 81000: 2 Approvals, 1 RFES (3 new / 0 in progress) 07/14/22: 15 Total Updates: 7 Approvals, 3 RFESs, 5 RFERs March (1) + April (15) = 16 updates. -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for April: 70500: 1 Approval (0 new / 1 in progress) 71000: 1 Approval (0 new / 1 in progress) 72000: 1 Approval (0 new / 1 in progress) 72500: 1 RFER (0 new / 1 in progress) 73500: 1 RFER (0 new / 1 in progress) 75500: 1 Approval (0 new / 1 in progress) 76000: 1 RFER (0 new / 1 in progress) 76500: 1 Approval (0 new / 1 in progress) 79000: 1 RFER (0 new / 1 in progress) 79500: 1 RFER (0 new / 1 in progress) 81000: 1 Approval, 1 RFES (2 new / 0 in progress) 81500: 3 RFESs (3 new / 0 in progress) 07/13/22: 15 Total Updates: 6 Approvals, 4 RFESs, 5 RFERs March (5) + April (15) = 20 -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for April: 71000: 1 RFER (0 new / 1 in progress) 73000: 2 RFERs (0 new / 2 in progress) 73500: 2 RFERs (0 new / 2 in progress) 74500: 1 Approval, 3 RFERs (0 new / 4 in progress) 75000: 1 Approval, 1 RFER (1 new / 1 in progress) 76500: 1 Approval, 1 RFER (1 new / 1 in progress) 77500: 1 RFER (0 new / 1 in progress) 78000: 1 RFER (0 new / 1 in progress) 78500: 2 RFERs (0 new / 2 in progress) 79000: 2 Approvals, 1 RFER (1 new / 2 in progress) 79500: 2 Approvals, 1 RFER (1 new / 2 in progress) 80000: 3 RFERs (0 new / 3 in progress) 81000: 1 RFER (0 new / 1 in progress) 07/12/22: 27 Total Updates: 7 Approvals, 20 RFERs March(9) + April (27) = 36 updates. -
JUNE 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
I can share my python script if you want to scan the July month later. We probably won't get to the July fliers until late August is my guess. -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Update for April: 69000: 1 Approval (0 new / 1 in progress) 70000: 1 Approval (0 new / 1 in progress) 71000: 3 Approvals (0 new / 3 in progress) 71500: 2 Approvals (0 new / 2 in progress) 72000: 1 Approval (0 new / 1 in progress) 73500: 3 Approvals (0 new / 3 in progress) 74500: 5 Approvals (0 new / 5 in progress) 75000: 1 Approval (0 new / 1 in progress) 77500: 1 Approval (0 new / 1 in progress) 78000: 2 Approvals (0 new / 2 in progress) 78500: 1 Approval (0 new / 1 in progress) 79000: 1 Approval, 1 RFES (1 new / 1 in progress) 79500: 3 Approvals, 1 RFES (1 new / 3 in progress) 80500: 1 RFES (0 new / 1 in progress) 81500: 4 Approvals (2 new / 2 in progress) 07/11/22: 32 Total Updates: 29 Approvals, 3 RFESs March(7) + April(32) + May(77) + June(43) = 159 total updates -
JUNE 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for June: 93000: 2 Approvals (2 new / 0 in progress) 93500: 7 Approvals, 1 RFES, 1 Other (Notice Explaining USCIS Actions Was Mailed) (8 new / 1 in progress) 94000: 13 Approvals, 2 RFESs (13 new / 2 in progress) 94500: 4 Approvals, 4 RFESs (8 new / 0 in progress) 95000: 3 Approvals (3 new / 0 in progress) 95500: 1 Approval, 1 RFES (2 new / 0 in progress) 102000: 1 Approval (0 new / 1 in progress) 102500: 2 Approvals (0 new / 2 in progress) 103000: 1 Approval (0 new / 1 in progress) 07/11/22: 43 Total Updates: 34 Approvals, 8 RFESs, 1 Other (Notice Explaining USCIS Actions Was Mailed) -
May 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
End of day updates for May: 82000: 1 Approval (1 new / 0 in progress) 84000: 1 Approval (1 new / 0 in progress) 85500: 1 Approval (0 new / 1 in progress) 86000: 4 Approvals, 1 RFES (3 new / 2 in progress) 87500: 2 Approvals (1 new / 1 in progress) 88000: 2 Approvals (2 new / 0 in progress) 88500: 1 Approval (1 new / 0 in progress) 90000: 2 Approvals, 2 RFESs (3 new / 1 in progress) 90500: 2 Approvals (2 new / 0 in progress) 91000: 13 Approvals, 2 RFESs (12 new / 3 in progress) 91500: 7 Approvals, 1 RFES (8 new / 0 in progress) 92000: 19 Approvals, 11 RFESs, 1 Other (Notice Explaining USCIS Actions Was Mailed) (29 new / 2 in progress) 92500: 3 Approvals, 1 RFES (3 new / 1 in progress) 07/11/22: 77 Total Updates: 58 Approvals, 18 RFESs, 1 Other (Notice Explaining USCIS Actions Was Mailed) -
JUNE 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
You can use the case scanner app if you just want to scan your group. If you want to scan a whole month or multiple months, I just use a python script that I wrote but I'll probably stop doing scans eventually. I handed my script to a few members here to play with. Perhaps they can start using it to scan the later months like July when we get there. -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Usually if the updates don't arrive past 7pm then it will be updated the next day. In case of yesterday, today's scan will also pick up changes from yesterday and no updates came in for 07/07/22. Last two days have been slow. Today's update: 72000: 1 RFER, 1 Denial (0 new / 2 in progress) 74500: 2 Approvals (0 new / 2 in progress) 75500: 1 Approval (1 new / 0 in progress) 76000: 2 RFERs (0 new / 2 in progress) 76500: 1 Approval (0 new / 1 in progress) 78000: 1 Approval (0 new / 1 in progress) 78500: 1 RFER (0 new / 1 in progress) 79500: 3 Approvals, 1 RFER (3 new / 1 in progress) 80000: 1 RFES (1 new / 0 in progress) 80500: 1 Approval (1 new / 0 in progress) 81000: 2 Approvals, 4 RFESs (5 new / 1 in progress) 81500: 4 Approvals (4 new / 0 in progress) 07/08/22: 26 Total Updates: 15 Approvals, 5 RFESs, 5 RFERs, 1 Denial March(1) + April(26) + May(63) + June(11) = 101 total updates -
May 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for May: 82000: 3 Approvals, 1 RFES (3 new / 1 in progress) 83000: 1 RFES (1 new / 0 in progress) 83500: 1 Approval, 1 RFES (2 new / 0 in progress) 84000: 2 Approvals, 4 RFESs (6 new / 0 in progress) 84500: 1 Approval, 1 RFES, 1 Withdrawal (2 new / 1 in progress) 85500: 1 Approval (0 new / 1 in progress) 86000: 3 Approvals (2 new / 1 in progress) 86500: 2 RFERs (0 new / 2 in progress) 87500: 2 RFESs (2 new / 0 in progress) 88000: 1 Approval (1 new / 0 in progress) 88500: 1 Approval (1 new / 0 in progress) 89000: 2 Approvals (2 new / 0 in progress) 90000: 1 Approval, 1 RFES (2 new / 0 in progress) 90500: 1 Approval, 1 RFES (2 new / 0 in progress) 91000: 11 Approvals, 4 RFESs, 1 Withdrawal (14 new / 2 in progress) 91500: 1 Approval, 3 RFESs (4 new / 0 in progress) 92000: 8 Approvals, 3 RFESs (11 new / 0 in progress) 07/08/22: 63 Total Updates: 37 Approvals, 22 RFESs, 2 RFERs, 2 Withdrawals -
JUNE 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
End of day for June: 93000: 1 Approval, 1 RFES (2 new / 0 in progress) 93500: 2 RFESs (2 new / 0 in progress) 94000: 1 Approval, 2 RFESs (2 new / 1 in progress) 96000: 1 Other (Document Was Mailed) (0 new / 1 in progress) 102000: 1 RFES, 1 RFER (0 new / 2 in progress) 103000: 1 RFER (0 new / 1 in progress) 07/08/22: 11 Total Updates: 2 Approvals, 6 RFESs, 2 RFERs, 1 Other (Document Was Mailed) Note: For yesterday only 3 updates came in since I last posted and they were RFEs -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for April: 71000: 1 RFES, 1 Other (Document Was Mailed) (1 new / 1 in progress) 71500: 1 Approval (0 new / 1 in progress) 72000: 1 RFER (0 new / 1 in progress) 72500: 2 Approvals (0 new / 2 in progress) 74500: 3 Approvals (2 new / 1 in progress) 76000: 1 Approval (0 new / 1 in progress) 77500: 1 Approval (0 new / 1 in progress) 79000: 2 RFESs, 1 RFER (2 new / 1 in progress) 79500: 1 RFES, 1 RFER (1 new / 1 in progress) 81000: 6 Approvals, 3 RFESs (8 new / 1 in progress) 07/07/22: 25 Total Updates: 14 Approvals, 7 RFESs, 3 RFERs, 1 Other (Document Was Mailed) March(1) + April(25) + May(33) + June(5) = 64 total updates There might some issues with USCIS today as the numbers are pretty low across the 4 months. -
May 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates today (might be some issues on USCIS system): 83000: 2 RFESs (2 new / 0 in progress) 83500: 1 RFES (1 new / 0 in progress) 84000: 1 Approval (1 new / 0 in progress) 84500: 1 Approval (1 new / 0 in progress) 85000: 2 RFERs (0 new / 2 in progress) 85500: 1 Approval (0 new / 1 in progress) 86000: 1 Approval (1 new / 0 in progress) 89500: 2 RFESs (2 new / 0 in progress) 90000: 3 Approvals (3 new / 0 in progress) 90500: 4 Approvals, 1 RFES (4 new / 1 in progress) 91000: 2 RFESs (1 new / 1 in progress) 91500: 1 Approval (1 new / 0 in progress) 92000: 6 Approvals, 3 RFESs (8 new / 1 in progress) 92500: 1 Approval, 1 RFES (0 new / 2 in progress) 07/07/22: 33 Total Updates: 19 Approvals, 12 RFESs, 2 RFERs -
JUNE 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
As mentioned in the May fliers thread there might be some issues with USCIS system today as the numbers are pretty low today: 93000: 1 Approval (1 new / 0 in progress) 94000: 2 Approvals (1 new / 1 in progress) 94500: 1 Approval (1 new / 0 in progress) 95000: 1 Approval (1 new / 0 in progress) 07/07/22: 5 Total Updates: 5 Approvals -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for April: 70000: 1 Approval (0 new / 1 in progress) 71000: 2 Approvals (0 new / 2 in progress) 71500: 3 Approvals (0 new / 3 in progress) 72000: 1 Approval (0 new / 1 in progress) 72500: 1 Approval (1 new / 0 in progress) 73000: 8 Approvals, 2 RFESs (8 new / 2 in progress) 73500: 3 Approvals, 1 RFER, 1 Withdrawal (1 new / 4 in progress) 74000: 2 Approvals (1 new / 1 in progress) 75000: 1 Approval (0 new / 1 in progress) 76000: 5 Approvals, 1 RFES, 1 Other (Name Was Updated) (5 new / 2 in progress) 76500: 6 Approvals (1 new / 5 in progress) 77500: 1 Approval (0 new / 1 in progress) 78000: 1 Approval (0 new / 1 in progress) 79500: 1 RFER (0 new / 1 in progress) 80000: 1 Other (Document Was Returned To USCIS) (0 new / 1 in progress) 81000: 2 Approvals (2 new / 0 in progress) 81500: 2 Approvals (1 new / 1 in progress) 07/06/22: 47 Total Updates: 39 Approvals, 3 RFESs, 2 RFERs, 1 Withdrawal, 2 Others (Name Was Updated, Document Was Returned To USCIS) March(6) + April(47) + May(111) + June(20) = 184 total updates -
May 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for May: 83500: 1 Approval, 1 RFER (0 new / 2 in progress) 84000: 4 Approvals (4 new / 0 in progress) 84500: 3 Approvals, 3 RFESs (4 new / 2 in progress) 85000: 5 Approvals, 1 RFES (3 new / 3 in progress) 85500: 1 Approval, 1 RFES (2 new / 0 in progress) 86000: 1 Approval, 1 RFES (2 new / 0 in progress) 86500: 1 Approval (1 new / 0 in progress) 87500: 3 Approvals (3 new / 0 in progress) 88000: 9 Approvals (8 new / 1 in progress) 88500: 2 Approvals (2 new / 0 in progress) 89000: 1 Approval (1 new / 0 in progress) 89500: 4 Approvals, 2 RFESs (5 new / 1 in progress) 90000: 11 Approvals, 2 RFESs (12 new / 1 in progress) 90500: 6 Approvals, 3 RFESs (9 new / 0 in progress) 91000: 5 Approvals (5 new / 0 in progress) 91500: 16 Approvals, 5 RFESs (18 new / 3 in progress) 92000: 7 Approvals, 3 RFESs (10 new / 0 in progress) 92500: 8 Approvals, 1 Other (Name Was Updated) (9 new / 0 in progress) 07/06/22: 111 Total Updates: 88 Approvals, 21 RFESs, 1 RFER, 1 Other (Name Was Updated) -
JUNE 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Looks like they started late May / early June fliers today: 93000: 3 Approvals, 1 RFES (4 new / 0 in progress) 93500: 2 Approvals (2 new / 0 in progress) 94000: 6 Approvals (5 new / 1 in progress) 94500: 5 Approvals (5 new / 0 in progress) 95000: 1 Approval (1 new / 0 in progress) 102500: 1 Approval, 1 Denial (0 new / 2 in progress) 07/06/22: 20 Total Updates: 18 Approvals, 1 RFES, 1 Denial -
APRIL 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
USCIS probably has some issues on their end. No approvals across March to June today. 69500: 1 RFER (0 new / 1 in progress) 70000: 1 Other (Case Was Reopened For Reconsideration) (0 new / 1 in progress) 72000: 3 RFERs (0 new / 3 in progress) 72500: 1 Denial (0 new / 1 in progress) 74500: 2 RFESs (2 new / 0 in progress) 75500: 1 RFER (0 new / 1 in progress) 76000: 2 RFESs (1 new / 1 in progress) 76500: 1 RFES, 1 RFER (1 new / 1 in progress) 77000: 1 Denial (0 new / 1 in progress) 79500: 1 RFER (0 new / 1 in progress) 81500: 2 RFESs, 1 RFER (2 new / 1 in progress) 07/05/22: 18 Total Updates: 7 RFESs, 8 RFERs, 2 Denials, 1 Other (Case Was Reopened For Reconsideration) March(4) + April(18) + May(24) + June(2) = 48 updates -
May 2021 I-129F K-1 FILERS
Xiaova replied to J&D1008's topic in K-1 Fiance(e) Visa Case Filing and Progress Reports
Updates for May: 82000: 1 RFES (1 new / 0 in progress) 82500: 1 RFES, 1 RFER (1 new / 1 in progress) 84500: 1 RFER (0 new / 1 in progress) 85000: 1 RFES, 1 RFER (1 new / 1 in progress) 85500: 1 RFES, 1 RFER, 1 Withdrawal (0 new / 3 in progress) 87500: 1 RFER (0 new / 1 in progress) 89500: 1 RFES (0 new / 1 in progress) 90000: 4 RFESs (3 new / 1 in progress) 90500: 3 RFESs (2 new / 1 in progress) 91000: 1 RFES (1 new / 0 in progress) 92000: 2 RFESs (2 new / 0 in progress) 92500: 3 RFESs (3 new / 0 in progress) 07/05/22: 24 Total Updates: 18 RFESs, 5 RFERs, 1 Withdrawal This is odd. I feel like they aren't really working today because of the long weekend. Hopefully tomorrow will be back to normal.