
SL4ever
-
Posts
149 -
Joined
-
Last visited
Content Type
Profiles
Forums
Partners
Immigration Wiki
Guides
Immigration Forms
Times
Gallery
Store
Blogs
Posts posted by SL4ever
-
-
Hi everyone
I copied below details from http://travel.state....or-may-2014.html and i hope f2a will retrogression on July 2014. hope for the best.
D. VISA AVAILABILITY DURING THE COMING MONTHS
WORLDWIDE F2A: From early 2013 through September 2013, the level of demand for numbers in this preference category was extremely low. As a result, the F2A cut-off date was advanced at a very rapid pace, in an attempt to generate demand so that the annual numerical limit could be fully utilized. As readers of the Visa Bulletin were advised during that time, such cut-off date advances were not expected to continue, and at some point they could stop, or retrogression might be required.
The level of demand being experienced for FY-2014 has resulted in the Worldwide F2A cut-off date being held since October. Despite no forward movement of the cut-off date, the level of demand has continued to increase dramatically. At the current rate, such demand will require a retrogression of the F2A cut-off date within the next several months. That action would be necessary to hold number use within the annual numerical limit.
MEXICO F2A: Despite an earlier retrogression of this cut-off date, the level of demand remains extremely heavy. As a result, it is likely that another retrogression of this cut-off date will be required to hold number use within the annual numerical limit.
-
Hi everyone
I copied below details from http://travel.state.gov/content/visas/english/law-and-policy/bulletin/2014/visa-bulletin-for-may-2014.html and i hope f2a will retrogression on July 2014. hope for the best.
D. VISA AVAILABILITY DURING THE COMING MONTHS
WORLDWIDE F2A: From early 2013 through September 2013, the level of demand for numbers in this preference category was extremely low. As a result, the F2A cut-off date was advanced at a very rapid pace, in an attempt to generate demand so that the annual numerical limit could be fully utilized. As readers of the Visa Bulletin were advised during that time, such cut-off date advances were not expected to continue, and at some point they could stop, or retrogression might be required.
The level of demand being experienced for FY-2014 has resulted in the Worldwide F2A cut-off date being held since October. Despite no forward movement of the cut-off date, the level of demand has continued to increase dramatically. At the current rate, such demand will require a retrogression of the F2A cut-off date within the next several months. That action would be necessary to hold number use within the annual numerical limit.
MEXICO F2A: Despite an earlier retrogression of this cut-off date, the level of demand remains extremely heavy. As a result, it is likely that another retrogression of this cut-off date will be required to hold number use within the annual numerical limit.
-
Ohhh. i though the next fiscal year which will start this coming July 2014.......
-
Hi
To. Shadowflex I like your post very much,
And my question is my husband completing 5 years on May 21, 2014 and he's now eligible to apply citizenship and he has already fill up the N 400 and he will be posting the documents coming Saturday...can anyone tell me how long it will take to prose his naturalization through citizenship.
Thank you.
-
Hi Saylin
Hi i am from sri lanka and my husband
sent I 130 on 29/10/2013 and I 130 application already in NVC from last 24/12/2013, and PD is 29/12/2013 do you have any idea when my PD date will be come current.
Also i saw http://tinyurl.com/4k7365v and in the pending list i don’t see my details.
And my husband is planning to apply for citizenship before March 20, 2014, and how long it will take to get the citizenship and after the citizenship will my process get faster or it's different to sri lanka.
Thank you
Kaush
-
Hi thanks for the reply. Most probably it will be on coming September.? I got my visitors visa for 5 years and I went and stayed for one month and came back again. I'm waiting for june and july visa bulletin. I hope the nvc will starts to issue visa. Thank you once again.
-
Hi congrats to vkrishan.
My PD is 28/10/2013 if anyone knows when my PD will become current.
Thank you
-
Hi I visited the usa last december while my I 130 at NVC. I guess nvc will start to issue visa numbers on coming july(not sure). As long as if your wife can prove that she will be rerun home from another 3 weeks then no worries. B cos I showed my return ticket and I told them that I came to see my husband on my vacation.
-
Hi Everyone,
My husband is a Green card holder and he’s planning to apply citizenship and he’s completing 5 Years for April 5 2014, also for the citizenship it takes 5 months to get process. Also my husband already apply F2A visa for me and my priority date is 29/10/2013 and my documents are already at NVC right now. My Question is
If he apply for citizenship on April 05, 2014 and While the citizenship documents get process (during the 5 months)
1. do I have chance to get my case up at NVC?
2. And how can I do that?
3. Or do I have to wait until he get the citizenship?
If anyone knows about the proceed please help us.
Thank you
-
Hi Thank you very much for the kin reply, my husband completing 5 years for this May 2014. I guess he can apply for the citizenship.
Will keeping touch.
Thank you.
-
Does anyone have an idea about the March visa bulletin 2014, because when I call to nvc they said their is no visa to issue, my PD is 29/10/2013 when is some updates in VJ I saw the PD like after 08 September 2013 got the visa numbers. I’m so depressed and I’m missing my husband so much.
I got my visitor’s visa B1/B2 visa type and I went to USA for 1 month and I came back to my home because we receive a letter from NVC that they received our petition from USCIS. And I was so happy, but now to see our priority dates not been current.
I have multiple visa for 5 years but the main problem is the money, to me to travel to USA it’s take 23 hours and my tickets cost like $1350 (My monthly salary is also $300 in sri lanka) and I can’t trouble to my husband for everything. He also got his job recently. And he spend lot of money for one month of my stay in USA. I know we are all helpless. But anyway if you guys have ay idea about the next current date for March 2014 visa bulletin.
Thank you.
-
Does anyone have an idea about the March visa bulletin 2014, because when I call to nvc they said their is no visa to issue, my PD is 29/10/2013 when is some updates in VJ I saw the PD like after 08 September 2013 got the visa numbers. I’m so depressed and I’m missing my husband so much.
I got my visitor’s visa B1/B2 visa type and I went to USA for 1 month and I came back to my home because we receive a letter from NVC that they received our petition from USCIS. And I was so happy, but now to see our priority dates not been current.
I have multiple visa for 5 years but the main problem is the money, to me to travel to USA it’s take 23 hours and my tickets cost like $1350 (My monthly salary is also $300 in sri lanka) and I can’t trouble to my husband for everything. He also got his job recently. And he spend lot of money for one month of my stay in USA. I know we are all helpless. But anyway if you guys have ay idea about the next current date for March 2014 visa bulletin.
Thank you.
-
Hi....
My I 130 already been received to NVC on 24/12/2013 how long it will take to get in to the Current status, since it’s already been a one month the NVC have received my Alien petition documents (I 130 / F2A)
-
-
Hi
I have already applied for CR 1 (I 130) on Oectober 30/10/2013, If i apply for visitng visa will it be a problem to me> in case the visiting visa got rejected will it be a problem to my CR 1
Thank you
KG
-
Hi, I am from Sri lanka, and got married to Green card holder, and my husband completing five year on April 2014, and he can apply for US citizen ship,.
My question is … How long it will get to processed my documentation (my husband has posted the documents on 28/10/2013) and I want to know for the green card holders and US citizen holders will treat as the same way?
Waiting for a reply …
Kaushiplus
Why NVC start the preprocessing phase if there is F2A retrogression coming
in Bringing Family Members of Permanent Residents to America
Posted
Hi everyone
I copied below details from http://travel.state....or-may-2014.html and i hope f2a will retrogression on July 2014. hope for the best.
D. VISA AVAILABILITY DURING THE COMING MONTHS
WORLDWIDE F2A: From early 2013 through September 2013, the level of demand for numbers in this preference category was extremely low. As a result, the F2A cut-off date was advanced at a very rapid pace, in an attempt to generate demand so that the annual numerical limit could be fully utilized. As readers of the Visa Bulletin were advised during that time, such cut-off date advances were not expected to continue, and at some point they could stop, or retrogression might be required.
The level of demand being experienced for FY-2014 has resulted in the Worldwide F2A cut-off date being held since October. Despite no forward movement of the cut-off date, the level of demand has continued to increase dramatically. At the current rate, such demand will require a retrogression of the F2A cut-off date within the next several months. That action would be necessary to hold number use within the annual numerical limit.
MEXICO F2A: Despite an earlier retrogression of this cut-off date, the level of demand remains extremely heavy. As a result, it is likely that another retrogression of this cut-off date will be required to hold number use within the annual numerical limit.