
nvc4all
-
Posts
59 -
Joined
-
Last visited
Content Type
Profiles
Forums
Partners
Immigration Wiki
Guides
Immigration Forms
Times
Gallery
Store
Blogs
Posts posted by nvc4all
-
-
we are in AP back in Dec 11 for want of additional document. The CO then said, if you send the document, visa will be issued in a week time. Now we got the document dropped on Jan 19, saw the updated date of Jan 22 on CEAC. I don't know how long we have to wait. Appreciate if any of you gone through this and how long one has to wait for visa issue? I know every case could be different.
-
The physician would have informed you if you had any issue..
nothing was told to. The physician had a friend that my wife knows and that made my wife comfortable and came to know during the conversation.
-
Medical done today. Don't know much details. I think only two vaccinations given.
Got a call from Mumbai consulate to my spouse just confirming that the interview, date and the need for biometrics.
-
what is the link for interview experience to Mumbai consulate.
http://www.visajourney.com/forums/topic/158129-cr1-interview-experience-at-mumbai-consulate/
-
That's okay!
You were probably more excited than I was when I got the visa in hand!
I was feeling drained (but still super happy) from dealing with the Montreal Consulate.
Congradulations
-
Since getting our interview date I've been logging onto the CEAC page every day, waiting for it to change to "in transit." It's said "NVC" until today. Now it says "BOGOTA." I assume they forgot to change the status upon sending it, and once it got to Bogotá there was some sort of delivery confirmation and so they finally remembered to update the current processing site.
Has anyone else had their case reach the embassy without ever seeing "in transit"?
I saw my packet went based on the DHL and the sent date from NVC rep, but just today I noticed changed to "In Transit"
-
mine also on dec 11 at 7.30am ..
That is nice/ Same time and same day
-
pls see the below link (Interview reviews) - U can check mumbai embassy reviews
http://www.visajourney.com/reviews/index.php?cnty=India&cty=&dfilter=5
Thanks. It helps a lot
-
Anybody from Mumbai Embassy interview done? If any, Can you give a detailed experience?
Mine is on 11th December. Worried how the procedure in general. what are the steps there, how you will be called, where to go first and next? Is that a window like mormaly are? will be asked to apprear in a room? Many questions.
Thanks if anybody can answer. It could benefit all who are waiting for Mumbai embassy intervoew.
-
Hey everybody, today was my interview at the Mumbai Consulate, India and extremely pleased to say that I have been APPROVED!!! Whole interview process was over in one hour. I will post a detailed experience later. It was a tough interview because we had lots of red flags, which meant lots of questions.
Congradulations. Mine is on 12/11 at Mumbai. Appreciate if you can send the interview questions and details. Where you were having red flags?
-
Got my P4 email. Thank god
-
called NVC. Interview date 12/11. CC 10/29 and priority date 10/4/2013.
Thank God
-
When are you leaving? Wish you a safe trip.
Can you share some questions they asked? I am waiting for interview date
-
That's true. I'm applying for my step-daughter (IR2) so my husband will attend the interview with his daughter; I will stay in the US with our kids. The interview is at 7:15 am.
My CC done, waiting for interview date. I also have a step child. Will they ask for custody papers for the child? The document does not say anywhere that they need one.
-
hi dwheels76 can you please add me to the spreadsheet, CC 10/29, Thank you!!!
hello everyone!
I got the same date for CC, 10/29 and Mumbai consulate
-
Congratulations. Welcome to the group. You are now added to the spreadsheet.
Others from your country will chime in since your embassy has some specific ways to do things biometrics and all that
Thanks for adding me. Is there country specific thread? India
what is the general delay from CC to interview date for India? any idea?
When should I start calling NVC for dates? Is the date be awaiable on CEAC or do we get an email? and if so after how many days from CC?
Appreciate if any can respond
Any indian mumbai consulate interview scheduled?
It's been one week from CC.
Is it usual?
I am also looking for the timeline for Mumbai. got CC on 10/29
-
New to the interview Thread. Just CC today 10/29. looking for tips
-
what was your scan date for AOS and iv for first time before checklist?
what was the checklist for ? they taking 60 days for checklist too?
AOS scanned 6/10
IV scanned 7/11
AOS accepted 7/18
IV check list scanned 9/3 - check list for original documents. sent copy before
CC - 10/29 - it looks like 60 days. - took 57 for me
- ChristinaG and Molly&Juan
-
2
-
CEAC shows N/A. called NVC to confirm. It is a CC. scan date for IV check list 9/3.
Thank God and thanks to all, especially Saylin who has setup this forum and good instructions. It was a long journey started at Nov 4, 2013 at USCIS and April 17 at NVC.
The journey continues Some ligths at the end of the tunnel. Thank God.
Kutty
- ChristinaG and jackie521
-
2
-
When was it case completed?
How cone you have 2 cases, what are these 2 cases? Any difference in visa category?
Thanks!
10/15 CC
Spouse and step child. same category
-
It sounds like they might be going back and reviewing cases by first scan date for those that sent items in before the change to sending packets together. I'm sure there were a lot of calls of nvc about having to wait until sixty days after last scan date. So maybe they've decided to review them together still, but by first scan date. That would explain the random sept and oct case completes. I don't think they've forgotten us with Aug 27-29 dates, they're just taking longer to get us as a result.
I am not able to make out anything from the latest CC's and scan dates
I have a case that is completed, with original scan date of Aug 4, followed by another document scanned on Sept 3.
I have another case that is still pending with original scan date of July 9th, followed by checklist scan date od Sept 3
-
CC today scan dates 8/8, 8/18 and 9/9
I got one CC for scanned date of 9/3. Another one waiting for the same scanned date
-
Aos changed to N/A for step child, but not for spouse. Second mail scanned for IV is 09/03. called NVC to confirm. However we sent both spouse and step child in one packet. Thank God to the extend it is good and Thank God to the extend it is not bad.
Still waiting for the spouse IV review. We had got a check list for original docs for spouse. Check list docs scanned on 09/03.
-
I don't know the answer to your question, but I've read that if you are in doubt, leave that field blank and take it to the interview, the CO will help you fill it.
The total income is always your total icome line #22 if you filed 1040, not the adjusted gross income from 1040. For 1040ez, the income is adjusted gross income
March 2015 Interviews
in IR-1 / CR-1 Spouse Visa Case Filing and Progress Reports
Posted
Finally my wife and child landed in USA on 11th Feb. A long journey. My wife's visa was approved on 11th January, but the step child's visa was on admin processing for want of custody. We were fighting for the custody in the court and it was about to close and we got the custody in the last week of January and we go the visa stamped in one day.
A question. How long we need to wait for SSN card to come and the green card?