esmie15's US Immigration Timeline
|
|
Petitioner's Name: Esmeralda B Caringola Beneficiary's Name: Jose Humberto Rodriguez VJ Member: esmie15 Country: Dominican Republic Last Updated: 2014-03-09 |
|
Immigration Checklist for Esmeralda B Caringola & Jose Humberto Rodriguez:
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||
Member Reviews:
| ||||||||||
Timeline Comments: None yet, be the first!
*Notice about estimates: The estimates are based off averages of other members recent experiences
(documented in their timelines) for the same benefit/petition/application at the same filing location.
Individual results may vary as every case is not always 'average'. Past performance does not necessarily
predict future results. The 'as early as date' may change over time based on current reported processing
times from members. There have historically been cases where a benefit/petition/application processing
briefly slows down or stops and this can not be predicted. Use these dates as reference only and do not
rely on them for planning. As always you should check the USCIS processing times to see if your application
is past due.
** Not all cases are transfered
ver 5.0
'). All the anxiousness was not making life any easier but at the very least it was enough time to gather all the documents they are requesting. I hope our interview is a breeze!javascript:emoticon('
')