PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012Mrtuttie F 8-Aug K1 approved
kismat75900 F 30-Jul F2A approved
Muba F 8-Aug CR1 approved
Yushams F 18-Jul IR1 approved 1 day to get visa 19-Jul
hbk2010 F 13-Aug-13 IR1 approved visa issued 27-Aug-13
ALLUneedisLove M 22-Aug IR1 AP visa issued 28-Aug-13 6 days
H&Z M 30-Aug IR1 approved 7-10 days will issue
afarooq101 (male) interview date july-17-2013 one month AP visa issue
bostonlovepakist (female) interview date aug-20-2013 visa received sep-09-2013
lonely15 ( male) interview date april-22-2013 visa received sep-09-2013
khan.usman ( female ) interview date july-12-2013 visa issue sep-12-2013
jboss ( female ) interview date july-11-2013 visa issue sep-13-2013
vsc-sucks (male) interview date aug-06-2013 visa issue sep-13-2013
a-ameer (male) FB1 interview date aug-01-2013 visa issue sep-04-2013
rass (female) interview date aug-12-2013 visa issue sep-05-2013
L37 (female) interview was a week ago visa issue sep-13-2013
shan0001 (male) cr1 interview date july-25-2013 visa issue sep-14-2013
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending APAPRIL
salman khan april-19-2012
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013janetusman (male) IR-1 jan-23-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) march-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) iR1 march-06-2013
mariamnasir (male) march-08-2013
April
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
bonapart july-16-2013
noorullah111 july-03-2013 -
shan0001 (male) cr1 interview date july-25-2013 visa issue sep-14-2013
-
PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012Mrtuttie F 8-Aug K1 approved
kismat75900 F 30-Jul F2A approved
Muba F 8-Aug CR1 approved
Yushams F 18-Jul IR1 approved 1 day to get visa 19-Jul
hbk2010 F 13-Aug-13 IR1 approved visa issued 27-Aug-13
BostonLovesPakist F 20-Aug IR1 AP visa issued 5-Sep-13 15 days
ALLUneedisLove M 22-Aug IR1 AP visa issued 28-Aug-13 6 days
H&Z M 30-Aug IR1 approved 7-10 days will issue
afarooq101 (male) interview date july-17-2013 one month AP visa issue
bostonlovepakistan (female) interview date aug-20-2013 visa received sep-09-2013
lonely15 ( male) interview date april-22-2013 visa received sep-09-2013
khan.usman ( female ) interview date july-12-2013 visa issue sep-12-2013
jboss ( female ) interview date july-11-2013 visa issue sep-13-2013
vsc-sucks (male) interview date aug-06-2013 visa issue sep-13-2013
a-ameer (male) FB1 interview date aug-01-2013 visa issue sep-04-2013
rass (female) interview date aug-12-2013 visa issue sep-05-2013
L37 (female) interview was a week ago visa issue sep-13-2013
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending APAPRIL
salman khan april-19-2012
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013janetusman (male) IR-1 jan-23-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) march-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) iR1 march-06-2013
mariamnasir (male) march-08-2013
April
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
bonapart july-16-2013
noorullah111 july-03-2013 -
L37 (female) interview was a week ago visa issue sep-13-2013
-
a-ameer (male) FB1 interview date aug-01-2013 visa issue sep-04-2013
rass (female) interview date aug-12-2013 visa issue sep-05-2013
-
PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012Mrtuttie F 8-Aug K1 approved
kismat75900 F 30-Jul F2A approved
Muba F 8-Aug CR1 approved
Yushams F 18-Jul IR1 approved 1 day to get visa 19-Jul
hbk2010 F 13-Aug-13 IR1 approved visa issued 27-Aug-13
BostonLovesPakist F 20-Aug IR1 AP visa issued 5-Sep-13 15 days
ALLUneedisLove M 22-Aug IR1 AP visa issued 28-Aug-13 6 days
H&Z M 30-Aug IR1 approved 7-10 days will issue
afarooq101 (male) interview date july-17-2013 one month AP visa issue
bostonlovepakistan (female) interview date aug-20-2013 visa received sep-09-2013
lonely15 ( male) interview date april-22-2013 visa received sep-09-2013
khan.usman ( female ) interview date july-12-2013 visa issue sep-12-2013
jboss ( female ) interview date july-11-2013 visa issue sep-13-2013
vsc-sucks (male) interview date aug-06-2013 visa issue sep-13-2013
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending APAPRIL
salman khan april-19-2012
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013janetusman (male) IR-1 jan-23-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) march-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) iR1 march-06-2013
mariamnasir (male) march-08-2013
April
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
bonapart july-16-2013
noorullah111 july-03-2013 -
jboss ( female ) interview date july-11-2013 visa issue sep-13-2013
vsc-sucks (male) interview date aug-06-2013 visa issue sep-13-2013
-
PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012Mrtuttie F 8-Aug K1 approved
kismat75900 F 30-Jul F2A approved
Muba F 8-Aug CR1 approved
Yushams F 18-Jul IR1 approved 1 day to get visa 19-Jul
hbk2010 F 13-Aug-13 IR1 approved visa issued 27-Aug-13
BostonLovesPakist F 20-Aug IR1 AP visa issued 5-Sep-13 15 days
ALLUneedisLove M 22-Aug IR1 AP visa issued 28-Aug-13 6 days
H&Z M 30-Aug IR1 approved 7-10 days will issue
afarooq101 (male) interview date july-17-2013 one month AP visa issue
bostonlovepakistan (female) interview date aug-20-2013 visa received sep-09-2013
lonely15 ( male) interview date april-22-2013 visa received sep-09-2013
khan.usman ( female ) interview date july-12-2013 visa issue sep-12-2013
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending APAPRIL
salman khan april-19-2012
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013janetusman (male) IR-1 jan-23-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) march-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) iR1 march-06-2013
mariamnasir (male) march-08-2013
April
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
jboss ( female ) july-11-2013
bonapart july-16-2013
noorullah111 july-03-2013 -
PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012Mrtuttie F 8-Aug K1 approved
kismat75900 F 30-Jul F2A approved
Muba F 8-Aug CR1 approved
Yushams F 18-Jul IR1 approved 1 day to get visa 19-Jul
hbk2010 F 13-Aug-13 IR1 approved visa issued 27-Aug-13
BostonLovesPakist F 20-Aug IR1 AP visa issued 5-Sep-13 15 days
ALLUneedisLove M 22-Aug IR1 AP visa issued 28-Aug-13 6 days
H&Z M 30-Aug IR1 approved 7-10 days will issue
afarooq101 (male) interview date july-17-2013 one month AP visa issue
bostonlovepakistan (female) interview date aug-20-2013 visa received sep-09-2013
lonely15 ( male) interview date april-22-2013 visa received sep-09-2013
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending APAPRIL
salman khan april-19-2012
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
Heartandsoul CR1 (male) June 21 2012 Denied/trying to keep case at embassy
Anas & Ayesha CR1 (Male) June 27th 2012 Denied/trying to keep case at embassy
Aisha& Wajid CR1 June 29 2012 Denied/trying to keep case at embassy
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013janetusman (male) IR-1 jan-23-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) march-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) iR1 march-06-2013
mariamnasir (male) march-08-2013
April
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
khan.usman female july-12-2013
jboss female july-11-2013
bonapart july-16-2013
noorullah111 july-03-2013 -
PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012Mrtuttie F 8-Aug K1 approved
kismat75900 F 30-Jul F2A approved
Muba F 8-Aug CR1 approved
Yushams F 18-Jul IR1 approved 1 day to get visa 19-Jul
hbk2010 F 13-Aug-13 IR1 approved visa issued 27-Aug-13
BostonLovesPakist F 20-Aug IR1 AP visa issued 5-Sep-13 15 days
ALLUneedisLove M 22-Aug IR1 AP visa issued 28-Aug-13 6 days
H&Z M 30-Aug IR1 approved 7-10 days will issue
afarooq101 (male) interview date july-17-2013 one month AP visa issue
bostonlovepakistan (female) interview date aug-20-2013 visa received sep-09-2013
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending APAPRIL
salman khan april-19-2012
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
Heartandsoul CR1 (male) June 21 2012 Denied/trying to keep case at embassy
Anas & Ayesha CR1 (Male) June 27th 2012 Denied/trying to keep case at embassy
Aisha& Wajid CR1 June 29 2012 Denied/trying to keep case at embassy
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013janetusman (male) IR-1 jan-23-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) march-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) iR1 march-06-2013
mariamnasir (male) march-08-2013
April
lonley 15 (male) april-22-2013
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
khan.usman female july-12-2013
jboss female july-11-2013
bonapart july-16-2013
noorullah111 july-03-2013 -
PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012Mrtuttie F 8-Aug K1 approved
kismat75900 F 30-Jul F2A approved
Muba F 8-Aug CR1 approved
Yushams F 18-Jul IR1 approved 1 day to get visa 19-Jul
hbk2010 F 13-Aug-13 IR1 approved visa issued 27-Aug-13
BostonLovesPakist F 20-Aug IR1 AP visa issued 5-Sep-13 15 days
ALLUneedisLove M 22-Aug IR1 AP visa issued 28-Aug-13 6 days
H&Z M 30-Aug IR1 approved 7-10 days will issue
afarooq101 (male) interview date july-17-2013 one month AP visa issue
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending APAPRIL
salman khan april-19-2012
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
Heartandsoul CR1 (male) June 21 2012 Denied/trying to keep case at embassy
Anas & Ayesha CR1 (Male) June 27th 2012 Denied/trying to keep case at embassy
Aisha& Wajid CR1 June 29 2012 Denied/trying to keep case at embassy
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013janetusman (male) IR-1 jan-23-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) arch-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) march-06-2913
mariamnasir (male) march-08-2013
April
lonley 15 (male) april-22-2013
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
khan.usman female july-12-2013
jboss female july-11-2013
bonapart july-16-2013
noorullah111 july-03-2013 -
PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012Mrtuttie F 8-Aug K1 approved
kismat75900 F 30-Jul F2A approved
Muba F 8-Aug CR1 approved
Yushams F 18-Jul IR1 approved 1 day to get visa 19-Jul
hbk2010 F 13-Aug-13 IR1 approved visa issued 27-Aug-13
BostonLovesPakist F 20-Aug IR1 AP visa issued 5-Sep-13 15 days
ALLUneedisLove M 22-Aug IR1 AP visa issued 28-Aug-13 6 days
H&Z M 30-Aug IR1 approved 7-10 days will issue
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
APRIL
salman khan april-19-2012
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending AP
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
Heartandsoul CR1 (male) June 21 2012 Denied/trying to keep case at embassy
Anas & Ayesha CR1 (Male) June 27th 2012 Denied/trying to keep case at embassy
Aisha& Wajid CR1 June 29 2012 Denied/trying to keep case at embassy
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013janetusman (male) IR-1 jan-23-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) arch-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) march-06-2913
mariamnasir (male) march-08-2013
April
lonley 15 (male) april-22-2013
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
khan.usman female july-12-2013
jboss female july-11-2013
bonapart july-16-2013
noorullah111 july-03-2013 -
PLEASE FEEL FREE TO COPY AND ADD YOUR INFORMATION AS ITS UPDATED AND REPOST
***UPDATED***
VISAS ISSUED
s.ali interview CR1 (male) Sept 21, 2011------- Visa Received 3 months later
Barikhan F-2A visa Sept 22nd 2011 --------Visa over 3 months later
S&S CR1 (male) Oct 19, 2011 --------------Visa issued 2 months and 2 days later
shmalik K1 (male) Nov 2011 Visa -------------received Jan 6, 2012-2-3 months?
a and k K1 (male) June 6, 2011 ------------Jan 9th 2012 to pick up visa---7 months of AP
Winning23 K1 (female) December 19th 2011 ----- AP for 3 weeks
Syed Ali (B1/B2 Visit Visa) Dec 2010 AP-------- Visa received Jan 25, 2012--1-2 months?
Lahori82 CR1 (female) Dec 20, 2011 ---------------Visa in 1.5 months
SM-pk CR1 (female) Oct 2011 AP ----------------visa received FEb 9th 2012--4 months?
Faki CR1 (male) September 30th, 2011 -----------visa received 4 months
Forever Love Cr1 May 26th 2011 ---------------received March 1, 2012 after 9 months and 6 days
RealAl Cr1 (Male) 1st Interview - April 9, 2011 --------Visa issued March 4th 2012-11 months of AP
Gil1234 K1 (male) June 6th, 2011 -----------------VISA received March 14 2012-9 months and 1 week of AP
gtvapsamtik Interview CR1 (female) July 14th 2011 AP/AR--Visa received at 8 months 3 weeks after interview
bilal coudhary CR1 (male) Oct 6, 2011 pending additional AP------- Visa received April 19 2012 6 1/2 months after interview
longtimewaiter CR1 (male) April 2011 pending AP---------- Visa received April 19 2012 1 yr after interview
Worth_the_Wait K1 (male) Feb 23 2012 pending AP--------Visa issued April 30 2012 2 months and 1 week after interview
RiaB CR1 (Male) May 17th 2012-----approved at interview waiting for Visa to be issued (Visa issued May 19th 2012 received May 21 2012)---4 days after interview
khuram CR1 (female) interview Aug 10th, 2011 pending AP ------- Visa Issued April 23 2012 8 1/2 months after interview
Faisal khan CR1 (male) Oct 13th 2011 pending AP-------June 8 AMEX called to pick up Visa 7 months 3 weeks after interview--- Visa received June 11 2012
Adeelwali K1-May 16, 2011 interview AP (DOS says Visa issued June 13th- 1 yr 1 month after interview --- Visa received June 25 2012
John Dam Dam K1 male March 22 2012 interview ---visa received June 22 2012 3 months after interview
Sabrina.Asad CR1 (male) Dec 19th 2011 pending AP/ visa issued July 23 2012--- almost 7 months after interview
Steamcake CR1 July 23 2012 visa approved/waiting on issuance
hyder_ejaz Student Visa July 23 2012/pending AP/---visa issued August 1 2012 --8 days after interview
Naum CR1 (Male) July 31st 2012 Visa Approved/waiting on issuance
SarahZeeshan CR1 August 29 2012 Visa Approved -- Visa issued August 30th 2012
Samsamir CR1 Female July 2011 requested updated documents July 2012 Visa issued August 30 2012--- 1 yr 1 month after
Muzammil K1 Visa (male) July 17 2012 Interview --- VISA ISSUED ON 11th OCTOBER, 2012!! YEA!!!!!!
Princess18 CR1 July 30th 2012 Visa issued after 3 and a half weeks of AP
Sabian K3 (male) July 11, 2011 Pending AP-sent back to uscis---IN USA OCT1, 2012!!
sn530 K1 (female) October 18 2012 approved!
Funfetti CR1 (male) Sept 7 2012 visa issued
MBA2012 CR1 (Female).....1st Interview Dec 22, 2011; 2nd Interview Feb 13, 2012.....Pending AP---- VISA ISSUED 11 months 3 days after 1st interview
Emran+Farah CR1 (male) Sept 14 2012---- visa issued Jan 1 2013 (3.5 months AP)
s&S88 interview CR1 (male) Sept 28,2011--- Visa issued Jan 4 2013 (15 months of AP)
amjadasn F2a interview on 01 November 2012--visa issued JAn 8 2013 (2 months 1 week AP)
Hunk (male) CR1 Jan 9 2013 visa approved and issued
Omer1 K1 (male) Jan 17 2013---------------------------------Received visa 19 days
Anumj IR1/CR1 (she) interview Jan 24, 2013-------------------visa issued after 20 days
ALI777------------------------------------------------------She got visa after 13 months AP
shoboali K3 December 28 2012 -------------------------------Got visa after ???
WaitingAP (male) CR1 Sept 20 2011----------------------------Visa after almost 18months of AP!
Raheel Jiva interview dec 2011, filed waiver, then waited in AP for 2 months and she got the visa (1 months after new documents submitted)
Shonamona Jan 3 and visa issued Feb 22, 2013 (days after submitting new documents)
haseeb anjum interview June 4, 2012---------------------------He got the visa March 26, 2013 (1 month after submitting new papers)
Melwatin Interview Dec 12, 2012---------------------------Visa issued first week of July
samra naz interview date sep-09-2011 received visa APR-17-2013
f khan received visa after one year AP interview date aug-7-2012
***PENDING AP***
2010 Interviews
maabish interview CR1 (male) 28 july 2010 pending AP
Soccer.player FB-2 (male) Sept 9th 2010 pending for both AP and current Priority Date/ Requested fresh DS230, Medical and PCC from embassy/Embassy requested return of passport
2011 Interviews
MARCH
Rafinoori CR1 (male) March 10th 2011 joint sponsor requested pending AP
Pari786 CR1 (male) March 2 2011 pending AP
APRIL
salman khan april-19-2012
MAY
Carolynhotstuff CR1 (Male) 2nd Interview May 8th 2011 pending AP/January 12, 2012 Home investigation/ Jan 24th 2012 Congressman got reply from Assistant Counsel at embassy that he will look into their case/ Case sent back to USCIS/received NOIR/replied to NOIR-case reaffirmed June 11 2012
Lots of Patience CR1 May 8th 2011 pending AP
Ridacat IR1 May 24, 2011 pending AP
JUNE
Eabbas Interview CR1 (male) June 15th 2011 Mandatory ap
JULY
BrokenHeartD (male) CR1 July 5th 2011 pending AP/ July 10 2012 received a call from Embassy to submit his medical and ds230
sm2010 CR1 (male) interview on July 12, 2011 pending AP
Austin Guy (Male- 69 yr old father) July 12,2011 pending AP
aishanabeel (male) CR1 July 25 2011 pending AP/requested 2nd biometrics July 12 2012
rushingwaves july-2011
September
francengland sep-2011
OCTOBER
Maila CR1 Oct 6th pending AP
DECEMBER
sajidla IR1 Interview date Dec 19, 2011 Pending AP
far316 CR1 (female) December 21 2011 pending AP
2012 Interviews
JANUARY
Yoursonly CR1 Jan 26th 2012 pending AP
Fahad99 CR1 (male) Jan 30 2012 pending AP
bad luck jan-2012
mg2012 jan-5-2012
feb
jklm05 feb-2012
MARCH
mrjanu85---changed name "ssb1987" March 9, 2012- pending AP
JUNE
Lady Killer F2A June 15 2012 AP pending
FifiSabz CR1 (male) June 14 2012 AP pending
Heartandsoul CR1 (male) June 21 2012 Denied/trying to keep case at embassy
Anas & Ayesha CR1 (Male) June 27th 2012 Denied/trying to keep case at embassy
Aisha& Wajid CR1 June 29 2012 Denied/trying to keep case at embassy
stabbingecstasy ( female ) june-11-2012
JULY
the machanic july-31-2012
AUGUST
mosa khan k1 aug-09-2012
SEPTEMBER
Zinger K1 (male) Sept 20 AP pending
virgo (male) sep 2012
ayan-khaan sep-2012
OCTOBER
Desibaaba CR1(female) Oct 15 AP Pending
sam7076 oct-01-2012
ali k oct-24-2012
NOVEMBER
Saj&Anum CR1(female) Nov 19 2012 AP Pending
adnan505 nov-29-2012
sameer khan nov-27-2012
DECEMBER
bad time dec-03-2012
ahmed jutt k1 dec-13-2012
asad 381 dec-12-2012
sandymuzzkinz(female)dec-17-2012
2013 interviews
january
sj24 (male) jan-2013
sugheil nawaz k1 jan-18-2013
muni me (male)k1 jan-24-2013
feb
arslanyousuf feb-12-2013
march
sam&waq (male) arch-08-2013
musashii (male) march-20-2013
mizzusa (male) march-06-2013
rayanj (male) march-06-2913
mariamnasir (male) march-08-2013
April
lonley 15 (male) april-22-2013
rmart (male) april-23-2013
puppylove (male) april-18-2013
tiffandrazz april-01-2013
syed zaidi apr-09-2013
Waleed39- F4 interviewed April-2-2013
May
k and e may-17-2013
salman-eme1 may-20-2013
junglegym (f2a) may-29-2013
june
coltoasty (female) june-17-2013
saphire925 june-06-2013
kk100 june-2013
july
khan.usman female july-12-2013
jboss female july-11-2013
bonapart july-16-2013
noorullah111 july-03-2013 -
-
congratulation .....! f khan
New Islamabad AP Tracker
in Waivers (I-601 and I-212) and Administrative Processes (221g)
Posted
jklm05 and puppylove
Listen i am up dating this everyday because people are getting visas everyday not once in a month but if you guys dont like it i wont do it again