  1. Yes, my hubby got the same exact letter (221G)~ except on his they checked off what was missing and to mail it in with passport, he also was given courier label with our case # on it.... Gosh you must be even more frustrated since they didn't say anything.... ugh.. Yes, I guess wait and see is all that can be done at this point.

    So I guess there really is no formula for this... your hubby's interview went good and all and he got the same form... Let's hope both our cases will be resolved soon. Good luck to both of us I guess unsure.png

    Yeah I'm frusturated since we don't know what we are missing. If we at least knew that much, we would be at an ease and start collecting our documents. And my hubby took everything we could possibly think of to the interview- chat records/phone/receipts/my visit/pics/etc.. but they didn't ask him for a single thing. Just my joint sponsor's 2012 tax return. *sigh* Gluck to you too!

  2. I know exactly what you're going through. Just hoping it works out for all of us. My hubby's interview went very well, had all questions answered and such, but at the end, hubby was given a 221G AP, but they didn't tell him what he was missing, neither did they tell him what additional documents and such to submit. And when my hubby asked the officer, the officer just smiled and said don't worry (x2). So we are just sitting here waiting for them to update us and tell us if we are missing anything or if they need anything else so we can submit that. I dont know what to do till then. I called DOS and he said the officer should have told my husband what was missing when he gave him the 221G, but the officer didn't say anything, which is why we are confused. He handed my husband the passport back with that letter, without anything else :( So we have no idea what to do next, except wait and see. The officer said they'll get back to us in a couple of weeks and the status online just says administrative processing. I dont know how long it'll take, just praying praying praying REALLY hard that all goes well and smooth.

  3. Hey all, I know this post has nothing to do with PCC, but I was wondering if anyone else had any experience with what i have--I'm depressed :(


    My husband had his interview on june 6th, and he got a white letter section 221g-administrative processing sad.png What i was really surprised about was that they gave him his passport back! The officer did not notify him of any missing documents or if they needed additional info. The letter doesn't say what the required documents are. It just says it's incomplete and we will contact you in a couple of weeks. The officer told my hubby not to worry and that they will get back to him in few weeks. This is at the Mumbai consulate. I have no idea why its under processing sad.png So I guess they gave an AP for no reason? I just want to know the reason, and if we need to submit any documents- I want to start on that now, but they did not give us any reason whatsoever. I am sure all the documents we had submitted were sufficient and up-to-date, so I'm not sure why it's under processing. Does anyone know the time frame, how long it takes for this to clear? I called DOS and he said if the officer didn't tell him of any missing documents, then we'll just have to wait for them to contact us.. but the wait is so agonizing sad.png


  4. Hey guys ..im bummed outttt sad.png

    My husband had his interview on june 6th, and he got a white letter section 221g-administrative processing sad.png What i was really surprised about was that they gave him his passport back. The officer did not notify him of any missing documents or if they needed additional info. The letter doesn't say what the required documents are. It just says it's incomplete and we will contact you in a couple of weeks. The officer told my hubby not to worry and that they will get back to him in few weeks. This is at the Mumbai consulate. does anyone else have any experience with this?! I have no idea why its under processing sad.png So I guess they gave an AP for no reason? I just want to know the reason, and if we need to submit any documents- I want to start on that now, but they did not give us any reason whatsoever. I am sure all the documents we had submitted were sufficient and up-to-date, so I'm not sure why it's under processing. Does anyone know the time frame, how long it takes for this to clear? I called DOS and he said if the officer didn't tell him of any missing documents, then we'll just have to wait for them to contact us.. but the wait is so agonizing :(

  5. That is normal circumstances and I see this all the time. CO should tell him why and what is missing or needed when they handed over 221g slip. Once you or him have full fill the RFE checklist they asks for, on the attach form along with 221g should tell you where to submit them for second interview.

    That is normal circumstances and I see this all the time. CO should tell him why and what is missing or needed when they handed over 221g slip. Once you or him have full fill the RFE checklist they asks for, on the attach form along with 221g should tell you where to submit them for second interview.

    Yes, but that is the thing. The officer never told him what was missing or any additional documnets that they required. How are we supposed to know what additional docs we need to send? Or any of the missing info?????

    I'm seriously so depressed :(

    How long can the processing take??

  6. GUYS Im bummed outttt :(

    my husband just had his interview and he got the section 221g. administerative processing :( this is in mumbai, india. what does this mean!?! the form says that its incomplete but we had all the documents they needed for the case complete and thereafter. he took the 2012 tax return for my joint sponsor that they asked for. the officer asked only 3 questions and then handed him that 221g form :( does anyone else have any experience with this?! I have no idea why its under processing :( everything was running so smoothly that i didnt not expect this at alll :(

    someone please advise and helppppp :(

  7. Hooray!! My husband will make it for the 4th of July and his birthday!! goofy.gif

    DO NOT DELETE: ***USE MOST RECENT LIST AT THE BOTTOM***

    Instructions:

    If you want to share your case complete and interview dates:

    1. Go to LAST PAGE or before and click "Quote/Reply" on the MOST RECENT LIST.

    2. Ask for help only if you will mess up the list

    3. Please make sure you are using Rich Text Editor as your message setting(Settings>Posting Settings->Enable visual (RTE))

    4. Remove

    (top and bottom) around the list by clicking back space just before "do not delete"

    5. Always use [Courier New] Font. (It will stay lined up correctly if you use the correct font.)

    6. Add in order by NVC case complete date.

    7. Add the date you received your interview date so others can see from case complete to assignment time-frame.

    August Cases Waiting on Interview:

    NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

    missing you babe....08/14/12....04/01/13....05/21/13....IR-1.........Yemen

    December Cases Waiting on Interview:

    NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

    Gringa Chapina......12/11/12....04/19/13....05/22/13....IR-1.........Guatemala

    March Cases Waiting on Interview:

    NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

    meltemapo...........03/01/13....05/01/13....06/03/13....IR-1/CR-1....Turkey

    John & Jeni.........03/01/13....03/29/13....05/14/13....IR-1/CR-1....Greece

    oohpartiv...........03/05/13....04/24/13....05/29/13....IR-1.........Ecuador

    K n E...............03/08/13....04/02/13....05/17/13....IR-1/CR-1....Pakistan

    Highyella72.........03/11/13....04/02/13....05/06/13....IR-1/CR-1....Nigeria

    FeFrSaKa............03/12/13....04/30/13....06/11/13....IR-1.........Ecuador

    Aladlhassan.........03/13/13....04/02/13....05/20/13....IR-1/CR-1....Morocco

    Judy2Rock...........03/13/13....04/02/13....05/21/13....IR-1/CR-1....Jamaica

    TeamMcGregor........03/15/13....03/29/13....05/15/13....IR-1/CR-1....Dominican Rep.

    Mina90..............03/15/13....04/01/13....05/05/13....IR-1/CR-1....Bangladesh

    martha brown03......03/18/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Kenya

    MeredythB...........03/20/13....04/01/13....05/07/13....IR-1/CR-1....Ireland

    Vicki&Nanuka........03/20/13....04/30/13....06/17/13....IR-1/CR-1....Nigeria

    Mar_Wil.............03/20/13....03/30/13....05/02/13....IR-1.........Philippines

    Sunflower123........03/20/13....03/29/13....05/13/13....IR-1/CR-1....Mexico

    Roosha..............03/22/13....03/29/13....05/19/13....IR-1/CR-1....Qatar

    kwakuoj.............03/22/13....04/01/13....05/15/13....IR-1/CR-1....Ghana

    Oriz................03/22/13....04/01/13....05/06/13....IR-1.........Israel

    babyjk .............03/26/13....04/01/13....05/08/13....IR-1/CR-1....Barbados

    elle13 .............03/26/13....04/01/13....05/02/13....IR-1/CR-1....Malaysia

    Bongnhanna..........03/26/13....04/02/13....05/28/13....IR-1/CR-1....Phnom Penh

    Toff................03/26/13....04/10/13....05/07/13....IR-1/CR-1....Australia

    MikeJill............03/27/13....04/01/13....05/14/13....IR-1/CR-1....UK

    Mrs&Mr..............03/27/13....03/29/13....05/24/13....IR-1/CR-1....Greece

    RajNav..............03/29/13....04/01/13....05/10/13....IR-1/CR-1....India

    Aleigh36............03/29/13....04/01/13....05/15/13....IR-1/CR-1....UK

    watergirl76.........03/29/13....04/03/13....05/08/13....IR-1/CR-1....Canada

    lonelyboy2003.......03/29/13....04/30/13....06/11/13....IR-1/CR-1....Ho ChiMinh,Vt Nam

    April Cases Waiting on Interview:

    NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

    s$susauk............04/01/13....04/01/13....05/28/13....IR-1/CR-1....UK

    floyd...............04/01/13....04/01/13....05/09/13....IR-1/CR-1....India

    Chetsky.............04/02/13....05/01/13....06/03/13....IR-1.........Philippines

    NYCBound............04/02/13....04/12/13....05/15/13....IR-1.........Canada

    valprime............04/03/13....04/12/13....05/30/13....IR-1/CR-1....Canada

    romanticminds.......04/03/13....xx/xx/xx....xx/xx/13....IR-1.........Cambodia

    Aprice138...........04/04/13....04/10/13....05/21/13....IR-1/CR-1....New Zealand

    YA 1127.............04/04/13....05/01/13....06/21/13....IR-1/CR-1....Dominican Rep.

    lyra................04/05/13....04/11/13....05/16/13....IR-1/CR-1....Malaysia

    dopeyzn.............04/06/13....04/10/13....05/02/13....IR-1/CR-1....Switzerland

    SMANNE..............04/08/13....04/30/13....06/21/13....IR-1/CR-1....Nigeria

    srloring13..........04/09/13....04/30/13....06/13/13....IR-1/CR-1....Nigeria

    Zara1124............04/09/13....04/10/13....05/29/13....IR-1/CR-1....Pakistan

    sai.mi28............04/09/13....05/01/13....06/04/13....CR-1.........Philippines

    Panda Sky3..........04/10/13....04/11/13....05/13/13....IR-1/CR-1....Myanmar

    arriyan.............04/10/13....04/29/13....06/21/13....IR-1/CR-1....Singapore

    EmilyMary...........04/11/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Bermuda

    teysha..............04/12/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Haiti

    SundayBelinda.......04/12/13....04/30/13....06/06/13....IR-1/CR-1....Nigeria

    NikiR...............04/15/13....05/01/13....06/03/13....CR-1.........Canada

    ErinBeth............04/15/13....04/30/13....06/11/13....CR-1.........Morocco

    JandRP..............04/15/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Jamaica

    fav13259............04/15/13....xx/xx/13....06/24/13....IR-1/CR-1....Mexico

    Pluis...............04/15/13....04/29/13....06/25/13....IR-1/CR-1....The Netherlands

    Jbda................04/16/13....05/01/13....06/24/13....IR-1/CR-1....Turkey

    champi..............04/16/13....05/01/13....06/03/13....IR-5.........India

    Avram...............04/17/13....04/29/13....06/26/13....IR-1/CR-1....Macedonia

    Jonelo..............04/18/13....04/30/13....06/12/13....IR-1/CR-1....Romania

    A & C...............04/18/13....05/02/13....06/03/13....CR-1.........Canada

    MGRD................04/19/13....04/29/13....06/24/13....IR-1/CR-1....Haiti

    Ess.................04/19/13....05/01/13....06/13/13....IR-1/CR-1....Pakistan

    Mady................04/22/13....04/29/13....06/04/13....IR-1/CR-1....Egypt

    Icede...............04/22/13....05/01/13....06/04/13....IR-1/CR-1....Lithuania

    Ludakrishna.........04/23/13....05/01/13....06/12/13....IR-1/CR-1....India

    T & P...............04/23/13....05/01/13....06/12/13....IR-1/CR-1....India

    Sarsoor............ 04/24/13....04/29/13....06/17/13....IR-1/CR-1....Egypt

    hikergirl...........04/25/13....05/01/13....06/19/13....CR-1.........Canada

    SerenityNOW.........04/26/13....xx/xx/13....xx/xx/13....IR-2.........Bulgaria

    Dr. H and Mrs. H....04/29/13....04/30/13....06/06/13....IR-1/CR-1....Malaysia

    lucy................04/29/13....05/10/13....06/05/13....IR-2.........Barbados

    daphoknee...........04/30/13....05/01/13....06/17/13....IR-1.........Canada

    squirrelisan........04/30/13....05/10/13....06/03/13....CR-1.........South Korea

    Aball...............04/30/13....05/10/13....06/10/13....IR-1/CR-1....Ireland

    LunarStar...........04/30/13....05/13/13....06/10/13....CR-1.........Japan

    May cases waiting on interview:

    NAME COMPLETE RECEIVED INTERVIEW VISA TYPE EMBASSY

    Tanithw.............05/01/13....xx/xx/13....06/03/13....CR-1.........UK

    zamar...............05/01/12....05/13/12....06/06/13....CR-1/IR-1....India

    Eliano..............05/02/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Georgia

    Ixsa................05/03/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Dominican Republic

    Speedwell...........05/06/13....05/13/13....06/14/13....CR-1.........UK

    ppihtr123...........05/06/13....xx/xx/13....xx/xx/13....CR-2/IR-2....Philippines

    raosaab0202.........05/06/13....xx/xx/13....xx/xx/13....CR-1/IR-1....India

    civilservant........05/10/13....05/13/13....06/12/13....CR-1.........UK

    Zandrao.............05/10/13....xx/xx/13....xx/xx/13....IR1/CR-1.....UK

    ainsn...............05/10/13....xx/xx/13....xx/xx/13....IR1..........Bangladesh

  8. Which date would be considered as your case complete date? I'm asking because when I had called NVC, he told me I had a case complete on May 1st, but I received the email on May 8th, so would the case complete date be the day NVC emailed me regarding my case complete? Thanks

    Never mind, I think I found my answer. I believe emails are delayed so I'll go with May 1st- what the rep told me.

  9. DO NOT DELETE: ***USE MOST RECENT LIST AT THE BOTTOM***

    Instructions:

    If you want to share your case complete and interview dates:

    1. Go to LAST PAGE or before and click "Quote/Reply" on the MOST RECENT LIST.

    2. Ask for help only if you will mess up the list

    3. Please make sure you are using Rich Text Editor as your message setting(Settings>Posting Settings->Enable visual (RTE))

    4. Remove

    (top and bottom) around the list by clicking back space just before "do not delete"

    5. Always use [Courier New] Font. (It will stay lined up correctly if you use the correct font.)

    6. Add in order by NVC case complete date.

    7. Add the date you received your interview date so others can see from case complete to assignment time-frame.

    August Cases Waiting on Interview:

    NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

    missing you babe....08/14/12....04/01/13....05/21/13....IR-1.........Yemen

    December Cases Waiting on Interview:

    NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

    Gringa Chapina......12/11/12....04/19/13....05/22/13....IR-1.........Guatemala

    March Cases Waiting on Interview:

    NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

    meltemapo...........03/01/13....05/01/13....06/03/13....IR-1/CR-1....Turkey

    John & Jeni.........03/01/13....03/29/13....05/14/13....IR-1/CR-1....Greece

    oohpartiv...........03/05/13....04/24/13....05/29/13....IR-1.........Ecuador

    K n E...............03/08/13....04/02/13....05/17/13....IR-1/CR-1....Pakistan

    Highyella72.........03/11/13....04/02/13....05/06/13....IR-1/CR-1....Nigeria

    FeFrSaKa............03/12/13....04/30/13....06/11/13....IR-1.........Ecuador

    Aladlhassan.........03/13/13....04/02/13....05/20/13....IR-1/CR-1....Morocco

    Judy2Rock...........03/13/13....04/02/13....05/21/13....IR-1/CR-1....Jamaica

    TeamMcGregor........03/15/13....03/29/13....05/15/13....IR-1/CR-1....Dominican Rep.

    Mina90..............03/15/13....04/01/13....05/05/13....IR-1/CR-1....Bangladesh

    martha brown03......03/18/13....05/03/13....06/24/13....IR-1/CR-1....Kenya

    MeredythB...........03/20/13....04/01/13....05/07/13....IR-1/CR-1....Ireland

    Vicki&Nanuka........03/20/13....04/30/13....06/17/13....IR-1/CR-1....Nigeria

    Mar_Wil.............03/20/13....03/30/13....05/02/13....IR-1.........Philippines

    Sunflower123........03/20/13....03/29/13....05/13/13....IR-1/CR-1....Mexico

    Roosha..............03/22/13....03/29/13....05/19/13....IR-1/CR-1....Qatar

    kwakuoj.............03/22/13....04/01/13....05/15/13....IR-1/CR-1....Ghana

    Oriz................03/22/13....04/01/13....05/06/13....IR-1.........Israel

    babyjk .............03/26/13....04/01/13....05/08/13....IR-1/CR-1....Barbados

    elle13 .............03/26/13....04/01/13....05/02/13....IR-1/CR-1....Malaysia

    Bongnhanna..........03/26/13....04/02/13....05/28/13....IR-1/CR-1....Phnom Penh

    Toff................03/26/13....04/10/13....05/07/13....IR-1/CR-1....Australia

    MikeJill............03/27/13....04/01/13....05/14/13....IR-1/CR-1....UK

    Mrs&Mr..............03/27/13....03/29/13....05/24/13....IR-1/CR-1....Greece

    RajNav..............03/29/13....04/01/13....05/10/13....IR-1/CR-1....India

    Aleigh36............03/29/13....04/01/13....05/15/13....IR-1/CR-1....UK

    watergirl76.........03/29/13....04/03/13....05/08/13....IR-1/CR-1....Canada

    lonelyboy2003.......03/29/13....04/30/13....06/11/13....IR-1/CR-1....Ho ChiMinh,Vt Nam

    April Cases Waiting on Interview:

    NAME................COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

    s$susauk............04/01/13....04/01/13....05/28/13....IR-1/CR-1....UK

    floyd...............04/01/13....04/01/13....05/09/13....IR-1/CR-1....India

    Chetsky.............04/02/13....05/01/13....06/03/13....IR-1.........Philippines

    NYCBound............04/02/13....04/12/13....05/15/13....IR-1.........Canada

    valprime............04/03/13....04/12/13....05/30/13....IR-1/CR-1....Canada

    romanticminds.......04/03/13....xx/xx/xx....xx/xx/13....IR-1.........Cambodia

    Aprice138...........04/04/13....04/10/13....05/21/13....IR-1/CR-1....New Zealand

    YA 1127.............04/04/13....05/01/13....06/21/13....IR-1/CR-1....Dominican Rep.

    lyra................04/05/13....04/11/13....05/16/13....IR-1/CR-1....Malaysia

    dopeyzn.............04/06/13....04/10/13....05/02/13....IR-1/CR-1....Switzerland

    SMANNE..............04/08/13....04/30/13....06/21/13....IR-1/CR-1....Nigeria

    srloring13..........04/09/13....04/30/13....06/13/13....IR-1/CR-1....Nigeria

    Zara1124............04/09/13....04/10/13....05/29/13....IR-1/CR-1....Pakistan

    sai.mi28............04/09/13....05/01/13....06/04/13....CR-1.........Philippines

    Panda Sky3..........04/10/13....04/11/13....05/13/13....IR-1/CR-1....Myanmar

    arriyan.............04/10/13....04/29/13....06/21/13....IR-1/CR-1....Singapore

    EmilyMary...........04/11/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Bermuda

    teysha..............04/12/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Haiti

    SundayBelinda.......04/12/13....04/30/13....06/06/13....IR-1/CR-1....Nigeria

    NikiR...............04/15/13....05/01/13....06/03/13....CR-1.........Canada

    ErinBeth............04/15/13....04/30/13....06/11/13....CR-1.........Morocco

    JandRP..............04/15/13....xx/xx/13....xx/xx/13....IR-1/CR-1....Jamaica

    fav13259............04/15/13....xx/xx/13....06/24/13....IR-1/CR-1....Mexico

    Pluis...............04/15/13....04/29/13....06/25/13....IR-1/CR-1....The Netherlands

    Jbda................04/16/13....05/01/13....06/24/13....IR-1/CR-1....Turkey

    champi..............04/16/13....05/01/13....06/03/13....IR-5.........India

    Avram...............04/17/13....04/29/13....06/26/13....IR-1/CR-1....Macedonia

    Jonelo..............04/18/13....04/30/13....06/12/13....IR-1/CR-1....Romania

    A & C...............04/18/13....05/02/13....06/03/13....CR-1.........Canada

    MGRD................04/19/13....04/29/13....06/24/13....IR-1/CR-1....Haiti

    Ess.................04/19/13....05/01/13....06/13/13....IR-1/CR-1....Pakistan

    Mady................04/22/13....04/29/13....06/04/13....IR-1/CR-1....Egypt

    Icede...............04/22/13....05/01/13....06/04/13....IR-1/CR-1....Lithuania

    Ludakrishna.........04/23/13....05/01/13....06/12/13....IR-1/CR-1....India

    T & P...............04/23/13....05/01/13....06/12/13....IR-1/CR-1....India

    Sarsoor............ 04/24/13....04/29/13....06/17/13....IR-1/CR-1....Egypt

    hikergirl...........04/25/13....05/01/13....06/19/13....CR-1.........Canada

    SerenityNOW.........04/26/13....xx/xx/13....xx/xx/13....IR-2.........Bulgaria

    Dr. H and Mrs. H....04/29/13....04/30/13....06/06/13....IR-1/CR-1....Malaysia

    lucy................04/29/13....xx/xx/13....xx/xx/13....IR-2/CR-2....Barbados

    daphoknee...........04/30/13....05/01/13....06/17/13....IR-1.........Canada

    May cases waiting on interview:

    NAME COMPLETE RECEIVED INTERVIEW VISA TYPE EMBASSY

    Tanithw.............05/01/13....xx/xx/13....06/03/13....CR-1.........UK

    Eliano..............05/02/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Georgia

    Ixsa................05/03/13....xx/xx/13....xx/xx/13....CR-1/IR-1....Dominican Republic

    Speedwell...........05/06/13....xx/xx/13....xx/xx/13....CR-1.........UK

    ppihtr123...........05/06/13....xx/xx/13....xx/xx/13....CR-2/IR-2....Philippines

    Hello, please add me to the list. My case complete was 05/01/13, IR-2/CR-1 visa, India Embassy

    Thanks!

  10. Congrats! This is why I suggest calling every day so you're as up to date as possible wink.png

    And you can start doing your own research here: http://www.visajourney.com/timeline/k1list.php?cfl=0&op1=3&op2=d&op3=5&op4=1&op5=5,6,8,10,11,13,14,15,16,17,18,20,21,22,25,26,27,28,108,110,111,208,210,211&op6=All&op7=India&dfile=No&adv=

    Since there's more than just one embassy in India, make sure you ignore the time lines of people going through different embassies than you as it's likely they have different time frames.

    Thank you Saylin. I got the email from NVC yesterday about the case completes. I checked out a few timelines for the specific embassy and most people had 2 months till interview. Some had a month after case complete. So I'll just have to wait patiently :)

  11. I called yesterday and found out we had a CASE COMPLETE on May 1st!!!!! I called them on April 30th and had no news then. I wish I called last week to get the news earlier! Anyways, I'm so happy!!!!! dancin5hr.gif Thank you Saylin, Darnell, and everyone else who was so helpful throughout the whole process!!!! Now waiting for an interview date. Does anyone have an estimate how long it'll be? It's for Mumbai, India. THANK YOU!!!!!!kicking.gifkicking.gifkicking.gifkicking.gifkicking.gif

  12. PCC isnt required at NVC but your husband would need to take the original PCC with him to the interview. Make sure he also takes a photocopy with him as they will need to keep a copy.

    Yeah, that's what NVC told me. But NVC has the original PCC since we sent it with the IV package. We do have photocopy, but not the original. Will NVC send the PCC along with the rest of the documents to the embassy?

  13. Yeah, not too sure about the PCC, if you sent it. But, if they say the IV package is accepted, that's good news. As far as I know, they do another review after both packages have been accepted, and then close the case. Let's hope the PCC passes the test a second time and they close the case.

    Yeah I have my fingers crossed that everything goes well without another checklist/RFE! I already called NVC and spoke to 2 different people and both of them told me the IV package was completed. My AOS should be received tomorrow. I'll call tomorrow one more time to make sure again and then take a deep breath :lol:

  14. what, exactly? i think you are confused.

    NVC asks for it, it's part of the doc intake process. Don't have it or don't want to send it with the DS-230 ? That's ok, must to bring on interview day.

    AFTER THE INTERVIEW, there is no reason for the beneficiary to keep it, the original PCC goes with the casefile (not the beneficiary).

    Sorry, I think I am confused :unsure: lol.

    The reason I was asking was because they had sent me a checklist about the PCC today, when yesterday they told me the IV package was complete and accepted.

    I wasn't talking about AFTER the interview. I see that it's part of the doc intake process and they said bring it ON THE DAY of interview. Maybe that's what NVC meant when he said that they don't need the PCC.

    Thank you for the reply Darnell! My AOS should be delivered to them tomorrow, so I'm just hoping to get a case complete soon.

  15. Why do you need the PCC after the interview ? For other US Consulates/Embassies IV Unit, the original PCC is kept, no one needs another or even a copy after the interview.

    Yes, exactly. That's what I was confused about. If NVC didn't need it, then why is it on their website as one of the required documents? In either case, they have the PCC. If they don't need it, will they send it over to the consulate after a case complete? I also looked at the other forum for India and a lot of people said it's specific by US Embassies and the one for Mumbai, India- wants it at the time of the interview. I am going to call NVC again tomorrow to see if I can get a hold of another person to make sure they are saying the same thing. But I had asked him 2-3 times and he said NVC does not need it and that his IV package is complete. So confusing :wacko:

  16. Ok so here's my case guys!

    My husband got his PCC in Mumbai, India and his whole IV package was done and he sent it. I called NVC yesterday and she told me that his package is complete and accepted. Today, however, I got an email from NVC and they sent me this:

    "______10 - PASSPORT POLICE CERTIFICATE:____________________________

    Indian Police Clearance Certificates should be obtained as follows:

    •All Indian IV applicants aged 16 and above, residing in India, should obtain police

    certificates from the local Passport Office.

    •Indian passport holders applying for visas outside India should obtain a statement from their

    local embassy or consulate confirming they have no criminal record.

    •Non-Indian IV applicants residing in India should obtain police certificates from the District

    Police Station serving their area of residence.

    •Indian police certificates are not available for foreign (non-Indian) applicants applying

    outside India."

    Curious as to what this meant, I just called NVC. And he told me that NVC doesn't need the Police Clearance Certificate (PCC) and that my husband would need to take the PCC with him at the time of his interview. I asked him again to make sure and that's what he said. I asked him if he would send the original back, and he said that the husband can just take a copy of the PCC with him to the interview. Is this correct? I don't know if his PCC had an expiration date on it. If so, he would need to get a new PCC before his interview? Also, he got his PCC made from the police office, not passport office. Which one is necessary? Again, he's in Mumbai. Any feedback would be appreciated.

  17. I just called NVC. And he told me that NVC doesn't need the Police Clearance Certificate (PCC) and that my husband would need to take the PCC with him at the time of his interview. I asked him again to make sure and that's what he said. I asked him if he would send the original back, and he said that the husband can just take a copy of the PCC with him to the interview. Is this correct? Any feedback would be appreciated.

  18. Checklists aren't false if they're asking for something specific. I suggest calling up NVC and inquiring about this.

    Thanks Saylin! I just called NVC. And he told me that NVC doesn't need the Police Clearance Certificate (PCC) and that my husband would need to take the PCC with him at the time of his interview. I asked him again to make sure and that's what he said. I asked him if he would send the original back, and he said that the husband can just take a copy of the PCC with him to the interview. Is this correct? Any feedback would be appreciated.

  19. I called NVC yesterday and they told me the IV package has been reviewed and is completed and accepted. However, I received an email today- a Checklist. This is what it reads:

    "______10 - PASSPORT POLICE CERTIFICATE:____________________________

    Indian Police Clearance Certificates should be obtained as follows:

    •All Indian IV applicants aged 16 and above, residing in India, should obtain police

    certificates from the local Passport Office.

    •Indian passport holders applying for visas outside India should obtain a statement from their

    local embassy or consulate confirming they have no criminal record.

    •Non-Indian IV applicants residing in India should obtain police certificates from the District

    Police Station serving their area of residence.

    •Indian police certificates are not available for foreign (non-Indian) applicants applying

    outside India."

    What does this mean?? This is for my husband in Mumbai, India who submitted the IV package.

    I got an email saying that they received the IV package and are waiting for my AOS (which I already mailed and they should get it by tomorrow).

    Please help! I thought the IV was accepted according to the the lady whom I spoke to yesterday. :bonk:

×
×
  • Create New...