https://www.energyvoice.com/otherenergy/187877/scottish-wind-power-smashes-100-production-threshold/

 

The National Grid energy requirement for November saw both on and offshore wind produce more than the required demand on 20 of 30 days.

Powering 109% of the total energy requirement, the new figures set a new record for wind generation in Scotland.

Gina Hanrahan, head of policy at WWF Scotland said: “Wind power breaking through the magic 100% threshold is truly momentous.

“For months output has flirted around the 97% mark, so it’s fantastic to reach this milestone. It’s also worth noting that 20 out of 30 days wind production outstripped demand.

“Most of this is onshore wind, which we know is popular, cheap and effective. But the UK Government needs to allow it to compete with other technologies, by unlocking market access for onshore wind if it’s to realise its full potential.”


.

I cannot calculate the curve and complete the figure by the experience of sight; I can divine it by conscience. But from what I see I am sure it bends towards justice -Theodore Parker

Link to comment
Share on other sites

Filed: H-1B Visa Country: Ireland
Timeline

I am a huge fan a renewable energy.


.

I cannot calculate the curve and complete the figure by the experience of sight; I can divine it by conscience. But from what I see I am sure it bends towards justice -Theodore Parker

Link to comment
Share on other sites

Filed: H-1B Visa Country: Ireland
Timeline
25 minutes ago, bcking said:

That's pretty cool actually. Good for Scotland.

Image result for scottish janitor simpsons


.

I cannot calculate the curve and complete the figure by the experience of sight; I can divine it by conscience. But from what I see I am sure it bends towards justice -Theodore Parker

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ecuador
Timeline

It's so flat and windy in parts of west Texas that the town chicken can end up laying the same egg 4 times.

06-04-2007 = TSC stamps postal return-receipt for I-129f.

06-11-2007 = NOA1 date (unknown to me).

07-20-2007 = Phoned Immigration Officer; got WAC#; where's NOA1?

09-25-2007 = Touch (first-ever).

09-28-2007 = NOA1, 23 days after their 45-day promise to send it (grrrr).

10-20 & 11-14-2007 = Phoned ImmOffs; "still pending."

12-11-2007 = 180 days; file is "between workstations, may be early Jan."; touches 12/11 & 12/12.

12-18-2007 = Call; file is with Division 9 ofcr. (bckgrnd check); e-prompt to shake it; touch.

12-19-2007 = NOA2 by e-mail & web, dated 12-18-07 (187 days; 201 per VJ); in mail 12/24/07.

01-09-2008 = File from USCIS to NVC, 1-4-08; NVC creates file, 1/15/08; to consulate 1/16/08.

01-23-2008 = Consulate gets file; outdated Packet 4 mailed to fiancee 1/27/08; rec'd 3/3/08.

04-29-2008 = Fiancee's 4-min. consular interview, 8:30 a.m.; much evidence brought but not allowed to be presented (consul: "More proof! Second interview! Bring your fiance!").

05-05-2008 = Infuriating $12 call to non-English-speaking consulate appointment-setter.

05-06-2008 = Better $12 call to English-speaker; "joint" interview date 6/30/08 (my selection).

06-30-2008 = Stokes Interrogations w/Ecuadorian (not USC); "wait 2 weeks; we'll mail her."

07-2008 = Daily calls to DOS: "currently processing"; 8/05 = Phoned consulate, got Section Chief; wrote him.

08-07-08 = E-mail from consulate, promising to issue visa "as soon as we get her passport" (on 8/12, per DHL).

08-27-08 = Phoned consulate (they "couldn't find" our file); visa DHL'd 8/28; in hand 9/1; through POE on 10/9 with NO hassles(!).

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Russia
Timeline

I agree, I am all for renewable energy with hydro being my first choice, but I am curious, how many wind generators were required to reach that goal?

Visa Received : 2014-04-04 (K1 - see timeline for details)

US Entry : 2014-09-12

POE: Detroit

Marriage : 2014-09-27

I-765 Approved: 2015-01-09

I-485 Interview: 2015-03-11

I-485 Approved: 2015-03-13

Green Card Received: 2015-03-24 Yeah!!!

I-751 ROC Submitted: 2016-12-20

I-751 NOA Received:  2016-12-29

I-751 Biometrics Appt.:  2017-01-26

I-751 Interview:  2018-04-10

I-751 Approved:  2018-05-04

N400 Filed:  2018-01-13

N400 Biometrics:  2018-02-22

N400 Interview:  2018-04-10

N400 Approved:  2018-04-10

Oath Ceremony:  2018-06-11 - DONE!!!!!!!

Link to comment
Share on other sites

Filed: Timeline

While at the outset, this seems like a great accomplishment,  we need to ask:

 

1) How much did it cost to build the turbines?

2) What is the lifespan of a turbine?

3) What are the associated maintenance costs?

 

My experience with them is that they are VERY expensive to erect and maintain, so much so that when they break, they are usually just abandoned.  Hawaii is a great example as to how well they (don't) work.  But at least they went from killing birds and bats to becoming safe roosts.

Link to comment
Share on other sites

14 minutes ago, Satisfied said:

While at the outset, this seems like a great accomplishment,  we need to ask:

 

1) How much did it cost to build the turbines?

2) What is the lifespan of a turbine?

3) What are the associated maintenance costs?

 

My experience with them is that they are VERY expensive to erect and maintain, so much so that when they break, they are usually just abandoned.  Hawaii is a great example as to how well they (don't) work.  But at least they went from killing birds and bats to becoming safe roosts.

I remember a story a while back. They wanted to put a wind farm near the Kennedy compound hyannis port. The valiant knights of all things liberal went to court and sued to block it. Becuse it would mess up their view. Maybe not the exact details,  but I a. Limited to a phone right now 

Link to comment
Share on other sites

Filed: H-1B Visa Country: Ireland
Timeline
48 minutes ago, The Nature Boy said:

I remember a story a while back. They wanted to put a wind farm near the Kennedy compound hyannis port. The valiant knights of all things liberal went to court and sued to block it. Becuse it would mess up their view. Maybe not the exact details,  but I a. Limited to a phone right now 

I knew I was burying the lead.

1 hour ago, Bill & Katya said:

I agree, I am all for renewable energy with hydro being my first choice, but I am curious, how many wind generators were required to reach that goal?

3 megawatts per Enercon ep2 which costs around 5 million USD.

Edited by refugee


.

I cannot calculate the curve and complete the figure by the experience of sight; I can divine it by conscience. But from what I see I am sure it bends towards justice -Theodore Parker

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Russia
Timeline
52 minutes ago, Satisfied said:

While at the outset, this seems like a great accomplishment,  we need to ask:

 

1) How much did it cost to build the turbines?

2) What is the lifespan of a turbine?

3) What are the associated maintenance costs?

 

My experience with them is that they are VERY expensive to erect and maintain, so much so that when they break, they are usually just abandoned.  Hawaii is a great example as to how well they (don't) work.  But at least they went from killing birds and bats to becoming safe roosts.

Maybe they can just throw them in a lake.

 

Btw, there are about 5,600 turbines in 460 wind farms on shore in Scotland right now with something like 9.5 GW of installed capacity (I think the units of the number used in the OP linked story is wrong, I believe it should be MW-h instead of MW).

 

https://www.telegraph.co.uk/news/2017/12/20/scotland-facing-new-wave-larger-wind-farms-taller-turbines-snp/

Visa Received : 2014-04-04 (K1 - see timeline for details)

US Entry : 2014-09-12

POE: Detroit

Marriage : 2014-09-27

I-765 Approved: 2015-01-09

I-485 Interview: 2015-03-11

I-485 Approved: 2015-03-13

Green Card Received: 2015-03-24 Yeah!!!

I-751 ROC Submitted: 2016-12-20

I-751 NOA Received:  2016-12-29

I-751 Biometrics Appt.:  2017-01-26

I-751 Interview:  2018-04-10

I-751 Approved:  2018-05-04

N400 Filed:  2018-01-13

N400 Biometrics:  2018-02-22

N400 Interview:  2018-04-10

N400 Approved:  2018-04-10

Oath Ceremony:  2018-06-11 - DONE!!!!!!!

Link to comment
Share on other sites

Filed: H-1B Visa Country: Ireland
Timeline
3 minutes ago, refugee said:

I knew I was burying the lead.

3 megawatts per Enercon ep2 which costs around 5 million USD.

 

8 minutes ago, Bill & Katya said:

Maybe they can just throw them in a lake.

 

Btw, there are about 5,600 turbines in 460 wind farms on shore in Scotland right now with something like 9.5 GW of installed capacity (I think the units of the number used in the OP linked story is wrong, I believe it should be MW-h instead of MW).

 

https://www.telegraph.co.uk/news/2017/12/20/scotland-facing-new-wave-larger-wind-farms-taller-turbines-snp/

This article is old / 2017


.

I cannot calculate the curve and complete the figure by the experience of sight; I can divine it by conscience. But from what I see I am sure it bends towards justice -Theodore Parker

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Russia
Timeline
16 minutes ago, refugee said:

 

This article is old / 2017

Slightly, but I don't think the capacity has increased that much more in a little over a year.  Regardless, renewables are a good thing, and apparently Scotland is a place with a lot of wind energy.  Like I said, my preference is hydro, but that is not doable everywhere either.  All forms of energy have their pros and cons, so a good mix is probably the best path.

Edited by Bill & Katya

Visa Received : 2014-04-04 (K1 - see timeline for details)

US Entry : 2014-09-12

POE: Detroit

Marriage : 2014-09-27

I-765 Approved: 2015-01-09

I-485 Interview: 2015-03-11

I-485 Approved: 2015-03-13

Green Card Received: 2015-03-24 Yeah!!!

I-751 ROC Submitted: 2016-12-20

I-751 NOA Received:  2016-12-29

I-751 Biometrics Appt.:  2017-01-26

I-751 Interview:  2018-04-10

I-751 Approved:  2018-05-04

N400 Filed:  2018-01-13

N400 Biometrics:  2018-02-22

N400 Interview:  2018-04-10

N400 Approved:  2018-04-10

Oath Ceremony:  2018-06-11 - DONE!!!!!!!

Link to comment
Share on other sites

something like this in the US would be great if there are sufficiently available air flows in the Mid-West .. .there are miles and miles of nothing, surrounded by farmland no fear of offending anybodies aesthetics, centrally located for distribution ... 

Edited by Randyandyuni

 

 

Link to comment
Share on other sites

Filed: H-1B Visa Country: Ireland
Timeline
42 minutes ago, Bill & Katya said:

Slightly, but I don't think the capacity has increased that much more in a little over a year.  Regardless, renewables are a good thing, and apparently Scotland is a place with a lot of wind energy.  Like I said, my preference is hydro, but that is not doable everywhere either.  All forms of energy have their pros and cons, so a good mix is probably the best path.

Capacity has doubled in a year


.

I cannot calculate the curve and complete the figure by the experience of sight; I can divine it by conscience. But from what I see I am sure it bends towards justice -Theodore Parker

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Russia
Timeline
1 minute ago, refugee said:

Capacity has doubled in a year

So the capacity now is over 18 GW?  Please provide the reference for that as everything I have found is a bit dated.

Visa Received : 2014-04-04 (K1 - see timeline for details)

US Entry : 2014-09-12

POE: Detroit

Marriage : 2014-09-27

I-765 Approved: 2015-01-09

I-485 Interview: 2015-03-11

I-485 Approved: 2015-03-13

Green Card Received: 2015-03-24 Yeah!!!

I-751 ROC Submitted: 2016-12-20

I-751 NOA Received:  2016-12-29

I-751 Biometrics Appt.:  2017-01-26

I-751 Interview:  2018-04-10

I-751 Approved:  2018-05-04

N400 Filed:  2018-01-13

N400 Biometrics:  2018-02-22

N400 Interview:  2018-04-10

N400 Approved:  2018-04-10

Oath Ceremony:  2018-06-11 - DONE!!!!!!!

Link to comment
Share on other sites

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...