Hi Guys,

So me and my fiance filed the K1 petition in the new year, thinking we were allowing plenty of time for out wedding in October. Now it seems like the TSC is working on a huge backlog and is still processing the cases from September. We're both panicking that the visa isn't going to be issued in time for our wedding, should we be worried or can I still expect to get the NOA2 in time?

Link to comment
Share on other sites

From what I've seen on here, you're definitely going to be lucky to make October. But who knows...with the TSC transfers and supposed effort to clear the backlog, maybe they'll push through and get to your petition!

Hopefully you followed the advice of the petition and the VJ community and didn't book anything non-refundable for the wedding...

K1 Visa Process AOS Process

Mar 18 2013: I-129F mailed to CSC Nov 15 2013: I-485 with EAD/AP filed at Chicago Lockbox

Sept 19 2013: Interview - Approved!! Jan 25 2014: EAD/AP Card Received

Oct 6 2013: POE - Chicago O'Hare June 2 2014: Permanent Resident Card Received!

Oct 27 2013: Wedding!

Link to comment
Share on other sites

No one can give you an answer to that as we cannot predict processing times of the future. TSC has continuously slowed down since I started keeping track in November last year. Just today they posted the official processing time to be Aug 23rd 2014 - which looses them another 2 weeks at least. Current estimates are 220d until NOA-2 - that would late Aug/early Sept in your case. Then you need another 2-3 months till visa in hand.

I cross my fingers for you, but taking current processing times as a guide you will not make it if there are any delays ( RFE) in your case.

Edited by TabeaK

K1 time line

 


I-129F sent: 12/23/2014
NOA-1: 12/29/2014
NOA-2: 06/05/2015 (158 days)
NOA-2 hardcopy: 06/11/2015 (6 days post NOA-2, 164 days total)
Sent to NVC: 06/16/2015 (11 days post NOA-2, 169 days total)
NVC receive: 06/25/2015 (20 days post NOA-2, 178 days total)
NVC case no: 06/30/2015 (25 days post NOA-2, 183 days total)
NVC left: 07/02/2015 (27 days post NOA-2, 185 days total)
Case Ready: 07/07/2015 (32 days post NOA-2, 190 days total)
submitted DS-160, paid visa fee.: 07/21/2015 (46 days post NOA-2, 204 days total)
Packet 3 sent: 07/25/2015 (50 days post NOA-2, 209 days total)
Pack 4 received: 07/30/2015 (55 days post NOA-2, 214 days total)
Medical: 09/17/2015 Interview: 09/23/2015 (108 days post NOA-2, 268 days total)
Interview Result: Approved Administrative Processing: 09/23/2015
CEAC Status Issued: 09/24/2015
Visa in hand: 09/28/2015
POE: 12/29/2015 Wedding: 01/11/2016


AOS Time Line

 

AOS package mailed: 01/13/2016
AOS package received: 01/20/2016 (day 1)
AOS NOA-1 text/email: 01/23/2016 (day 3), actual NOA-1 date 01/22/2016 (day 2)
AOS Fingerprint fee received: 01/22/2016 (day 2)
AOS check cashed: 01-25-2016 (day 5) Got 6 month NJ driver's license: 01-25-2016
3x NOA-1 hardcopies: 02/03/2016 (day 14)

Biometrics letter: 02/05/2016 (day 16) Biometrics appt (Elizabeth, NJ): 02/17/2016 (day 28)

EAD and AP approved email/txt: 03/29/2016 (day 67)

GC approval email/text: 04/04/2016 (day 74)

I-797 for I-765/I-131 in mail: 04/04/2016 (day 74)

EAD/AP delivered: 04/05/216 (day 75)

GC card being mailed status update: 04/07/16 (day 77)

GC received: 04/11/16 (day 84 post AOS NOA-1)

DONE WITH USCIS FOR 21 MONTHS!

ROC Window opens: 01/04/2018

 

ROC Time Line
ROC package mailed to Vermont 01/04/2018
ROC package received at Vermont 01/08/2018 (day 0)
Check cashed: 01/16/2018 (day 8 )
NOA-1 date: 01/09/2018 (day 1)
NOA-1 received: 01/16/2018 (day 8 )
Biometrics notice received: 02/09/2018 (day 32)
Biometrics appointment: 02/23/2018 (day 46)
Received 18-month extension letter: 08/13/2018 (day 209)
ROC Approved: 03/09/2019 (day 425)
Card Received: 03/16/2019  (day 432)
Link to comment
Share on other sites

Worse comes to worse and don't get approved in time, what then? Can we still marry and apply for a CR1? Can I stay in the states while I do this or will I have to go back to the UK?

Link to comment
Share on other sites

No, you cannot stay in the US during the CR-1 process. You have to wait it out back home and it takes 1-2 years.

Do you have any chance of moving the wedding?

Edited by TabeaK

K1 time line

 


I-129F sent: 12/23/2014
NOA-1: 12/29/2014
NOA-2: 06/05/2015 (158 days)
NOA-2 hardcopy: 06/11/2015 (6 days post NOA-2, 164 days total)
Sent to NVC: 06/16/2015 (11 days post NOA-2, 169 days total)
NVC receive: 06/25/2015 (20 days post NOA-2, 178 days total)
NVC case no: 06/30/2015 (25 days post NOA-2, 183 days total)
NVC left: 07/02/2015 (27 days post NOA-2, 185 days total)
Case Ready: 07/07/2015 (32 days post NOA-2, 190 days total)
submitted DS-160, paid visa fee.: 07/21/2015 (46 days post NOA-2, 204 days total)
Packet 3 sent: 07/25/2015 (50 days post NOA-2, 209 days total)
Pack 4 received: 07/30/2015 (55 days post NOA-2, 214 days total)
Medical: 09/17/2015 Interview: 09/23/2015 (108 days post NOA-2, 268 days total)
Interview Result: Approved Administrative Processing: 09/23/2015
CEAC Status Issued: 09/24/2015
Visa in hand: 09/28/2015
POE: 12/29/2015 Wedding: 01/11/2016


AOS Time Line

 

AOS package mailed: 01/13/2016
AOS package received: 01/20/2016 (day 1)
AOS NOA-1 text/email: 01/23/2016 (day 3), actual NOA-1 date 01/22/2016 (day 2)
AOS Fingerprint fee received: 01/22/2016 (day 2)
AOS check cashed: 01-25-2016 (day 5) Got 6 month NJ driver's license: 01-25-2016
3x NOA-1 hardcopies: 02/03/2016 (day 14)

Biometrics letter: 02/05/2016 (day 16) Biometrics appt (Elizabeth, NJ): 02/17/2016 (day 28)

EAD and AP approved email/txt: 03/29/2016 (day 67)

GC approval email/text: 04/04/2016 (day 74)

I-797 for I-765/I-131 in mail: 04/04/2016 (day 74)

EAD/AP delivered: 04/05/216 (day 75)

GC card being mailed status update: 04/07/16 (day 77)

GC received: 04/11/16 (day 84 post AOS NOA-1)

DONE WITH USCIS FOR 21 MONTHS!

ROC Window opens: 01/04/2018

 

ROC Time Line
ROC package mailed to Vermont 01/04/2018
ROC package received at Vermont 01/08/2018 (day 0)
Check cashed: 01/16/2018 (day 8 )
NOA-1 date: 01/09/2018 (day 1)
NOA-1 received: 01/16/2018 (day 8 )
Biometrics notice received: 02/09/2018 (day 32)
Biometrics appointment: 02/23/2018 (day 46)
Received 18-month extension letter: 08/13/2018 (day 209)
ROC Approved: 03/09/2019 (day 425)
Card Received: 03/16/2019  (day 432)
Link to comment
Share on other sites

No, you cannot stay in the US during the CR-1 process. You have to wait it out back home and it takes 1-2 years.

Do you have any chance of moving the wedding?

I tend to be in this camp. If she comes with the intent to marry and stay, that's immigration fraud. What would she tell the border officer? There are lots of threads about this on VJ, though, so look for those. Lots of people marry and stay in the US to adjust status. However, if she enters on VWP and your petition is denied (which is unlikely to be honest), you would have no avenue for appeal.

If you choose to get married, you'll start over. You'll lose all the fees you've paid and have to cancel that petition and start new with a CR-1.

K1 Visa Process AOS Process

Mar 18 2013: I-129F mailed to CSC Nov 15 2013: I-485 with EAD/AP filed at Chicago Lockbox

Sept 19 2013: Interview - Approved!! Jan 25 2014: EAD/AP Card Received

Oct 6 2013: POE - Chicago O'Hare June 2 2014: Permanent Resident Card Received!

Oct 27 2013: Wedding!

Link to comment
Share on other sites

Thing is, with a pending I-129f they have established intent. I am not commenting on AOS from VWP as that would never be legal at this point.

K1 time line

 


I-129F sent: 12/23/2014
NOA-1: 12/29/2014
NOA-2: 06/05/2015 (158 days)
NOA-2 hardcopy: 06/11/2015 (6 days post NOA-2, 164 days total)
Sent to NVC: 06/16/2015 (11 days post NOA-2, 169 days total)
NVC receive: 06/25/2015 (20 days post NOA-2, 178 days total)
NVC case no: 06/30/2015 (25 days post NOA-2, 183 days total)
NVC left: 07/02/2015 (27 days post NOA-2, 185 days total)
Case Ready: 07/07/2015 (32 days post NOA-2, 190 days total)
submitted DS-160, paid visa fee.: 07/21/2015 (46 days post NOA-2, 204 days total)
Packet 3 sent: 07/25/2015 (50 days post NOA-2, 209 days total)
Pack 4 received: 07/30/2015 (55 days post NOA-2, 214 days total)
Medical: 09/17/2015 Interview: 09/23/2015 (108 days post NOA-2, 268 days total)
Interview Result: Approved Administrative Processing: 09/23/2015
CEAC Status Issued: 09/24/2015
Visa in hand: 09/28/2015
POE: 12/29/2015 Wedding: 01/11/2016


AOS Time Line

 

AOS package mailed: 01/13/2016
AOS package received: 01/20/2016 (day 1)
AOS NOA-1 text/email: 01/23/2016 (day 3), actual NOA-1 date 01/22/2016 (day 2)
AOS Fingerprint fee received: 01/22/2016 (day 2)
AOS check cashed: 01-25-2016 (day 5) Got 6 month NJ driver's license: 01-25-2016
3x NOA-1 hardcopies: 02/03/2016 (day 14)

Biometrics letter: 02/05/2016 (day 16) Biometrics appt (Elizabeth, NJ): 02/17/2016 (day 28)

EAD and AP approved email/txt: 03/29/2016 (day 67)

GC approval email/text: 04/04/2016 (day 74)

I-797 for I-765/I-131 in mail: 04/04/2016 (day 74)

EAD/AP delivered: 04/05/216 (day 75)

GC card being mailed status update: 04/07/16 (day 77)

GC received: 04/11/16 (day 84 post AOS NOA-1)

DONE WITH USCIS FOR 21 MONTHS!

ROC Window opens: 01/04/2018

 

ROC Time Line
ROC package mailed to Vermont 01/04/2018
ROC package received at Vermont 01/08/2018 (day 0)
Check cashed: 01/16/2018 (day 8 )
NOA-1 date: 01/09/2018 (day 1)
NOA-1 received: 01/16/2018 (day 8 )
Biometrics notice received: 02/09/2018 (day 32)
Biometrics appointment: 02/23/2018 (day 46)
Received 18-month extension letter: 08/13/2018 (day 209)
ROC Approved: 03/09/2019 (day 425)
Card Received: 03/16/2019  (day 432)
Link to comment
Share on other sites

Hi Guys,

So me and my fiance filed the K1 petition in the new year, thinking we were allowing plenty of time for out wedding in October. Now it seems like the TSC is working on a huge backlog and is still processing the cases from September. We're both panicking that the visa isn't going to be issued in time for our wedding, should we be worried or can I still expect to get the NOA2 in time?

Applicants are specifically advised to not make any hard wedding plans.

It is highly unlikely that you will make the date you have planned for. I am an October filer, and don't expect to even see my wedding until the time you have planned. TSC is that slow. While there is no guarantee, TSC won't speed up, now that new applications are being routed elsewhere, I still would stay on the cautious side. There is no guarantee they won't progress at the same speed or even slower.

Our Journey Timeline  - Immigration and the Health Exchange Price of Love in the UK Thinking of Returning to UK?

 

First met: 12/31/04 - Engaged: 9/24/09
Filed I-129F: 10/4/14 - Packet received: 10/7/14
NOA 1 email + ARN assigned: 10/10/14 (hard copy 10/17/14)
Touched on website (fixed?): 12/9/14 - Poked USCIS: 4/1/15
NOA 2 email: 5/4/15 (hard copy 5/11/15)
Sent to NVC: 5/8/15 - NVC received + #'s assigned: 5/15/15 (estimated)
NVC sent: 5/19/15 - London received/ready: 5/26/15
Packet 3: 5/28/15 - Medical: 6/16/15
Poked London 7/1/15 - Packet 4: 7/2/15
Interview: 7/30/15 - Approved!
AP + Issued 8/3/15 - Visa in hand (depot): 8/6/15
POE: 8/27/15

Wedding: 9/30/15

Filed I-485, I-131, I-765: 11/7/15

Packet received: 11/9/15

NOA 1 txt/email: 11/15/15 - NOA 1 hardcopy: 11/19/15

Bio: 12/9/15

EAD + AP approved: 1/25/16 - EAD received: 2/1/16

RFE for USCIS inability to read vax instructions: 5/21/16 (no e-notification & not sent from local office!)

RFE response sent: 6/7/16 - RFE response received 6/9/16

AOS approved/card in production: 6/13/16  

NOA 2 hardcopy + card sent 6/17/16

Green Card received: 6/18/16

USCIS 120 day reminder notice: 2/22/18

Filed I-751: 5/2/18 - Packet received: 5/4/18

NOA 1:  5/29/18 (12 mo ext) 8/13/18 (18 mo ext)  - Bio: 6/27/18

Transferred: Potomac Service Center 3/26/19

Approved/New Card Produced status: 4/25/19 - NOA2 hardcopy 4/29/19

10yr Green Card Received: 5/2/19 with error >_<

N400 : 7/16/23 - Oath : 10/19/23

 

 

 

Link to comment
Share on other sites

So what's stopping us from having a "ceremony" (i.e a religious blessing but not legally married), me returning to the UK afterwards, waiting for the K1 to be approved, and then come over and get legally married? Unconventional I know but we're not technically breaking the law doing this, right?

Edited by Mdevine92
Link to comment
Share on other sites

Thing is, with a pending I-129f they have established intent. I am not commenting on AOS from VWP as that would never be legal at this point.

I very much agree with you. I've had a number of VJ users disagree this point, though. I always encourage erring on the side of better safe than sorry!

K1 Visa Process AOS Process

Mar 18 2013: I-129F mailed to CSC Nov 15 2013: I-485 with EAD/AP filed at Chicago Lockbox

Sept 19 2013: Interview - Approved!! Jan 25 2014: EAD/AP Card Received

Oct 6 2013: POE - Chicago O'Hare June 2 2014: Permanent Resident Card Received!

Oct 27 2013: Wedding!

Link to comment
Share on other sites

No you wouldn't. But make damn sure no one ever gets the idea you are actually married- USCIS and embassy staff have denied petitions from people they considered married even though the applicants claimed it was not legally binding.

K1 time line

 


I-129F sent: 12/23/2014
NOA-1: 12/29/2014
NOA-2: 06/05/2015 (158 days)
NOA-2 hardcopy: 06/11/2015 (6 days post NOA-2, 164 days total)
Sent to NVC: 06/16/2015 (11 days post NOA-2, 169 days total)
NVC receive: 06/25/2015 (20 days post NOA-2, 178 days total)
NVC case no: 06/30/2015 (25 days post NOA-2, 183 days total)
NVC left: 07/02/2015 (27 days post NOA-2, 185 days total)
Case Ready: 07/07/2015 (32 days post NOA-2, 190 days total)
submitted DS-160, paid visa fee.: 07/21/2015 (46 days post NOA-2, 204 days total)
Packet 3 sent: 07/25/2015 (50 days post NOA-2, 209 days total)
Pack 4 received: 07/30/2015 (55 days post NOA-2, 214 days total)
Medical: 09/17/2015 Interview: 09/23/2015 (108 days post NOA-2, 268 days total)
Interview Result: Approved Administrative Processing: 09/23/2015
CEAC Status Issued: 09/24/2015
Visa in hand: 09/28/2015
POE: 12/29/2015 Wedding: 01/11/2016


AOS Time Line

 

AOS package mailed: 01/13/2016
AOS package received: 01/20/2016 (day 1)
AOS NOA-1 text/email: 01/23/2016 (day 3), actual NOA-1 date 01/22/2016 (day 2)
AOS Fingerprint fee received: 01/22/2016 (day 2)
AOS check cashed: 01-25-2016 (day 5) Got 6 month NJ driver's license: 01-25-2016
3x NOA-1 hardcopies: 02/03/2016 (day 14)

Biometrics letter: 02/05/2016 (day 16) Biometrics appt (Elizabeth, NJ): 02/17/2016 (day 28)

EAD and AP approved email/txt: 03/29/2016 (day 67)

GC approval email/text: 04/04/2016 (day 74)

I-797 for I-765/I-131 in mail: 04/04/2016 (day 74)

EAD/AP delivered: 04/05/216 (day 75)

GC card being mailed status update: 04/07/16 (day 77)

GC received: 04/11/16 (day 84 post AOS NOA-1)

DONE WITH USCIS FOR 21 MONTHS!

ROC Window opens: 01/04/2018

 

ROC Time Line
ROC package mailed to Vermont 01/04/2018
ROC package received at Vermont 01/08/2018 (day 0)
Check cashed: 01/16/2018 (day 8 )
NOA-1 date: 01/09/2018 (day 1)
NOA-1 received: 01/16/2018 (day 8 )
Biometrics notice received: 02/09/2018 (day 32)
Biometrics appointment: 02/23/2018 (day 46)
Received 18-month extension letter: 08/13/2018 (day 209)
ROC Approved: 03/09/2019 (day 425)
Card Received: 03/16/2019  (day 432)
Link to comment
Share on other sites

So what's stopping us from having a "ceremony" (i.e a religious blessing but not legally married), me returning to the UK afterwards, waiting for the K1 to be approved, and then come over and get legally married? Unconventional I know but we're not technically breaking the law doing this, right?

Not technically, no. If USCIS thinks you're married (even if they are told it was just a ceremony), they can deny the K-1. There are some cultures where a religious ceremony before the actual marriage is the norm. The UK is not one of them, though.

You can do an advanced search on VJ for K-1 visas who had a ceremony. I'm not honestly sure if anyone has actually done it and been denied (but I think I've seen some that were). To USCIS, if it looks like a wedding, it was a wedding, and you're no longer eligible for a K-1.

You can have a party with no ministers, altar, or wedding garb to celebrate your love and probably stay out of hot water.

K1 Visa Process AOS Process

Mar 18 2013: I-129F mailed to CSC Nov 15 2013: I-485 with EAD/AP filed at Chicago Lockbox

Sept 19 2013: Interview - Approved!! Jan 25 2014: EAD/AP Card Received

Oct 6 2013: POE - Chicago O'Hare June 2 2014: Permanent Resident Card Received!

Oct 27 2013: Wedding!

Link to comment
Share on other sites

OP: bottom line, I would never advocate doing what you're suggesting. If you come into the US with the intent to do something and do not disclose it to the IO, there's a problem. Even if it's not ''real'' and binding in the legal sense, I could see it becoming a problem quickly. It's unfortunate that you are stuck at TSC, but there is not much you can do at this point.

Our Journey Timeline  - Immigration and the Health Exchange Price of Love in the UK Thinking of Returning to UK?

 

First met: 12/31/04 - Engaged: 9/24/09
Filed I-129F: 10/4/14 - Packet received: 10/7/14
NOA 1 email + ARN assigned: 10/10/14 (hard copy 10/17/14)
Touched on website (fixed?): 12/9/14 - Poked USCIS: 4/1/15
NOA 2 email: 5/4/15 (hard copy 5/11/15)
Sent to NVC: 5/8/15 - NVC received + #'s assigned: 5/15/15 (estimated)
NVC sent: 5/19/15 - London received/ready: 5/26/15
Packet 3: 5/28/15 - Medical: 6/16/15
Poked London 7/1/15 - Packet 4: 7/2/15
Interview: 7/30/15 - Approved!
AP + Issued 8/3/15 - Visa in hand (depot): 8/6/15
POE: 8/27/15

Wedding: 9/30/15

Filed I-485, I-131, I-765: 11/7/15

Packet received: 11/9/15

NOA 1 txt/email: 11/15/15 - NOA 1 hardcopy: 11/19/15

Bio: 12/9/15

EAD + AP approved: 1/25/16 - EAD received: 2/1/16

RFE for USCIS inability to read vax instructions: 5/21/16 (no e-notification & not sent from local office!)

RFE response sent: 6/7/16 - RFE response received 6/9/16

AOS approved/card in production: 6/13/16  

NOA 2 hardcopy + card sent 6/17/16

Green Card received: 6/18/16

USCIS 120 day reminder notice: 2/22/18

Filed I-751: 5/2/18 - Packet received: 5/4/18

NOA 1:  5/29/18 (12 mo ext) 8/13/18 (18 mo ext)  - Bio: 6/27/18

Transferred: Potomac Service Center 3/26/19

Approved/New Card Produced status: 4/25/19 - NOA2 hardcopy 4/29/19

10yr Green Card Received: 5/2/19 with error >_<

N400 : 7/16/23 - Oath : 10/19/23

 

 

 

Link to comment
Share on other sites

From what I've seen on here, you're definitely going to be lucky to make October. But who knows...with the TSC transfers and supposed effort to clear the backlog, maybe they'll push through and get to your petition!

Hopefully you followed the advice of the petition and the VJ community and didn't book anything non-refundable for the wedding...

The problem is that with the recent "transfer"....it's not actually a transfer. It's how they're trying to prevent the backlog from getting worse and/or evening out the processing times between the centers. They're not picking up anyone's file out of the line an sending it to CSC--they're just routing all new petitions to CSC (regardless of where the petitioner lives). It would appear as if the plan is for the Lockbox to route incoming petitions to whichever service center has the shortest "line" from now on. But do nothing for those *already* in the line.

Marriage/ AOS Timeline:

23 Dec 2015: Legal marriage

23 Jan 2016: Wedding!

23 Jan 2016: "Blizzard of the Century", wedding canceled/rescheduled (thank goodness we were legally married first or we'd have had a big problem!) :sleepy:

24 Jan 2016: Small "civil ceremony" with friends and family who were snowed in with us. December was a bit of a secret and people had traveled internationally and knew we *had* to get married that weekend, and our December legal marriage was nothing but signing a piece of paper at our priest's kitchen table, without any sort of vows etc so this was actually a very special (if not legally significant) day. (L)

16 Apr 2016: Filed for AOS and EAD/AP (We delayed a bit-- no big rush, enjoying the USCIS break)

23 Apr 2016: Wedding! Finally! :luv:

27 Apr 2016: Electronic NOA1 for all 3 :dancing:
29 Apr 2016: NOA1 Hardcopy for all 3
29 Jul 2016: Online service request for late EAD (Day 104)
29 Jul 2016: EAD/AP Approved ~3 hours after online service request
04 Aug 2016: RFE for Green Card (requested medicals/ vaccination record. They already have it). :ranting:
05 Aug 2016: EAD/AP Combo Card arrived! (Day 111)
08 Aug 2016: Congressional constituent request to get guidance on the RFE. Hoping they see they have the form and approve!

K-1 Visa Timeline:

PLEASE NOTE. This timeline was during the period of time when TSC was working on I-129fs and had a huge backlog. The average processing time was 210+ days. This is in no way predictive of your own timeline if you filed during or after April 2015, unless CSC develops a backlog. A backlog is anything above the 5-month goal time listed on USCIS's site

14 Feb 2015: Mailed I-129f to Dallas Lockbox. (L) (Most expensive Valentine's card I've ever sent!)

17 Feb 2015: NOA1 "Received Date"
19 Feb 2015: NOA1 Notice Date
08 Aug 2015: NOA2 email! :luv: (173 days from NOA1)

17 Aug 2015: Sent to NVC

?? Aug 2015: Arrived at NVC

25 Aug 2015: NVC Case # Assigned

31 Aug 2015: Left NVC for Consulate in San Jose

09 Sep 2015: Consulate received :dancing: (32 days from NOA2)

11 Sep 2015: Packet 3 emailed from embassy to me, the petitioner (34 days from NOA2).

18 Sep 2015: Medicals complete

21 Sep 2015: Packet 3 complete, my boss puts a temporary moratorium on all time off due to work emergency :clock:

02 Oct 2015: Work emergency clears up, interview scheduled (soonest available was 5 business days away--Columbus Day was in there)

13 Oct 2015: Interview

13 Oct 2015: VISA APPROVED :thumbs: (236 days from NOA1)

19 Oct 2015: Visa-in-hand

24 Oct 2015: POE !

15 Dec 2015: Fiance's mother's B-2 visa interview: APPROVED! So happy she will be at the wedding! :thumbs:

!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...