Can't wait to get to that point!

F2A JOURNEY STATUS

COMPLETE

USCIS

Vermont Service Center

01/17/14 : NOA1 (Priority Date)

03/24/15 : NOA-T (Electronic Transfer notice to California Service Center)

03/28/15 : NOA-T (Hard Copy of Transfer notice received in mail)

03/30/15 : NOA2 ( I-130 Approved) Electronic confirmation

04/03/15 : NOA2 Hard Copy received in mail

NVC

http://www.visajourn...php/NVC_Process

04/16/15 : NVC Received Case (Phone call with CSR confirmed)

04/24/15 : Case number and IIN assigned (Phone Call)

04/27/15 : NVC Welcome Letter received via Email

04/27/15 : DS-261 Waived and AOS & IV bill invoiced

04/28/15 : AOS & IV bill paid (Status: IN PROCESS)

04/29/15 : AOS & IV bill paid (Status: PAID)

04/29/15 : DS-260 Available online

04/30/15 : DS-260 Completed

05/08/15 : AOS and IV Package mailed to NVC

05/26/15 : NVC Scan Date (CSR confirmed)

06/17/15 : Case Complete

07/29/15 : Interview Date Received Sep 2nd! (CSR confirmed) :dancing:

07/30/15 : Interview Letter email received (P4)

07/31/15 : NVC shipped out case to London Embassy

Embassy

07/30/15 : Medical Completed

08/01/15 : CEAC status "In Transit"

08/03/15 : Package received at London Embassy

08/05/15 : CEAC status "Ready"

09/02/15 : Interview

09/02/15 : Interview Result: APPROVED!!

09/03/15 : CEAC status changed to "Administrative Processing"

09/04/15 : CEAC status changed to "Issued " :dancing:

09/10/15 : Visa in hand!!

09/11/15 : POE

Link to comment
Share on other sites

I don't go by Visa calculator but logically if u see ur PD would be current in either August or max September.....And case complete is done when all ur docs are complete with NVC....Now ur Interview is also dependent upon ur Embassy's Backload ....how many applicants they will interview in a particular month depending on all categories....

Now u can also go thru the below NVC link to contact then directly:

http://travel.state.gov/content/visas/english/contact/ask-nvc.html

U can do this after may be 3 weeks from now and i think u should get a response from NVC within 2 weeks after that...I would rather prefer to do that after 2 weeks from now...i.e by April 15/2015 we can email to get the case number

But still i will call them early in morning at 7:00 which is good time to call....after 2 weeks are over

I already have all my docs ready and just waiting for NVC to start the process....U too collect all the docs...Better to be prepared early rather than doing stuff at last time...

If u have any querries do ask .....Good Luck

Thank you Dew_Drops for the detailed info and I greatly appriciate it. Our case is handled by a lawyer therefore, I have sent her all the documents from my end and my husband did the same from his side. I have also done the police certificate last year october which expires the coming october. I hope I do not have to do it again and we get our Interview appointment before October 2015.

Good luck to you and the rest of us in this forum for the NVC stage and I hope it will go smooth not like Uscis who gave us a grief to get an approval. May God guide us thorugh all the way. I hope to see more family members joining this room so that we stick by each other until the end.

Edited by Habel

F-2A Visa Journey

Service Center : Vermont Service Center

Consulate : London, United Kingdom

Marriage (if applicable): 2012/12/27 (Happy day :) )

I-130 Sent : 2013-11-06

I-130 NOA1 : 2013-11-22

I-130 Approved : 2015-04-01 :) (Happy day after waiting for long time)

NVC Received : 2015-04-16 :) (Another joyful day)

Case Number and IIN Received date : 2015-04- 27 (Glory to the lord :) ):

AOS Scan Date: 2015-05-11 (I have been advised to wait 30 days from the date of scan to get case closed)

Case Completed at NVC : 2015-06-04 (Praise the lord almighty :)

Medical Booked: 2015-07-08- Completed

Interview Date: 2015-08-19 (Praise the lord almighty) :)

Interview Result : Visa approved :) Thanks lord

US Entry :

Link to comment
Share on other sites

Filed: F-2A Visa Country: Nepal
Timeline

count me too Habel And Dew drops... jst a queries what documents is requried at NVC stage can you brief me pls... thanks

Marriage: 10/10/2013.

I-130 Sent: 11/22/2013

I-130 NOA 1: 25/11/2013

NOA-T (Electronic Transfer notice to California Service Center): 24/03/2015

NOA-T (Hard Copy of Transfer notice received in mail): 31/03/2015

I-130 NOA2: 01.04.2015 (Approved)

NVC Received: 16 April 2015

Received DS-261 / AOS Bill: 27 April 2015

Pay AOS Bill: 30 April 2015

Send AOS / IV Package: 13 May 2015

Pay IV Bill: 08 May 2015

Scan Date: 18 May 2015

Checklist: 19 June 2015 [ Non-submission of DS260]

Submitted DS260: 08 July 2015

Case Completed at NVC: 08 Sep 2015

Interview Date: 05 Nov 2015

Interview Result: passed :dancing: :dancing:

Link to comment
Share on other sites

Filed: Country: Sweden
Timeline

a question people. I am in USA now on a tourist visa and my petition got approved today. can I not leave USA and stay here and file I-485 for adjustant of status ? since I am here legally right?

1/10/2013 : We sent I130 application to chicago

3/10/2013 : Application received - Priority date

8/10/2013 : NOA1 hard copy received

26/3/2015: Case Transfered to California

2/4/2015 : I-130 Approval

5/4/2015 : NOA2 Hard Copy received

23/4/2015 : NVC recieved the case

1/5/2015 : Case number and IIN assigned (Phone Call)

11/5/2015 : DS-261 Available and completed

27/5/2015 : Both fees were paid via post

28/5/2015 : AOS and IV package mailed to NVC

6/6/2015 : Scan date - Document received by NVC

5/7/2015 : DS-260 Available and completed

6/7/2015 : Checklist ( marriage certificate from another authority- i864 ( missing tax for 2014)

16/7/2015 : our new Scan date

12/10/2015 : 2nd checklist: NVC lost the resident permit document and ask it again.

20/10/2015 : new scan date

24/11/2015: case complete

CONSULATE

24/1/2016 : Medical
2/2/2016 : Interview
3/3/2016 : Visa in hand
15/4/2016 : POE

Link to comment
Share on other sites

a question people. I am in USA now on a tourist visa and my petition got approved today. can I not leave USA and stay here and file I-485 for adjustant of status ? since I am here legally right?

hello Mahdieh - congratulations on your approval!

you can only file I-485 to adjust in the US if your PD is current. I think your PD is Oct 2013? if you are still here and your visa is still valid when your PD comes up, then you can adjust....My husband is also here on a tourist visa but he will have to go back soon. He has been with me for almost 6 months now! we were so wishing that he would have been able to adjust in the US.

Best of luck to you!

Priority Date - December 2, 2013

USCIS -

12/02/13 : NOA1 (Priority Date)

03/24/15 : Case Transferred from VSC to CSC

03/28/15 : Hard copy of transfer received in mail

04/14/15 : NOA2 ( I-130 Approved) - finally! (informed via text on 4/16/2015)

NVC -

04/29/15 : NVC received the case (informed during phone call to NVC on 5/01/2015

05/08/15 : Case number assigned and IIN (received via phone call on 5/14/2015)

05/12/15 : NVC Welcome letter mailed

05/19/15 : NVC Welcome received in mail

05/29/15 : DS-261 Finally Available on CEAC and completed

05/29/15 : AOS bill Available on CEAC and paid (status: IN PROCESS)

06/02/15 : AOS bill status: PAID

06/15/15 : IV invoice generated (notified by email) but unable to pay on CEAC...waiting...

07/05/15 : IV bill Finally Available on CEAC and paid (status: IN PROCESS)

07/08/15 : IV bill status: PAID

07/08/15 : DS-260 Available

07/12/15 : DS-260 completed and submitted

07/13/15 : AOS and IV package mailed to NVC

07/14/15 : AOS and IV package received by NVC

07/16/15 : Scan Date

07/28/15 : CASE COMPLETE - NO checklist! :dancing::dancing::dancing:London...here we come...!!

08/04/15 : CC Email received...waiting for Interview Letter....

08/11/15 : Interview letter (IL/P4) received ...interview date 9/11/2015! :dancing: :dancing::dancing:

EMBASSY -

08/11/15 : Case Shipped to embassy

08/12/15 : Case Arrived in UK (tracked on DHL website)

08/12/15 : Medical completed

08/14/15 : CEAC showing IN TRANSIT

08/18/15 : CEAC showing READY

09/11/15 : Interview date (initial)

09/08/15 : Interview date (rescheduled on 8/18/2015) - APPROVED :)

xx/xx/15 : Visa in hand
xx/xx/15 : POE....Dulles airport!

Link to comment
Share on other sites

@ munafn - I know you are looking forward to the NVC stage! can't wait to be there with you guys!!!

anyway I was reading your comments and I don't know if things work differently as you have an attorney handling your case, but you can call NVC directly and get your IIN. You will get it sooner than waiting for them to give it to you.....that will help you speed up your case. Again, I don't know if things are different when you have an attorney.....

Priority Date - December 2, 2013

USCIS -

12/02/13 : NOA1 (Priority Date)

03/24/15 : Case Transferred from VSC to CSC

03/28/15 : Hard copy of transfer received in mail

04/14/15 : NOA2 ( I-130 Approved) - finally! (informed via text on 4/16/2015)

NVC -

04/29/15 : NVC received the case (informed during phone call to NVC on 5/01/2015

05/08/15 : Case number assigned and IIN (received via phone call on 5/14/2015)

05/12/15 : NVC Welcome letter mailed

05/19/15 : NVC Welcome received in mail

05/29/15 : DS-261 Finally Available on CEAC and completed

05/29/15 : AOS bill Available on CEAC and paid (status: IN PROCESS)

06/02/15 : AOS bill status: PAID

06/15/15 : IV invoice generated (notified by email) but unable to pay on CEAC...waiting...

07/05/15 : IV bill Finally Available on CEAC and paid (status: IN PROCESS)

07/08/15 : IV bill status: PAID

07/08/15 : DS-260 Available

07/12/15 : DS-260 completed and submitted

07/13/15 : AOS and IV package mailed to NVC

07/14/15 : AOS and IV package received by NVC

07/16/15 : Scan Date

07/28/15 : CASE COMPLETE - NO checklist! :dancing::dancing::dancing:London...here we come...!!

08/04/15 : CC Email received...waiting for Interview Letter....

08/11/15 : Interview letter (IL/P4) received ...interview date 9/11/2015! :dancing: :dancing::dancing:

EMBASSY -

08/11/15 : Case Shipped to embassy

08/12/15 : Case Arrived in UK (tracked on DHL website)

08/12/15 : Medical completed

08/14/15 : CEAC showing IN TRANSIT

08/18/15 : CEAC showing READY

09/11/15 : Interview date (initial)

09/08/15 : Interview date (rescheduled on 8/18/2015) - APPROVED :)

xx/xx/15 : Visa in hand
xx/xx/15 : POE....Dulles airport!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Morocco
Timeline

hello everyone.

well now im moving to nvc after got approved from uscis. what document do i need to submit to nvc as far as AOS and IV package. please help


hello everyone.

well now im moving to nvc after got approved from uscis. what document do i need to submit to nvc as far as AOS and IV package. please help

Link to comment
Share on other sites

@ munafn - I know you are looking forward to the NVC stage! can't wait to be there with you guys!!!

anyway I was reading your comments and I don't know if things work differently as you have an attorney handling your case, but you can call NVC directly and get your IIN. You will get it sooner than waiting for them to give it to you.....that will help you speed up your case. Again, I don't know if things are different when you have an attorney.....

Hi SbaI2000,

To be honest with you, I do not think things are different with a lawyer as our one is really usless. If you look at page 1, I have posted a question and answer comment from what I have asked her yeasterday and her response is always short and not clear therefore, the best thing to do is follow the VJ forum and get things speed up. I think one postive aspect of having a lawyer is that you do not have to worry about the checklist of documents because they ask you to provide what you need and they will do the rest but I think that is just something you can do by yourself using the VJ wiki information. I hope you get your approval at least by Friday and join the rest of us here for the next step. Best of luck with your approval.

Edited by Habel

F-2A Visa Journey

Service Center : Vermont Service Center

Consulate : London, United Kingdom

Marriage (if applicable): 2012/12/27 (Happy day :) )

I-130 Sent : 2013-11-06

I-130 NOA1 : 2013-11-22

I-130 Approved : 2015-04-01 :) (Happy day after waiting for long time)

NVC Received : 2015-04-16 :) (Another joyful day)

Case Number and IIN Received date : 2015-04- 27 (Glory to the lord :) ):

AOS Scan Date: 2015-05-11 (I have been advised to wait 30 days from the date of scan to get case closed)

Case Completed at NVC : 2015-06-04 (Praise the lord almighty :)

Medical Booked: 2015-07-08- Completed

Interview Date: 2015-08-19 (Praise the lord almighty) :)

Interview Result : Visa approved :) Thanks lord

US Entry :

Link to comment
Share on other sites

hello everyone.

well now im moving to nvc after got approved from uscis. what document do i need to submit to nvc as far as AOS and IV package. please help

hello everyone.

well now im moving to nvc after got approved from uscis. what document do i need to submit to nvc as far as AOS and IV package. please help

Hi Ahmedtazzi,

Congrats on your approval. Please see attached checklist for the NVC stage.

NVC Checklist for Consular Processing - Family.pdf

F-2A Visa Journey

Service Center : Vermont Service Center

Consulate : London, United Kingdom

Marriage (if applicable): 2012/12/27 (Happy day :) )

I-130 Sent : 2013-11-06

I-130 NOA1 : 2013-11-22

I-130 Approved : 2015-04-01 :) (Happy day after waiting for long time)

NVC Received : 2015-04-16 :) (Another joyful day)

Case Number and IIN Received date : 2015-04- 27 (Glory to the lord :) ):

AOS Scan Date: 2015-05-11 (I have been advised to wait 30 days from the date of scan to get case closed)

Case Completed at NVC : 2015-06-04 (Praise the lord almighty :)

Medical Booked: 2015-07-08- Completed

Interview Date: 2015-08-19 (Praise the lord almighty) :)

Interview Result : Visa approved :) Thanks lord

US Entry :

Link to comment
Share on other sites

count me too Habel And Dew drops... jst a queries what documents is requried at NVC stage can you brief me pls... thanks

Welcome SusDan7 and follow the topic so that you get an email update staight away with new informations. Best of luck to all of us.

F-2A Visa Journey

Service Center : Vermont Service Center

Consulate : London, United Kingdom

Marriage (if applicable): 2012/12/27 (Happy day :) )

I-130 Sent : 2013-11-06

I-130 NOA1 : 2013-11-22

I-130 Approved : 2015-04-01 :) (Happy day after waiting for long time)

NVC Received : 2015-04-16 :) (Another joyful day)

Case Number and IIN Received date : 2015-04- 27 (Glory to the lord :) ):

AOS Scan Date: 2015-05-11 (I have been advised to wait 30 days from the date of scan to get case closed)

Case Completed at NVC : 2015-06-04 (Praise the lord almighty :)

Medical Booked: 2015-07-08- Completed

Interview Date: 2015-08-19 (Praise the lord almighty) :)

Interview Result : Visa approved :) Thanks lord

US Entry :

Link to comment
Share on other sites

count me too Habel And Dew drops... jst a queries what documents is requried at NVC stage can you brief me pls... thanks

I have attached a checklist from our lawyer however, just use it to prepare documents as the fee is not the same as the one stated in the document. For more info use the Wiki link I have provdied on page one as it gives you detailed information.

NVC Checklist for Consular Processing - Family.pdf

F-2A Visa Journey

Service Center : Vermont Service Center

Consulate : London, United Kingdom

Marriage (if applicable): 2012/12/27 (Happy day :) )

I-130 Sent : 2013-11-06

I-130 NOA1 : 2013-11-22

I-130 Approved : 2015-04-01 :) (Happy day after waiting for long time)

NVC Received : 2015-04-16 :) (Another joyful day)

Case Number and IIN Received date : 2015-04- 27 (Glory to the lord :) ):

AOS Scan Date: 2015-05-11 (I have been advised to wait 30 days from the date of scan to get case closed)

Case Completed at NVC : 2015-06-04 (Praise the lord almighty :)

Medical Booked: 2015-07-08- Completed

Interview Date: 2015-08-19 (Praise the lord almighty) :)

Interview Result : Visa approved :) Thanks lord

US Entry :

Link to comment
Share on other sites

I have attached a checklist from our lawyer however, just use it to prepare documents as the fee is not the same as the one stated in the document. For more info use the Wiki link I have provdied on page one as it gives you detailed information.

Welcome to this room and good luck to you with NVC.

F-2A Visa Journey

Service Center : Vermont Service Center

Consulate : London, United Kingdom

Marriage (if applicable): 2012/12/27 (Happy day :) )

I-130 Sent : 2013-11-06

I-130 NOA1 : 2013-11-22

I-130 Approved : 2015-04-01 :) (Happy day after waiting for long time)

NVC Received : 2015-04-16 :) (Another joyful day)

Case Number and IIN Received date : 2015-04- 27 (Glory to the lord :) ):

AOS Scan Date: 2015-05-11 (I have been advised to wait 30 days from the date of scan to get case closed)

Case Completed at NVC : 2015-06-04 (Praise the lord almighty :)

Medical Booked: 2015-07-08- Completed

Interview Date: 2015-08-19 (Praise the lord almighty) :)

Interview Result : Visa approved :) Thanks lord

US Entry :

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Morocco
Timeline

Thanks to everyone here on vj.

So far that's what I have for

AOS package .

Form i-864EZ ONLY me and my wife

Copy of W-2 and 1040 form for 2014

Copy of my naturalization

Copies of last 4 month pay stub

Employment letter of me

Bar-coded cover sheet.

And for IV package.

Bar-coded cover sheet of payment

2 passport style photographs

Copy of my wife passport

Copy of marriage certificate and translate

My wife Birth certificate and translate

My wife Original police certificate and translate

My wife court certificate and translate

Please if I am missing anything help me and let me know so I can get the rest of doc. Before submitting to nvc

Link to comment
Share on other sites

count me too Habel And Dew drops... jst a queries what documents is requried at NVC stage can you brief me pls... thanks

SusDan - here is my list that I've been working with:

1. NVC welcome letter

Bar coded cover sheet

Tax transcript 2011,2012,2013

Tax return 2014

W2 2014

letter of employment

copy of marriage license

copy of permanent card (greencard)

 

2. IV documents:

Bar coded cover sheet

copy of birth certificate (beneficiary)

copy of marriage license

copy of police clearance

copy of biographic passport page

Photographs 2 pcs

some other VJer have also added some additional evidence of their marriage being a bona fide one. This is called side-loading....so if you are from a high-risk country you may wish to do that. You can also re-send the original evidence docs that you sent to USCIS (which is what we are going to do).

Priority Date - December 2, 2013

USCIS -

12/02/13 : NOA1 (Priority Date)

03/24/15 : Case Transferred from VSC to CSC

03/28/15 : Hard copy of transfer received in mail

04/14/15 : NOA2 ( I-130 Approved) - finally! (informed via text on 4/16/2015)

NVC -

04/29/15 : NVC received the case (informed during phone call to NVC on 5/01/2015

05/08/15 : Case number assigned and IIN (received via phone call on 5/14/2015)

05/12/15 : NVC Welcome letter mailed

05/19/15 : NVC Welcome received in mail

05/29/15 : DS-261 Finally Available on CEAC and completed

05/29/15 : AOS bill Available on CEAC and paid (status: IN PROCESS)

06/02/15 : AOS bill status: PAID

06/15/15 : IV invoice generated (notified by email) but unable to pay on CEAC...waiting...

07/05/15 : IV bill Finally Available on CEAC and paid (status: IN PROCESS)

07/08/15 : IV bill status: PAID

07/08/15 : DS-260 Available

07/12/15 : DS-260 completed and submitted

07/13/15 : AOS and IV package mailed to NVC

07/14/15 : AOS and IV package received by NVC

07/16/15 : Scan Date

07/28/15 : CASE COMPLETE - NO checklist! :dancing::dancing::dancing:London...here we come...!!

08/04/15 : CC Email received...waiting for Interview Letter....

08/11/15 : Interview letter (IL/P4) received ...interview date 9/11/2015! :dancing: :dancing::dancing:

EMBASSY -

08/11/15 : Case Shipped to embassy

08/12/15 : Case Arrived in UK (tracked on DHL website)

08/12/15 : Medical completed

08/14/15 : CEAC showing IN TRANSIT

08/18/15 : CEAC showing READY

09/11/15 : Interview date (initial)

09/08/15 : Interview date (rescheduled on 8/18/2015) - APPROVED :)

xx/xx/15 : Visa in hand
xx/xx/15 : POE....Dulles airport!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...