I was wondering how long does it usually take to get a visa fiancée done, from start to the date they get the visa, an estimate would do it.

And I was wondering how much the total cost is?

Also, has anyone hire a lawyer for this process or they do them on their own, does anyone know how much a lawyer would charge for the entire process, an estimate would do as well.

Thank you.

Ps" please don't say "go ask a lawyer" because if I wanted to I wouldn't asked it here.

10/31/2012 - I-129F Sent
11/05/2012 - NOA1 (email/text)
11/08/2012 - NOA1 (paper)
05/10/2013 - NOA2 (paper) for some reason, they didn't text me this time.
05/17/2013 - NVC received package.
05/24/2013 - NVC Sent package to Ecuador embassy (I called and they told me that)
05/28/2013 - Received mail from NVC notifying they have send my package to Ecuador.
05/31/2013 - Ecuador Consulate mail package to my fiancée.(I've already scheduled the interview before this)
07/15/2013 - Visa approved!
11/30/2013 - POE (smooth process, she was done in 1 hr)
12/21/2013 - We got married!
12/24/2013 - Applied for SSN
*************AOS***********
03/27/2014 - Sent out AOS, EAD, and AP
04/03/2014 - Received NOA for all 3
04/08/2014 - Received appointment for Biometrics
04/30/2014 - Received RFE (need proof of income)
05/06/2014 - Did Biometrics appointment
05/07/2014 - Sent RFE
06/14/2014 - Received EAD/AP combo card
07/10/2014 - Notice of Potential Interview Waiver Case

02/23/2015 - Opened a Case Inquiry "Outside Normal Processing Time"

03/09/2015 - USCIS responded with a letter, and pretty much said "keep waiting, we'll get to you"

03/24/2015 - "Card was ordered to be produced"

04/03/2015 - Greencard in hand!

*************Lifting Condition***********
12/16/2016 - Date Filed

12/22/2016 - NOA

02/06/2017 - Biometric appointment

12/13/2017 - Received "Notice of Removal of Conditional Basis of Lawful Permanent Residence" APPROVED!

Link to comment
Share on other sites

Filed: AOS (apr) Country: Philippines
Timeline

You can do it without a lawyer. Many of us on this website have done it. We read material here and post questions and others are very helpful.

For my, I applied February 1 for fiancee visa and my fiancee got her visa approval on September 7. So it was just over 7 months.

Sent I-129 Application to VSC 2/1/12
NOA1 2/8/12
RFE 8/2/12
RFE reply 8/3/12
NOA2 8/16/12
NVC received 8/27/12
NVC left 8/29/12
Manila Embassy received 9/5/12
Visa appointment & approval 9/7/12
Arrived in US 10/5/2012
Married 11/24/2012
AOS application sent 12/19/12

AOS approved 8/24/13

Link to comment
Share on other sites

I was wondering how long does it usually take to get a visa fiancée done, from start to the date they get the visa, an estimate would do it.

And I was wondering how much the total cost is?

Also, has anyone hire a lawyer for this process or they do them on their own, does anyone know how much a lawyer would charge for the entire process, an estimate would do as well.

Thank you.

Ps" please don't say "go ask a lawyer" because if I wanted to I wouldn't asked it here.

Just like smiley stated, you don't need a lawyer AT ALL :no:

Read the link below...

http://www.visajourney.com/content/compare

Good luck to you :thumbs:

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Venezuela
Timeline

In my case took me 6 month and 15 days since the moment we filled until I had my visa in hand. Took me 4 month to get the noa2 or aproval. Compare to cr1 (petition for a foreign spouse) up o 8 to 12 month. My processing time is the average, but depends on every case and if you got an RFE or not. But usually takes 5 to 11 month (rare cases). When I started my journey a year ago( exactly today), we talk to a lawyer and only the k1 proces was near 2,500dls (last year) and for the AoS another 3000. We decide to followed the guides ad we had and amazing journey without rfe or dlays. Now im waiting for my EAD nd my greencard interview. So far so good. No lawyers

Edited by Andrea&Henry

OUR AMAZING JOURNEY 

 

2011

UiSpm4.pngHWwxm4.png

 

2012

YIRsm4.png   Mi1Gm4.pngTh37m4.png    

 

2013                                                  2014                                                     2015

fNidm5.png NXDpm4.png    VaECm4.png 

 

2016

VRj7m4.png4IFnm4.png

 

                                                                                                                                                                                                                                   

                  

 

Link to comment
Share on other sites

Filed: Country: Ecuador
Timeline

Okay then, I need your guys help, I met my now girlfriend on February 18, 2012.

Can I still apply for fiancée visa? Or do I need to know her for 2 years? I don't want to wait 2 years.

Also, I'm planning on going to Ecuador this February 2013, if I am not elegibable to get te fiancée visa because I don't know my gf long enought, I am planning on marrying her then. What do you guys suggest.

10/31/2012 - I-129F Sent
11/05/2012 - NOA1 (email/text)
11/08/2012 - NOA1 (paper)
05/10/2013 - NOA2 (paper) for some reason, they didn't text me this time.
05/17/2013 - NVC received package.
05/24/2013 - NVC Sent package to Ecuador embassy (I called and they told me that)
05/28/2013 - Received mail from NVC notifying they have send my package to Ecuador.
05/31/2013 - Ecuador Consulate mail package to my fiancée.(I've already scheduled the interview before this)
07/15/2013 - Visa approved!
11/30/2013 - POE (smooth process, she was done in 1 hr)
12/21/2013 - We got married!
12/24/2013 - Applied for SSN
*************AOS***********
03/27/2014 - Sent out AOS, EAD, and AP
04/03/2014 - Received NOA for all 3
04/08/2014 - Received appointment for Biometrics
04/30/2014 - Received RFE (need proof of income)
05/06/2014 - Did Biometrics appointment
05/07/2014 - Sent RFE
06/14/2014 - Received EAD/AP combo card
07/10/2014 - Notice of Potential Interview Waiver Case

02/23/2015 - Opened a Case Inquiry "Outside Normal Processing Time"

03/09/2015 - USCIS responded with a letter, and pretty much said "keep waiting, we'll get to you"

03/24/2015 - "Card was ordered to be produced"

04/03/2015 - Greencard in hand!

*************Lifting Condition***********
12/16/2016 - Date Filed

12/22/2016 - NOA

02/06/2017 - Biometric appointment

12/13/2017 - Received "Notice of Removal of Conditional Basis of Lawful Permanent Residence" APPROVED!

Link to comment
Share on other sites

Filed: Country: Ecuador
Timeline

One more thing, my gf and i are not oficial y engagged (party, ring, etc) but we are planning on doing so. Can I still file for I-129 form today?

I mean we have been talking everyday day since February and her family is aware of my intentions.

Do I need to get engaged first before I send out this form?

One more question, what do u guys recommend, fiancé or spouse visa, I mean, there is no rush for her to be here, she is in school and she'll be done in October.

I just don't know what to do, whih one is easier and more convenience.

10/31/2012 - I-129F Sent
11/05/2012 - NOA1 (email/text)
11/08/2012 - NOA1 (paper)
05/10/2013 - NOA2 (paper) for some reason, they didn't text me this time.
05/17/2013 - NVC received package.
05/24/2013 - NVC Sent package to Ecuador embassy (I called and they told me that)
05/28/2013 - Received mail from NVC notifying they have send my package to Ecuador.
05/31/2013 - Ecuador Consulate mail package to my fiancée.(I've already scheduled the interview before this)
07/15/2013 - Visa approved!
11/30/2013 - POE (smooth process, she was done in 1 hr)
12/21/2013 - We got married!
12/24/2013 - Applied for SSN
*************AOS***********
03/27/2014 - Sent out AOS, EAD, and AP
04/03/2014 - Received NOA for all 3
04/08/2014 - Received appointment for Biometrics
04/30/2014 - Received RFE (need proof of income)
05/06/2014 - Did Biometrics appointment
05/07/2014 - Sent RFE
06/14/2014 - Received EAD/AP combo card
07/10/2014 - Notice of Potential Interview Waiver Case

02/23/2015 - Opened a Case Inquiry "Outside Normal Processing Time"

03/09/2015 - USCIS responded with a letter, and pretty much said "keep waiting, we'll get to you"

03/24/2015 - "Card was ordered to be produced"

04/03/2015 - Greencard in hand!

*************Lifting Condition***********
12/16/2016 - Date Filed

12/22/2016 - NOA

02/06/2017 - Biometric appointment

12/13/2017 - Received "Notice of Removal of Conditional Basis of Lawful Permanent Residence" APPROVED!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline

I would do the spouse visa over the fiancee visa. The fiancee visa has the second adjustment of status step and the delay in work authorization. In some instances, being married shows a stronger commitment/relationship. Again, in some instances.

Ecuador is not known as an easy place to secure a visa. So plan on being fully engaged in the process. There are some VJ members who can give you lots of input based on their experiences there.

Comments such as "don't say go ask a lawyer" are not a good start. You need to be fully informed of all your options. Advice here on VJ is a good source. Knowing all that you can is even better. If you're not willing to make a few phone calls or do some googling you may end up frustrated and disappointed.

How many times have you met face to face? How long were those visits?

I-864 Affidavit of Support FAQ -->> https://travel.state.gov/content/visas/en/immigrate/immigrant-process/documents/support/i-864-frequently-asked-questions.html

FOREIGN INCOME REPORTING & TAX FILING -->> https://www.irs.gov/publications/p54/ch01.html#en_US_2015_publink100047318

CALL THIS NUMBER TO ORDER IRS TAX TRANSCRIPTS >> 800-908-9946

PLEASE READ THE GUIDES -->> Link to Visa Journey Guides

MULTI ENTRY SPOUSE VISA TO VN -->>Link to Visa Exemption for Vietnamese Residents Overseas & Their Spouses

Link to comment
Share on other sites

Filed: Country: Ecuador
Timeline

I have Been there twice, once in February 2012 for 10 days and second on August 2012 for 20 days.

I have done some research since yesterday, I know the k-1 is easier to get her here but the paperwork afterward is extensive, right now she doesn't need to work, I can afford to support her so job permission is not an issue.

I just wanna be with her here and be happy with her.

Then I heard spouse visa takes too long but she will get a green card right away and not too much paperwork involved once she is here. If I go for the spouse visa, I am planning on marrying her this February when I am going there again, and no we haven't been engaged, we are just planning a civil wedding and party afterward.

What do u guys think, I love this girl and she loves me, she is not coming here for paperwork, she is coming here to spend her life with me, but I wanna do things right and know what is the quickest and safest way for us to be together.

10/31/2012 - I-129F Sent
11/05/2012 - NOA1 (email/text)
11/08/2012 - NOA1 (paper)
05/10/2013 - NOA2 (paper) for some reason, they didn't text me this time.
05/17/2013 - NVC received package.
05/24/2013 - NVC Sent package to Ecuador embassy (I called and they told me that)
05/28/2013 - Received mail from NVC notifying they have send my package to Ecuador.
05/31/2013 - Ecuador Consulate mail package to my fiancée.(I've already scheduled the interview before this)
07/15/2013 - Visa approved!
11/30/2013 - POE (smooth process, she was done in 1 hr)
12/21/2013 - We got married!
12/24/2013 - Applied for SSN
*************AOS***********
03/27/2014 - Sent out AOS, EAD, and AP
04/03/2014 - Received NOA for all 3
04/08/2014 - Received appointment for Biometrics
04/30/2014 - Received RFE (need proof of income)
05/06/2014 - Did Biometrics appointment
05/07/2014 - Sent RFE
06/14/2014 - Received EAD/AP combo card
07/10/2014 - Notice of Potential Interview Waiver Case

02/23/2015 - Opened a Case Inquiry "Outside Normal Processing Time"

03/09/2015 - USCIS responded with a letter, and pretty much said "keep waiting, we'll get to you"

03/24/2015 - "Card was ordered to be produced"

04/03/2015 - Greencard in hand!

*************Lifting Condition***********
12/16/2016 - Date Filed

12/22/2016 - NOA

02/06/2017 - Biometric appointment

12/13/2017 - Received "Notice of Removal of Conditional Basis of Lawful Permanent Residence" APPROVED!

Link to comment
Share on other sites

Filed: Country: Ecuador
Timeline

Also, we have talked every single day since the first time we met, and her whole family knows me and we have plenty of pic of us having fun together.

10/31/2012 - I-129F Sent
11/05/2012 - NOA1 (email/text)
11/08/2012 - NOA1 (paper)
05/10/2013 - NOA2 (paper) for some reason, they didn't text me this time.
05/17/2013 - NVC received package.
05/24/2013 - NVC Sent package to Ecuador embassy (I called and they told me that)
05/28/2013 - Received mail from NVC notifying they have send my package to Ecuador.
05/31/2013 - Ecuador Consulate mail package to my fiancée.(I've already scheduled the interview before this)
07/15/2013 - Visa approved!
11/30/2013 - POE (smooth process, she was done in 1 hr)
12/21/2013 - We got married!
12/24/2013 - Applied for SSN
*************AOS***********
03/27/2014 - Sent out AOS, EAD, and AP
04/03/2014 - Received NOA for all 3
04/08/2014 - Received appointment for Biometrics
04/30/2014 - Received RFE (need proof of income)
05/06/2014 - Did Biometrics appointment
05/07/2014 - Sent RFE
06/14/2014 - Received EAD/AP combo card
07/10/2014 - Notice of Potential Interview Waiver Case

02/23/2015 - Opened a Case Inquiry "Outside Normal Processing Time"

03/09/2015 - USCIS responded with a letter, and pretty much said "keep waiting, we'll get to you"

03/24/2015 - "Card was ordered to be produced"

04/03/2015 - Greencard in hand!

*************Lifting Condition***********
12/16/2016 - Date Filed

12/22/2016 - NOA

02/06/2017 - Biometric appointment

12/13/2017 - Received "Notice of Removal of Conditional Basis of Lawful Permanent Residence" APPROVED!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Venezuela
Timeline

HI!!!! yiu can apply for fiance visa...here is my case:

MET MY NOW HUSBAND: JUNE 3RD, 2011

ASKED ME TO BE HIS GIRLFRIEND: JUNE 21, 2011

PROPOSED WITHOUT RING OR PARTY: AUGUST 1, 2011

VISIT ME FOR 2ND TIME: AUGUST 1- 12, 2011

SEND K1: SEPTEMBER 19, 2011

THIRD VISIT: SEPTEMBER 25, 2011

FOURTH VISIT: SPAIN , DECEMBER 22, 2011

ENGAGEMENT PARTY WITH RING, FAMILY: DECEMBER 25, 2011

CASE APROVED: JANUARY, 19 2012

INTERVIEW: APRIL 3, 2012 (HE CAME WITH ME)

ENTER US: APRIL 20, 2012

MARRIAGE: MAY 17, 2012

FILL FOR GREEN CARD: JULY 19, 2012

CURRENTLY WAITING FOR MY GC INTERVIEW.

IF you can see, you have more time with your girfriend now compare with the time i had with my husband when he sent our k1 petition... we only had 3 month together when he sent it. and we had our engagement party 4 month later.... when my husband and I got married we had 10 month together and now Im waiting for my green card...NO RFE NO ISSUES...and at the moment of the interview, having 10 month together wasn't an issue at all. so don be afraid and send the petition.

OUR AMAZING JOURNEY 

 

2011

UiSpm4.pngHWwxm4.png

 

2012

YIRsm4.png   Mi1Gm4.pngTh37m4.png    

 

2013                                                  2014                                                     2015

fNidm5.png NXDpm4.png    VaECm4.png 

 

2016

VRj7m4.png4IFnm4.png

 

                                                                                                                                                                                                                                   

                  

 

Link to comment
Share on other sites

Filed: Country: Ecuador
Timeline

Thank Andrea, that was very useful!

So, after reading that, this is my plan.

Send the application sometime this month, get engaged on February (which is next time ill be there) takes lots of pic, do an engagement party, rings, etc the whole nine yard.

At that time, I am binging my mom so she can get to meet her and at the same time she gets to visit Ecuador as well :)

And tht should be it right? Jut sent the I-129f form for k-1 petition and get engaged and just wait? I don't need any other form? Just send and wait to hear back?

10/31/2012 - I-129F Sent
11/05/2012 - NOA1 (email/text)
11/08/2012 - NOA1 (paper)
05/10/2013 - NOA2 (paper) for some reason, they didn't text me this time.
05/17/2013 - NVC received package.
05/24/2013 - NVC Sent package to Ecuador embassy (I called and they told me that)
05/28/2013 - Received mail from NVC notifying they have send my package to Ecuador.
05/31/2013 - Ecuador Consulate mail package to my fiancée.(I've already scheduled the interview before this)
07/15/2013 - Visa approved!
11/30/2013 - POE (smooth process, she was done in 1 hr)
12/21/2013 - We got married!
12/24/2013 - Applied for SSN
*************AOS***********
03/27/2014 - Sent out AOS, EAD, and AP
04/03/2014 - Received NOA for all 3
04/08/2014 - Received appointment for Biometrics
04/30/2014 - Received RFE (need proof of income)
05/06/2014 - Did Biometrics appointment
05/07/2014 - Sent RFE
06/14/2014 - Received EAD/AP combo card
07/10/2014 - Notice of Potential Interview Waiver Case

02/23/2015 - Opened a Case Inquiry "Outside Normal Processing Time"

03/09/2015 - USCIS responded with a letter, and pretty much said "keep waiting, we'll get to you"

03/24/2015 - "Card was ordered to be produced"

04/03/2015 - Greencard in hand!

*************Lifting Condition***********
12/16/2016 - Date Filed

12/22/2016 - NOA

02/06/2017 - Biometric appointment

12/13/2017 - Received "Notice of Removal of Conditional Basis of Lawful Permanent Residence" APPROVED!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Venezuela
Timeline

you can wait and married her, in that case you can file the CR1 (spouse of the US CITIZEN) but takes 8 to 12 month to have it complete compare to the 6 month of waiting for the k1 visa. The good thing about the cr1 is that if you do that, your spouse gets her GREENCARD a few weeks later After her arrival to the US. In the k1 visa, you HAVE TO GET MARRIED WITHIN 90 DAYS AFTER HER ARRIVAL, no 91, no 92! after you get married, you need to fill her AoS so she can get her greencard. In my case, when we got engaged we thought about getting married in my hometown with friends and family, but then when we found out that I couldn't just come to the Us with him, and instead of that, he need to file a petition for me and wait several month, the idea of being newlyweds and separate for 9 or 10 month just killed us. Then we found out about the k1 and we decide to keep that route. After submitting, I flew to Spain to spent some vacations with my family for 3 month and in the end of december he came to visit me and we threw a engagement party, with a great proposal, ring, pics with family etc etc.

The thing is that you can file for her cause the main request is that you have to meet each other IN PERSON WITHIN 2 years at least. and you met her ALMOST 7 MONTH AGO, so u have that request perfectly. The key of this journey is being well organized with everything and be patient. After we submiited the package, I started keeping all the recipes from hotel, boarding passes, passport stamps, restaurants, gifts, cards, letters, emails, a thousnd of pictures together not only with him but also with our family and friends in differents occasions and he did the same thing. At the moment of our interview we had a tons of evidence of bonafide relationship. You should start right now cause the k1 visa and the cr1 visa you need to send evidence of your relationship. With my package we sent: 14 pictures of us and with the family, 6 emails, 3 letters, 2 cards, boarding passes of the 2 first visits, airplane tickets, hotel receipts, money orders and western union receipts and most important: PHONE BILLS. you dont need to send a bunch of evidence, just 2 or 3 pages of each item...variety is more important than quantity.

Search for the guide of k1 visa and cr1 visa here in visajourney so you can compare and make the best decision for you guys :)

OUR AMAZING JOURNEY 

 

2011

UiSpm4.pngHWwxm4.png

 

2012

YIRsm4.png   Mi1Gm4.pngTh37m4.png    

 

2013                                                  2014                                                     2015

fNidm5.png NXDpm4.png    VaECm4.png 

 

2016

VRj7m4.png4IFnm4.png

 

                                                                                                                                                                                                                                   

                  

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Venezuela
Timeline

NOOO!! THE PACKAGE IS MORE THAN 1 FORM HERE IS THE GUIDE OF HOW TO PREPARE THE K1 PACKAGE http://www.visajourney.com/content/k1guide IF YOU NEED HELP TEXT ME

OUR AMAZING JOURNEY 

 

2011

UiSpm4.pngHWwxm4.png

 

2012

YIRsm4.png   Mi1Gm4.pngTh37m4.png    

 

2013                                                  2014                                                     2015

fNidm5.png NXDpm4.png    VaECm4.png 

 

2016

VRj7m4.png4IFnm4.png

 

                                                                                                                                                                                                                                   

                  

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline

From what other VJ members who have dealt with Guayaquil have said, you should plan on attending the interview, regardless of visa type.

I am sure that you will get those folks stopping by this thread later on today/tonight.

I-864 Affidavit of Support FAQ -->> https://travel.state.gov/content/visas/en/immigrate/immigrant-process/documents/support/i-864-frequently-asked-questions.html

FOREIGN INCOME REPORTING & TAX FILING -->> https://www.irs.gov/publications/p54/ch01.html#en_US_2015_publink100047318

CALL THIS NUMBER TO ORDER IRS TAX TRANSCRIPTS >> 800-908-9946

PLEASE READ THE GUIDES -->> Link to Visa Journey Guides

MULTI ENTRY SPOUSE VISA TO VN -->>Link to Visa Exemption for Vietnamese Residents Overseas & Their Spouses

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ecuador
Timeline
Ecuador is not known as an easy place to secure a visa. So plan on being fully engaged in the process. There are some VJ members who can give you lots of input based on their experiences there.

Comments such as "don't say go ask a lawyer" are not a good start. You need to be fully informed of all your options. Advice here on VJ is a good source. Knowing all that you can is even better. If you're not willing to make a few phone calls or do some googling you may end up frustrated and disappointed.

This is the only advice to listen to from any non-Ecuador member in this thread. In fact, the bolded statement above is an understatement.

Amigo, I'm going to send you a PM (personal message). Check the far upper right corner of your screen and read what I say, please.

06-04-2007 = TSC stamps postal return-receipt for I-129f.

06-11-2007 = NOA1 date (unknown to me).

07-20-2007 = Phoned Immigration Officer; got WAC#; where's NOA1?

09-25-2007 = Touch (first-ever).

09-28-2007 = NOA1, 23 days after their 45-day promise to send it (grrrr).

10-20 & 11-14-2007 = Phoned ImmOffs; "still pending."

12-11-2007 = 180 days; file is "between workstations, may be early Jan."; touches 12/11 & 12/12.

12-18-2007 = Call; file is with Division 9 ofcr. (bckgrnd check); e-prompt to shake it; touch.

12-19-2007 = NOA2 by e-mail & web, dated 12-18-07 (187 days; 201 per VJ); in mail 12/24/07.

01-09-2008 = File from USCIS to NVC, 1-4-08; NVC creates file, 1/15/08; to consulate 1/16/08.

01-23-2008 = Consulate gets file; outdated Packet 4 mailed to fiancee 1/27/08; rec'd 3/3/08.

04-29-2008 = Fiancee's 4-min. consular interview, 8:30 a.m.; much evidence brought but not allowed to be presented (consul: "More proof! Second interview! Bring your fiance!").

05-05-2008 = Infuriating $12 call to non-English-speaking consulate appointment-setter.

05-06-2008 = Better $12 call to English-speaker; "joint" interview date 6/30/08 (my selection).

06-30-2008 = Stokes Interrogations w/Ecuadorian (not USC); "wait 2 weeks; we'll mail her."

07-2008 = Daily calls to DOS: "currently processing"; 8/05 = Phoned consulate, got Section Chief; wrote him.

08-07-08 = E-mail from consulate, promising to issue visa "as soon as we get her passport" (on 8/12, per DHL).

08-27-08 = Phoned consulate (they "couldn't find" our file); visa DHL'd 8/28; in hand 9/1; through POE on 10/9 with NO hassles(!).

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...