Hi everyone,

Does anyone have any experience with a 221g? Can anyone tell me how long it takes for them to give you an answer after they receive your paperwork?

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

Moved from IR-1/CR-1 Process & Procedures to Waivers and Administrative Processes forum.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline

Hi everyone,

Does anyone have any experience with a 221g? Can anyone tell me how long it takes for them to give you an answer after they receive your paperwork?

Hi, me too I'm in AP with 221g..After sending missing documents I wrote an e mail to the Consulate (I'm in Italy) and they replied this process take from 1 to 4 months..Try to ask to your Consulate


2FMbp1.png

I-130 / F-2A ( Spouse of LPR ) varie_amore_10.gif

To see every step go to my Immigration Story..

02.13.2012 NOA 1 - PRIORITY DATE

11.20.2013 NOA 2 - APPROVAL DATE

03.07.2014 CASE COMPLETE

04.04.2014 INTERVIEW LETTER

05.20.2014 MEDICAL EXAMINATION

05.21.2014 INTERVIEW DATE

06.03.2014 AP...THE WAIT CAN BE FROM 1 TO 4 MONTHS...

08.08.2014 YET IN AP, STATUS UPDATE DATE CHANGE AT TODAY!! AUGUST 8 !! YUPPY!

08.11.2014 YET IN AP...AT TODAY HAVE PASSED 7 WEEKS (counting business days)

08.12.2014 OMG!! TODAY VISA STATUS SAY READY!!! I can't believe!!!

08.13.2014 VISA STATUS ISSUED!!!!!

08.24.25014 POE

lineacuori.gif

N-400 My hubby's Naturalization varie_amore_10.gif

PHOENIX LOCKBOX

07.14.2014 N-400 MAILED

07.17.2014 N-400 DELIVERED

07.24.2014 N-400 ACCEPTANCE CONFIRMATION LETTER

08.08.2014 FINGERPRINT LETTER

08.18.2014 FINGERPRINT APPOINTMENT DATE

28.09.2014 INTERVIEW LETTER

22.10.2014 INTERVIEW DATE

30.10.2014 OATH CERIMONY FINALLY US CITIZEN!!!!

11.07.2014 US Passport Received!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: France
Timeline

It takes that long? Now I have read what it said in these forums but I just find it a little hard to believe.... I asked the interviewer here in paris how long it takes them to process the paperwork once they receive it and she said 7-10 business days.... do you guys think that could be true or did she just tell me that to get rid of me lol....?

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline

It takes that long? Now I have read what it said in these forums but I just find it a little hard to believe.... I asked the interviewer here in paris how long it takes them to process the paperwork once they receive it and she said 7-10 business days.... do you guys think that could be true or did she just tell me that to get rid of me lol....?

Wow! just 10 business day! I think they don't have any reason to lie, they don't care how many time you need to wait, so if they tell to you this wait time will be so!! happy for you so lucky!

Can I ask to you what kind of documents you missing?


2FMbp1.png

I-130 / F-2A ( Spouse of LPR ) varie_amore_10.gif

To see every step go to my Immigration Story..

02.13.2012 NOA 1 - PRIORITY DATE

11.20.2013 NOA 2 - APPROVAL DATE

03.07.2014 CASE COMPLETE

04.04.2014 INTERVIEW LETTER

05.20.2014 MEDICAL EXAMINATION

05.21.2014 INTERVIEW DATE

06.03.2014 AP...THE WAIT CAN BE FROM 1 TO 4 MONTHS...

08.08.2014 YET IN AP, STATUS UPDATE DATE CHANGE AT TODAY!! AUGUST 8 !! YUPPY!

08.11.2014 YET IN AP...AT TODAY HAVE PASSED 7 WEEKS (counting business days)

08.12.2014 OMG!! TODAY VISA STATUS SAY READY!!! I can't believe!!!

08.13.2014 VISA STATUS ISSUED!!!!!

08.24.25014 POE

lineacuori.gif

N-400 My hubby's Naturalization varie_amore_10.gif

PHOENIX LOCKBOX

07.14.2014 N-400 MAILED

07.17.2014 N-400 DELIVERED

07.24.2014 N-400 ACCEPTANCE CONFIRMATION LETTER

08.08.2014 FINGERPRINT LETTER

08.18.2014 FINGERPRINT APPOINTMENT DATE

28.09.2014 INTERVIEW LETTER

22.10.2014 INTERVIEW DATE

30.10.2014 OATH CERIMONY FINALLY US CITIZEN!!!!

11.07.2014 US Passport Received!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: France
Timeline

Wow! just 10 business day! I think they don't have any reason to lie, they don't care how many time you need to wait, so if they tell to you this wait time will be so!! happy for you so lucky!

Can I ask to you what kind of documents you missing?

Well I hope its true what they are saying because that means waiting time would be over soon and we are waiting for his visa in order to go on vacation before we go to the sates... so frustrating..... anyhow I submitted my paperwork on june 14 so it should be any matter of day now.... They told me i needed to submitt a copy of my tax return for 2013 even if i did not work..... I know the law does not require me to file taxes if i didnt work and i told them that but the interviewer said regardless of that you need to submit a tax return even with a zero income.... anyhow so i filed my taxes online with zero income and then mailed it the next day to the embassy.... May I ask you what paperwork they requested from you and when your interview was? Also, did the interviewer tell you the same thing :" Congratulations you are approved but in order for us to issue a visa for you your petitioner has to submit a copy of a 2013 tax return?" That sentence there was weird because they could now not approve the visa if they didn't like it ahhhh I am so dissapointed and miserable.....

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline

Well I hope its true what they are saying because that means waiting time would be over soon and we are waiting for his visa in order to go on vacation before we go to the sates... so frustrating..... anyhow I submitted my paperwork on june 14 so it should be any matter of day now.... They told me i needed to submitt a copy of my tax return for 2013 even if i did not work..... I know the law does not require me to file taxes if i didnt work and i told them that but the interviewer said regardless of that you need to submit a tax return even with a zero income.... anyhow so i filed my taxes online with zero income and then mailed it the next day to the embassy.... May I ask you what paperwork they requested from you and when your interview was? Also, did the interviewer tell you the same thing :" Congratulations you are approved but in order for us to issue a visa for you your petitioner has to submit a copy of a 2013 tax return?" That sentence there was weird because they could now not approve the visa if they didn't like it ahhhh I am so dissapointed and miserable.....

Yes, I know how you feel!! but don't worry I think they wanna only be sure you are not income for 2013 year.

They ask to me some criminal record about my father, because in form DS-260 was a question about substance trafficking, so they need to investigate (I think) I'm okey..I have had my interview 21 May, but the interviewer tell me "Thank you for be honest, but I'm sorry to continue your case we need some documents.." :(

Don't worry if they tell you are approved, will be so, just they need to review your send documents!


2FMbp1.png

I-130 / F-2A ( Spouse of LPR ) varie_amore_10.gif

To see every step go to my Immigration Story..

02.13.2012 NOA 1 - PRIORITY DATE

11.20.2013 NOA 2 - APPROVAL DATE

03.07.2014 CASE COMPLETE

04.04.2014 INTERVIEW LETTER

05.20.2014 MEDICAL EXAMINATION

05.21.2014 INTERVIEW DATE

06.03.2014 AP...THE WAIT CAN BE FROM 1 TO 4 MONTHS...

08.08.2014 YET IN AP, STATUS UPDATE DATE CHANGE AT TODAY!! AUGUST 8 !! YUPPY!

08.11.2014 YET IN AP...AT TODAY HAVE PASSED 7 WEEKS (counting business days)

08.12.2014 OMG!! TODAY VISA STATUS SAY READY!!! I can't believe!!!

08.13.2014 VISA STATUS ISSUED!!!!!

08.24.25014 POE

lineacuori.gif

N-400 My hubby's Naturalization varie_amore_10.gif

PHOENIX LOCKBOX

07.14.2014 N-400 MAILED

07.17.2014 N-400 DELIVERED

07.24.2014 N-400 ACCEPTANCE CONFIRMATION LETTER

08.08.2014 FINGERPRINT LETTER

08.18.2014 FINGERPRINT APPOINTMENT DATE

28.09.2014 INTERVIEW LETTER

22.10.2014 INTERVIEW DATE

30.10.2014 OATH CERIMONY FINALLY US CITIZEN!!!!

11.07.2014 US Passport Received!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

My interviewer told me I was basically approved pending sending them another records check since they didn't like the one I had with me. She said it should only take 1-2 weeks and once they had it in their office it would go forward a snothing had happened. She asked me to mail both the check + passport.

1/15/2013 - Married

USCIS:
4/11: Mailed out IR-30 via FedEx Ground
4/15: Forms received by USCIS Chicago (Signed)

12/2: Case Transferred to CSC

12/17/2013: NOA-2!!!! (8 Months, 2 days)

NVC:

12/27/2013: Case received by NVC

1/23/2014: NVC Case #, BIN, & IIN received.

1/31/2014: DS-261 Available & filled out.

2/4/2014: AOS Invoice available & paid

2/7/2014: I-864(AOS) completed & sent

2/11/2014: IV Bill availiable and paid.

2/14/2014: DS-260 completed (IV)

2/14/2014: DS-260 support documents sent

2/26/2014: I-864 (AOS) documents received and logged by NVC.

3/4/2014: Checklist for AOS ( I knew it :|a)

3/5/2014: Checklist for AOS submitted

3/7/2014: DS-260 documents received & logged by NVC

3/13/2014: IV packet + documents approved and logged

4/14:2014: Case Complete!!! (3 months 2 weeks 4 days @NVC)

Consulate:

Medical: 05/28/2014

Interview: 06/03/2014 (?)

Consulate didn't like our police records, have to resend--> AP

APPROVED: 07/02/2014

visa in hand: 07/11/2014

PoE: Halifax Stanfield International (07/25/2014)

REMOVING CONDITIONS:

06/10/2016: Packet Mailed

06/16/2016: Check Cashed

7/11/2016: Biometrics Appointment

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: France
Timeline

Well lets hope we will get out of AP soon like our interviewers told us... its been almost 2 weeks with mine too, please let me know when you receive something so that we can see sone predictions timewise.... I will also post if something happens at my end..... good luck :)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Well lets hope we will get out of AP soon like our interviewers told us... its been almost 2 weeks with mine too, please let me know when you receive something so that we can see sone predictions timewise.... I will also post if something happens at my end..... good luck :)

Please let me know. Sometimes I think this forum is the only thing keeping me sane. I really miss my husband =/.

1/15/2013 - Married

USCIS:
4/11: Mailed out IR-30 via FedEx Ground
4/15: Forms received by USCIS Chicago (Signed)

12/2: Case Transferred to CSC

12/17/2013: NOA-2!!!! (8 Months, 2 days)

NVC:

12/27/2013: Case received by NVC

1/23/2014: NVC Case #, BIN, & IIN received.

1/31/2014: DS-261 Available & filled out.

2/4/2014: AOS Invoice available & paid

2/7/2014: I-864(AOS) completed & sent

2/11/2014: IV Bill availiable and paid.

2/14/2014: DS-260 completed (IV)

2/14/2014: DS-260 support documents sent

2/26/2014: I-864 (AOS) documents received and logged by NVC.

3/4/2014: Checklist for AOS ( I knew it :|a)

3/5/2014: Checklist for AOS submitted

3/7/2014: DS-260 documents received & logged by NVC

3/13/2014: IV packet + documents approved and logged

4/14:2014: Case Complete!!! (3 months 2 weeks 4 days @NVC)

Consulate:

Medical: 05/28/2014

Interview: 06/03/2014 (?)

Consulate didn't like our police records, have to resend--> AP

APPROVED: 07/02/2014

visa in hand: 07/11/2014

PoE: Halifax Stanfield International (07/25/2014)

REMOVING CONDITIONS:

06/10/2016: Packet Mailed

06/16/2016: Check Cashed

7/11/2016: Biometrics Appointment

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline

Hi everyone,

My status at AP changed from administrative process to READY... what does that mean?

I think very soon you can read ISSUED!! Congrats!!


2FMbp1.png

I-130 / F-2A ( Spouse of LPR ) varie_amore_10.gif

To see every step go to my Immigration Story..

02.13.2012 NOA 1 - PRIORITY DATE

11.20.2013 NOA 2 - APPROVAL DATE

03.07.2014 CASE COMPLETE

04.04.2014 INTERVIEW LETTER

05.20.2014 MEDICAL EXAMINATION

05.21.2014 INTERVIEW DATE

06.03.2014 AP...THE WAIT CAN BE FROM 1 TO 4 MONTHS...

08.08.2014 YET IN AP, STATUS UPDATE DATE CHANGE AT TODAY!! AUGUST 8 !! YUPPY!

08.11.2014 YET IN AP...AT TODAY HAVE PASSED 7 WEEKS (counting business days)

08.12.2014 OMG!! TODAY VISA STATUS SAY READY!!! I can't believe!!!

08.13.2014 VISA STATUS ISSUED!!!!!

08.24.25014 POE

lineacuori.gif

N-400 My hubby's Naturalization varie_amore_10.gif

PHOENIX LOCKBOX

07.14.2014 N-400 MAILED

07.17.2014 N-400 DELIVERED

07.24.2014 N-400 ACCEPTANCE CONFIRMATION LETTER

08.08.2014 FINGERPRINT LETTER

08.18.2014 FINGERPRINT APPOINTMENT DATE

28.09.2014 INTERVIEW LETTER

22.10.2014 INTERVIEW DATE

30.10.2014 OATH CERIMONY FINALLY US CITIZEN!!!!

11.07.2014 US Passport Received!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Thailand
Timeline

I hope so, thanks for your support.... good luck to you :)

Yes, you will hear good news by tomorrow or early next week. I and my husband are also waiting, we are on "AP" too. The CO was confused or had a hung over, bec the questions she asked my husband to answer thru letter are wrong. She was asking my husband why he did not comeback to visit me in 1 and a half year. My husband visited me 5 times in 2013, only this year 2014 bec we did not want to spend money again as we are waiting for my visa. And also asked why did he marry me the first time he visited me. Another question, Why did my husband put single on his 2013 tax. My husband amended it and sent it to the embassy. And the rest proofs of our relationship (which I already submitted to them on the day of my interview) but anyway I added more and also asked for a few civil docs (sent to the embassy).

Our case was updated 4 times. The last time is today June 26. I and my husband are really having hard time being apart. We have not seen each other for nearly 6 months. And I have been crying a lot, what makes us both stronger and hopeful now is to pray to god. We are hoping for the good news next week. Well, we will pray for everyone here who are having tough time waiting for visa.

(F) 2013-01-03 - Got married (F) (L) (L) (L)

USCIS

NVC

2013-01-21 - Sent i-130 2014-01-17 - NVC received 2014-04-30 - email for case complete received (got early in the morning)

2013-02-22 - NOA1 2014-02-28 - NVC case number assigned 2014-04-30 - Interview scheduled (by phone in the afternoon)

2013-12-10 got RFE 2014-03-03 - AOS (I-864) and IV bill paid 2014-05-02 - IL received by email

2013-12-23 RFE sent 2014-03-06 - Sent I-864(AOS) Package 2014-05-03 - Case in Transit (checked from ceac tracking)

2014-01-03 Approved 2014-03-07 - DS-260 completed online 2014-05-09 - Case Ready (Ceac tracking)

2014-01-21 - NOA2 2014-03-24 - Received checklist for IV (civil docs)

2014-03-27 - Received checklist for AOS

2014-04-01 - Sent AOS package and original civil docs by our attorney via regular mail (respond to checklist)

2014-04-07 - Received AOS and civil docs package by NVC

2014-04-09 - AOS and civil docs package (checklist) by NVC logged in the system

2014-04-23 - Case completed Consulate

2014-05-05 - Medical done

2014-06-06 - Interview (AP received 221g white form for additional documents, letter from my husband answering the CO's questions in the form ) and proofs (e.g. emails, pictures, call logs, etc which we already submitted during the interview but still I added more evidence such as our FB Private Messages, money transfer receipts and a letter from my husband's bishop to prove that our marriage is real)

2014-06-17 - Status updated still AP

2014-06-18 - Status updated still AP - (the US Emb. received the doc.) 2014-06-19 - Status updated still AP

2014-06-26 - Status updated still AP 2014-07-01 - Status updated still AP - (my husband wrote an email to the CO and he got a reply. - said under consideration)

2014-07-16 - Status updated still AP - (the house of rep. sent them an email and the US Embassy replied to him/her)

2014-07- 18 - USEM received more evidence we sent (Western Union - money transfer receipt).

2014-07- 20 - Status updated still AP (confused bec it is Sunday on the 20th July, maybe scanned the additional docs sent to them)

2014-07- 21 - Status updated still AP 2014-07- 23 - My husband went to the house of Senate and they attended to him right away.

2014-07- 24 - The asst. at the senate responded immediately and contacted the USEM.

2014-07- 28 - Status updated still AP (received an email from the USEM, 1. Applicant, your case is ready to be issued, but your passport #********** needs to be cancelled first & returned to our office at your earliest convenience. Please contact visasbkki@state.gov to pick up your old passport to complete this step.)

2014-07- 28 - Cancelled my old passport and sent them to the USEM.

2014-07- 30 - The embassy received my 2 passports (old and new) 2014-07- 31 - Status updated still AP (Maybe scanned my mail)

2014-08- 08 - Status updated "READY"

2014-08- 13 - Status updated still "READY" I sent them an email re the ready status. Aug. 11 & 12 National holiday USEM closed.

2014-08- 14 - Status updated still "READY" I received an email from the USEM,We have received your said documents. Please be informed that your visa has now been approved. We are working with the preparation of your visa package and will mail it to the applicant address on GSS profile which takes approximately 7-10 days. Applicant should refrain from making any irrevocable travel arrangements until he/she receives.<p>

2014-08- 18 - Visa in-hand

2014-09-07 arrived Atlanta airport

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...